• Sandwich Board  From  Best Chinese Steel Plate System 1
  • Sandwich Board  From  Best Chinese Steel Plate System 2
  • Sandwich Board  From  Best Chinese Steel Plate System 3
Sandwich Board  From  Best Chinese Steel Plate

Sandwich Board From Best Chinese Steel Plate

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
323 m.t.
Supply Capability:
234234 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1.Structure of Prepainted Galvanized steel Coil :

With Gi as base metal,after pretreatmet (degrease and chemical treatment) and liquid dope with several Layers of color,then after firing and cooling,finally the plate steel is called pre-painted galvanized steel ( PPGI) .Pre-painted galvanized steel is good capable of decoration ,molding,corrosion resistance 

2.Main Features of Prepainted Galvanized steel Coil

• Excellent process capability

• Smooth and flat surface

• Workability, durability 

• Excellent heat resistance performance

• High strength

• Good formability

• Good visual effect

 

3.Prepainted Galvanized steel Coil Images

 

Sandwich Board  From  Best Chinese Steel Plate

Sandwich Board  From  Best Chinese Steel Plate

Sandwich Board  From  Best Chinese Steel Plate

 

4.Prepainted Galvanized steel Coil Specification

Standard:ASTM, GB,JIS,JIS G3302 ASTM 755 EN10169

Grade: DX51D CGCC CS 

Thickness: 0.13mm~3.0mm,

Width: 1250,600-1250mm

Coil weight:3-12 MT

Coil ID:508/610mm

Chemical composition:

C

Si

Mn

Cr

Ni

P

S

0.150

0.476

11.231

12.50

0.900

0.039

0.010

 

 

5.FAQ of Prepainted Galvanized steel Coi

We have organized several common questions for our clients,may help you sincerely: 

1.How do you control your quality 

We have established the international advanced quality management systemevery link from raw material to final product we have strict quality testWe resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

 

2.how long we will receive the goods 

After receiving your deposit or workable lc ,our normal shipment date is 15-20days,and it takes around 28 days to reach your port of destination. But is up to different destination 

 

3. what is your moq 

 Normally our moq is 25per size ,but it is up to different size 

Q:What is the third-party warehouse function and responsibility?
Effective use of resources. The use of third-party warehouses is more effective than self-built warehouses to deal with the seasonal production of ubiquitous products in the light, season storage problems
Q:How to do warehouse management?
the saying goes, troops and horses are not moving grass first. Do a good job of warehouse management work
Q:What is the daily work of the warehouse?
use, type of different categories to establish the corresponding ledger, card
Q:How can I manage the warehouse better?
to keep the inventory of goods, so that the number of accurate, good quality, to ensure safety
Q:Recruitment of warehouse staff and warehouse manager of the quality requirements?
have a good professionalism, motivated, flexible response, work seriously responsible
Q:What do the warehouse keeper have to do and what should I pay attention to?
First, according to the provisions of materials and equipment out of the library acceptance, accounting and payment work, so that accounts match.
Q:How to do a good job Warehouse Invoicing?
Any enterprise can not be separated from the system constraints, only the standardization of all business processes can greatly improve the efficiency of enterprises
Q:How to reduce warehouse costs?
but rarely get the attention of enterprises. Some companies, although noted that should reduce the inventory
Q:What are the processes required for the company's warehouse management?
Inventory management, all the items in the warehouse should be classified storage, and to organize at any time to ensure that the physical inventory and the report match.
Q:What is the meaning of goods warehousing?
Modern "warehousing" is not the traditional sense of the "warehouse", "warehouse management"

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products