Prefabricated House with Good Quality for Hotel
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 6000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Prefabricated House with Good Quality for Hotel
1.The following pictures are our 100,000 square meter production base & model houses for showing: We have eight production lines, production capability reach to 600,000 square meters per month.
Up to now, we have cooperated with more than 70 countries:
2. Assembly Instructions:
3.Our management system:
4.We can offer with the following products:
5. FAQ:
1.How about the installation? For example, the time and cost?
To install 200sqm house needs only 45 days by 6 professional workers. The salary of enginner is USD150/day, and for workers, it's 100/day.
2.How long is the life span of the house?
Around 50 years
3. And what about the loading quantity?
One 40'container can load 140sqm of house.
- Q:What is the third-party warehouse function and responsibility?
- can effectively use equipment and space, while third-party warehouse management is professional
- Q:How to do warehouse management?
- the saying goes, troops and horses are not moving grass first. Do a good job of warehouse management work
- Q:What is the daily work of the warehouse?
- use, type of different categories to establish the corresponding ledger, card
- Q:How can I manage the warehouse better?
- to keep the inventory of goods, so that the number of accurate, good quality, to ensure safety
- Q:What do the warehouse keeper have to do and what should I pay attention to?
- Second, keep abreast of the inventory status, to ensure timely supply of materials and equipment, give full play to the efficiency of turnover.
- Q:How to do a good job Warehouse Invoicing?
- Any enterprise can not be separated from the system constraints, only the standardization of all business processes can greatly improve the efficiency of enterprises
- Q:How to reduce warehouse costs?
- Warehouse as a corporate material storage and turnover of the place, but also the equivalent of corporate funds precipitation area and the transfer area.
- Q:What are the processes required for the company's warehouse management?
- Out of the library management, so the library items must be filled out the library, at the same time in the report to do the corresponding out of the library operation to ensure that the inventory of the account match.
- Q:What are the benefits of warehouse outsourcing?
- Warehouse outsourcing does not require the enterprise itself to be in the allocation of warehouse personnel, operating equipment, etc. must be put into the hardware facilities.
- Q:What is the relationship between logistics and warehousing?
- This shows that warehousing is only one of the logistics activities, logistics and other activities
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Prefabricated House with Good Quality for Hotel
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 6000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products