Schindler Escalator Parts

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Piece set
Supply Capability:
1000 Pieces per Day set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick details

 

Packaging & Delivery

Packaging Details: Export standard package. The goods will put into box and boxes put on the pallet.

Delivery Detail:10days after the order confirmed

 

Schindler  Escalator parts.

High quality Schindler Escalator/Elevator parts for your reference.

We can supply all Schindler Escalator/Elevator parts for your installtion or maintenance.

Specifications

Step For SCHNDLER Escalator-Schindler escalator parts

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many types of elevator its basic functions, the basic decorative configuration, matching features are those?
Can be loaded up and down the stairs, bring convenience!
Q:You brother ah, sister who can give me a complete waterproof construction program
You go to Google search download after the change is not on the line. Even if someone else you have to change because of sometimes construction and other reasons
Q:Inside the restaurant such as the kitchen in the 1L and then the food to the top of the restaurant inside a machine called what name?
Elevator or lift
Q:What are the contents of the elevator maintenance?
Please elaborate...
Q:How to do elevator maintenance staff
Commissioned to the qualification of the unit or the original manufacturing unit for daily maintenance. Maintenance and maintenance of the number of quality supervision; check whether the maintenance unit on time to maintain maintenance personnel maintenance elevator, whether according to the provisions of the time-by-day maintenance. Security personnel to provide a valid qualification certificate and do a good job in each maintenance note
Q:What is the chemlon 533G material?
Is it a chemical material?
Q:Grocery elevator is always automatically anti-leveling what is the reason
The motherboard set the time to return to the base station, or lock ladder are likely to have this problem
Q:What are the general items of a construction project
Appendix B Construction Division (sub-division) project, sub-project division B.0.1 Construction Division (sub-division) project, sub-project can be divided according to Table B.0.1Appendix B Construction Division (sub-division) project, sub-project division B.0.1 Construction Division (sub-division) project, sub-project can be divided according to Table B.0.1...
Q:In the airport shopping mall and other public places up and down the stairs or escalators should rely on what to stand?
On the right side to let the left side of the channel, the left for the fast track
Q:Hitachi Elevator out of 61 with 93110 fault door door lock after the opening of the arrow outside the instructions flash how to repair
My idea, you should look at the motherboard on those who help the rafts of the river, the number of lights, which should be working properly but did not light up to determine the cause of the malfunction to find the cause of the fault and then Discharge, I only compare the new motherboard when the line, as you said this problem if it is not a safe circuit and the door of the security problem, it should be the issue of the vessel recommended you to measure the external call power supply voltage (all Flash), there is a possibility that there is a short circuit of the external call board, and I have encountered such a situation. The other is gone
Our mission is to provide the BEST elevator and escalator spare parts in the world by dedicating our resources. Sincerely welcome both domestic and foreign friends to join hands with us and create a brilliant future together. You can send us inquiry at any time and we will response promptly to all your requests within 24 hours, offering satisfactory services.

1. Manufacturer Overview

Location Jiangsu,China (Mainland)
Year Established 2006
Annual Output Value US$50 Million - US$100 Million
Main Markets North America; South America; Eastern Europe; Southeast Asia; Africa; Oceania; Mid East; Eastern Asia; Western Europe; Central America; Northern Europe; Southern Europe; South Asia; Domestic Market
Company Certifications ISO Certificate

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Taicang PORT,Shanghhai PORT
Export Percentage 41% - 50%
No.of Employees in Trade Department 6-10 People
Language Spoken: English, Chinese
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines 3
Contract Manufacturing OEM Service Offered Buyer Label Offered
Product Price Range Low and/or Average