Shield Cable 305mm

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
50 Box m.t.
Supply Capability:
500ton m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Packaging of Shield Shield Cable 305mm

Packaging Detail:

25kg/bag,kraft paper bags with plastic bags inside

Delivery Detail:

15 days

Specifications of Shield Cable 305mm

1,for wire or cable sheath

2,quality SGS and ISO9001

3,delievery time 7 days

4,the highest temperature is 70

 

this product is used for wire or cable sheath.

Delivery of Shield Cable 305mm

PROPERTY

UNIT

SPECIFICATION

TEST

HR-70

JR-70

tensile strength 

Mpa

MORE THAN16.3

≥16.8

GB1040

Elongation at break

%

320

310

GB1040

Thermal agining 100°C 168h

--

--

--

--

tensile strength at aging

Mpa

15.4

16

GB1040

Maximum change rate of Tensile Strength

%

-7.1

-4.8

--

Elongation ate Break after aging

%

300

290

GB1040

Maximum change rate of Elongation at break

%

-11.8

-6.5

--

Weight Loss after Thermal aging

g/cm3

9.6

11.2

--

Thermal deformation

%

45

35

--

Brittle point of Low temperature impact

°C

(-)40pass

(-)40pass

GB5470

Thermal stable time at 20°C

min

100

95

--

Volume resistivity at 20°C

Ω.m

5.6*1010

2.2*1013

GB1410

Volume resistivity at working time of 20°C

Ω.m

--

3.5*109

GB1410

Dielectronic strength

mv/m

28

27

GB1408

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Now the market professional installation monitoring the construction team how much money a point? , As well as cable patch panels and telephone patch panels how much money a point? Is it distance?
Directly to find Dell customer service bar, the general warranty period are free replacement, unless the insurance of the. You can extend the warranty period, it seems you like to do the experiment.
Q:Why this cable has not yet been certified
The manufacture of wire and cable is completely different from that of most electromechanical products
Q:What is the difference between a trunking and a bridge in a weak construction?
If you are talking about the three-core wire, black - ground brown - line of blue - zero line. If it is 3 plugs, your wire is only 2 lines. Then the yellow received L, black received N. The above is the ground wire.
Q:The computer can not open the machine display frequency beyond the scope of the mouse and keyboard do not start can not press F8 how to do
According to the "Power Engineering Cable Design Code" GB-. 5.3.3 only asked for the depth of the cable buried directly: drop the blue skin to the ground depth, not less than 0.7 meters; when located in the roadway or farmland Under the appropriate should be deepened, and should not be less than 1.0 meters. 5.4.3 protected pipe buried in the ground, should meet the requirements under the depth of the pressure and environmental corrosion resistance. Through the uneven settlement of the backfill section and other places to increase the force, it is appropriate to use steel. Another direct burial should be selected armor type.
Q:Home wiring is a good line or a good line? Talk about the difference
LCD TV can not be connected to the top of the box and DVD reasons: the connection line is wrong, you need to re-connect the video cable or high-definition multimedia interface line, component color line. . the first audio and video cable to DVD and LCD TV ("video 1" or "DVD" signal source); . Moreover, the set-top box and LCD TV (HDMI1 . the LCD TV, DVD and set-top box power are open; . according to the source selection, if you want to watch the DVD program, put the signal source to switch to the "high-definition multimedia interface cable (HDMI cable) Video 1 ", if it is to see the set-top box program, put the signal source to switch to" HDMI1 ". . so that put DVD and set-top boxes are also connected to the TV.
Q:Automotive wiring harness welding to pay attention to what the problem
When the lighting circuit and the power circuit shared ladder, BV line is not allowed to put in the ladder, so it is recommended to use the wiring of the lamp ZC-YJV-3 * 2
Q:Seeking the basement of the outer wall piercing the cable after the casing, how to solve the water (200 points online)
To be considered is the Great Wall power line is not long enough, the power is not big enough to see the power on the label, if the 12V to 15A or more I think will be more stable, my Dell machine power cord surprisingly short, but also To buy the extension line again.
Q:What is the cable for rvv? Is it a power cable or a control cable? What is the cable?
Multi-core cable should be cable number, if not, should first use the table to find and put on the line with the tube.
Q:Cable YJV-3 * 70 + 2 * 35 general wear large SC tube? Ask you.
Charging line and the phone does not match, for the good point of the line just fine
Q:A five-hole dual-socket how to connect the wiring, the electrician line to go three lines, the switch can use a single socket did not take their own hands
This is too difficult to give you a way to just try: with a fine wire rope, that is, lift the clothes on the stick so thick, the end of a bend, with a tape wrapped around the head, try can not wear, wear When the possibility of rotating wire rope, if you can go through the success of the half, the key is to use the wire through the more difficult, can only use the cord, hard-line 100% make life difficult.

1. Manufacturer Overview

Location Dongguan, China
Year Established 2005
Annual Output Value USD50,000,000.00
Main Markets Southeast Asia;Mid East; Domestic Market
Company Certifications ISO9001-2000

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Guangzhou
Export Percentage 70% - 80%
No.of Employees in Trade Department 50 People
Language Spoken: English; Chinese
b)Factory Information  
Factory Size: Above 100,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered; Design Service Offered
Product Price Range High; Average