PREFAB HOUSE LOW COST AND NICE DESIGN 005
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1600 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q:How to do warehouse management?
- In order to make the work of the unit in an orderly manner, the warehouse work is very important
- Q:What is the daily work of the warehouse?
- use, type of different categories to establish the corresponding ledger, card
- Q:How can I manage the warehouse better?
- Warehouse is an important part of the enterprise material supply system, is the enterprise material turnover reserve link
- Q:Recruitment of warehouse staff and warehouse manager of the quality requirements?
- Familiar with the warehouse operation process, computer operating skills, engineering warehouse experience is preferred
- Q:What do the warehouse keeper have to do and what should I pay attention to?
- ? Third, the regular clean-up of the Treasury, to keep the Treasury neat and beautiful, so that the classification of materials and equipment, storage neatly, the number of accurate.
- Q:How to do a good job Warehouse Invoicing?
- Any enterprise can not be separated from the system constraints, only the standardization of all business processes can greatly improve the efficiency of enterprises
- Q:How to reduce warehouse costs?
- but rarely get the attention of enterprises. Some companies, although noted that should reduce the inventory
- Q:What are the processes required for the company's warehouse management?
- In addition to the above three points, there is the inventory, according to the company's request, usually in a billing cycle of the starting point, the inventory will generally be on the warehouse in the stagnant goods or defective products to do The
- Q:What is the meaning of goods warehousing?
- Warehousing logistics, is the use of self-built or leased warehouse, site, storage, storage, handling handling, distribution of goods
- Q:What are the benefits of warehouse outsourcing?
- Warehouse outsourcing does not require the enterprise itself to be in the allocation of warehouse personnel, operating equipment, etc. must be put into the hardware facilities.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
PREFAB HOUSE LOW COST AND NICE DESIGN 005
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1600 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches