Semi-rigid Flexible Aluminum Air Duct/Tube of CNBM in China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m
- Supply Capability:
- 50000000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Zhejiang China (Mainland) | Brand Name: | Hushi lida | Type: | Ventilation |
Packaging & Delivery
Packaging Detail: | one piece one carton |
Delivery Detail: | 10-20days |
Specifications
non-insulated aluminum flexible duct
extension rate:1:10
Low /medium pressure central HVAC system
flame and heat resistant
Aluminum ventilation hose aluminum foil air duct expandable aluminium ducting
Material:
Double layers of aluminum foil reinforced with high tensile spring steel wire
Structure: High elastic wire, aluminum foil. A reinforcement model can be required.
Aluminum foil thickness: 0.035mm
Temperature range: -30°C~+140°C
Maxim Air Flow: 30m/s
Maxim working pressure: 2500 pa
Standard Length: 10m/pc Or as your requirement
Fire resistance: Non flammable.
Normal packing: In carton. Or as your requirment
Application: Low /medium pressure central HVAC system and ventilation system.
Application: Used in gigh pressure,low pressure air conditioner and ventilation system,easy installation, anti-temperature and inflaming retarding etc
Spec. | O.D.(mm) | I.D.(mm) | Length(M/PC) | |
2" | 54 | 50 | 10 | |
2-1/2" | 68 | 64 | 10 | |
3" | 80 | 76 | 10 | |
4" | 106 | 102 | 10 | |
5" | 131 | 127 | 10 | |
6" | 156 | 152 | 10 | |
7" | 166 | 162 | 10 | |
8" | 204 | 200 | 10 | |
10" | 258 | 254 | 10 | |
12” | 310 | 305 | 10 | |
12 1/2“ | 320 | 315 | 10 | |
14" | 362 | 356 | 10 | |
16" | 412 | 406 | 10 | |
18" | 463 | 457 | 10 | |
20" | 514 | 508 | 10 | |
22" | 565 | 559 | 10 | |
24" | 616 | 610 | 10 |
- Q:Will the embedded stove why use stainless steel corrugated hose connection?
- The construction of the scaffolding of this project is subject to the requirements of the relevant sections of the latest JGJ130-2011 "Safety Code for Construction Fastener Steel Scaffolding" To design and calculation, the preparation of special safety construction program, after the implementation of the approval. The preparation of the steel pipe should be selected first vertical and horizontal spacing and horizontal bar step, only these are determined in order to calculate the amount of steel pipe.
- Q:How to strengthen the construction management and construction quality control
- Combined with national energy Policy, and then according to the design of the various properties of insulation materials, calculated through a complex calculation process is not free to set the thickness.
- Q:Maintenance Skills of Leakage of Fire Pipe Clamp Joint
- On the use of steel pipe rack (double pole) support, the specific step to be self-checking, if it is 9 meters high, should be taken out of the full frame, the middle of the spine set must be standardized, in fact, we usually do high-level conversion layer beam is very common You share the board as a beam {face - line load}. On the line is not very complicated. Circular arc positioning to be accurate, first to do stereotypes better.
- Q:How is the flexible tube of FRP composite pipe defined
- Filling system is also used to close the molecular structure, you can put an end to the condensation of water vapor
- Q:How is the flexible casing of the fire pond connected to the tube?
- Composite tube: in a tube of the tube with more than two electrode system, each electrode system independently through the electronic flow, to achieve their own functions, this tube is called composite pipe
- Q:Find a joint electronic M1.5.4 type ECU application system wiring harness and layout Thank you, anxious! The
- 1.5M is the thickness of the board? If it is, in view of the large amount of concrete from the major, then the long spot of the short spot of the prisoners need to pay special training program reported to the chief engineer or expert approval, which is also the most important [template bearing capacity design calculation], proof of design Of the construction program to meet the bearing capacity of concrete to ensure that the template and its bracket should have sufficient carrying capacity, stiffness and stability, can reliably withstand the weight of pouring concrete, side pressure construction load. In recent years, because the construction of non-standard template led to the collapse of a lot of scaffolding, hope to be cited
- Q:Plastic tube most afraid of what the East unitary
- In general, polyurethane sandwich panels can be used in a variety of building needs, including industrial plants, public buildings, combined housing, purification projects and other construction areas
- Q:Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
- First, according to its structure can be divided into: scaffolding according to its structure can be divided into: multi-pole, bowl button, door type, square tower, attached lift frame and hanging scaffolding. Second, the knowledge expansion: scaffolding by setting the form can be divided into: single row scaffolding only a row of pole scaffolding, the other side of the horizontal bar on the wall structure. double scaffold scaffolding with two rows of poles. multi-row scaffolding with more than 3 rows of pole scaffolding. full of scaffolding according to the scope of construction work full, both directions have more than 3 rows of pole scaffolding. Full scaffolding The maximum height of the wall or construction work, the scaffolding set by the height of the ground. Scroll (Peripheral) Scaffolding Scaffolding that is set up and intertwined along a building or range of work. Scaffolding Scaffolding with special flat and space shapes, such as for chimneys, water towers, cooling towers and other flat, circular, "outer", polygonal and upper, Form of construction scaffolding.
- Q:What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
- According to the requirements of the "Construction Engineering Safety Protection and Civilian Construction Measures Fees and the Use and Management Regulations", the document shall include at least the following parts: 1. Safety equipment: safety nets, safety belts, helmets, etc .; , The entrance and the edge of the protection facilities: stairs, elevator, channel mouth, reserved hole, balcony around the floor around the roof around the foundation pit, unloading platform on both sides of the platform and the upper and lower access and other security facilities; . tower cranes, external elevators, well frame hoists and other construction works from the construction of the steel, the use of high-quality steel, Heavy equipment and supporting protective facilities; Fifth, the construction of electricity: in line with regulatory requirements of the temporary electricity system, the standardization of electrical boxes, electrical protection devices, power lines laying, foreign protection measures, etc .; six, construction machinery; : Including the construction of lifting equipment and external elevators, safety nets, steel scaffolding and other detection. Ten, safety education and training; nine, safety signs, signs and safety publicity column; ten, civilized construction and environmental protection: construction site fencing and site hard ground, dust control, noise control, drainage measures, , Temporary facilities: including offices, dormitories, cafes, toilets, shower, etc .; . fire equipment and facilities; thirteen, emergency rescue equipment; . foundation pit deformation monitoring; fifteen, underground safety Protection and monitoring.
- Q:We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
- Construction workers classification and breakdown of ordinary types of work
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Semi-rigid Flexible Aluminum Air Duct/Tube of CNBM in China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m
- Supply Capability:
- 50000000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords