• Separation Type Hydraulic Crimper for Cable  CYO-400B System 1
Separation Type Hydraulic Crimper for Cable  CYO-400B

Separation Type Hydraulic Crimper for Cable CYO-400B

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
1000 Piece/ pieces per month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description  

Product  name

Separation Type Hydraulic Crimper for Cable  CYO-400B

Min order

10 Piece/  Pieces

Capacity

10000  piece/ pieces per month

Technical Parameters  

Model

CYO-400B

Crimping  Force (T)

12

Crimping  Range (mm²)

16-400

Ram Stroke  (mm)

32

Weight   (kg)

4.7

Standard  Mould (mm2)

507095120150185240300400


Packaging & Shipping

Delivery  time

15~20 days  after deposit

Export  market

Asia,  America, Europe, Africa, markets.


Our Services

1.    Reliable Supplier

2.   High  Quality

3.   Standard  Producing Technology

4.   Competitive  Factory Price

5.   Fast  Delivery

Product Picture:


Functiondescription:

1, Suitable for transmissionand distribution house outside engineering, allkinds of connectionhardware overhead and undergroundcables for professional use

2, High voltage cable sleeve, clamp, bareterminal, sixangle to press, close isnot easy to fall off, good electrical conductivity.

3, When the mould size is not suitable, welcome toorder customized.

4, pipe joints withPT3/8 "teeth



Other more Crimper:









Q:What are the main materials in the building?
It determines the building's rugged, durable, applicable, economical and beautiful. Building materials accounted for more than 60% of the total project fee. It is necessary to study the raw materials, composition, structure and characteristics of various materials in order to rationally select and correctly use the building materials.
Q:What are the tools for the inspection of process engineering in construction projects?
4 wedge-shaped feeler 150 × 15 × 17 1-15 0.5 5 magnetic line falling hammer 300g 6 100 grid grid 240 × 115 × 3 standard brick 0.5% 7 detection mirror 105 × 65 × 11
Q:What are the three major tools in construction?
General terms of the construction industry, refers to the construction site used in the external walls, interior decoration or high height can not be directly the construction site. Mainly for the construction staff to work up and down or external safety net enclosure and high-altitude installation components, said white is the shelf
Q:What are the building hardware tools?
Cutting hoods, chain hoists, chain hoists, hacksaw, plum wrenches, sliver wrenches, pipe pliers, screwdrivers, wire pliers, hammers, test pencils, Sledgehammer, hammer, pendant and so on.
Q:What are the commonly used tools for construction workers on construction sites?
Sometimes to deal with some minor problems, but also have wrenches, shovels, hoe or something, and sometimes some things let the workers come again really do not catch the trip, so are themselves on the! And then like some hammer, electric ho, angle grinder, cutting machine or something, you can use the bad, but must be a little.
Q:What art tools do art need? Learn what?
Art Architecture (Architecture), in a broad sense, is a study of buildings and their surroundings.
Q:What software is needed in the construction industry?
Budget software, project budget software is the construction, decoration industry used to calculate the project cost (to do the project budget) tool software.
Q:Construction safety supplies are what
The construction enterprise shall establish and maintain the safety management files of the construction facilities, equipment, labor protection articles and related safety testing equipment, and record the following contents: 1, source, type, quantity, technical performance, service life and other static management information, as well as the current Use the location, the use of state, the use of responsible persons, testing, routine maintenance and other dynamic management information;
Q:What are the tools for the construction site level?
Construction workers in the construction site to do the main line of defense, technical exchanges, supervision and inspection of the quality of work. So the tools to use are there
Q:Level 1 Registered Architects Site Design Draws what tools to use
Is the kind of special thin paper, not sulfuric acid paper, has been your finishing program), pencil 2B, drawing paper (when the general examination is not allowed to bring, are people to prepare for you), eraser, triangular plate (drawing Dedicated), scale, curve board, rub the picture

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products