• P816 Road Roller BuyST212JRoad Roller at Okorder System 1
  • P816 Road Roller BuyST212JRoad Roller at Okorder System 2
P816 Road Roller BuyST212JRoad Roller at Okorder

P816 Road Roller BuyST212JRoad Roller at Okorder

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
300 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Name:P816 Road Roller

Parameter:


ModelUnitP816
Min. working weightkg11100
Max. working weightkg16000
Ground pressurekPa200-400
Travel speedkm/h 
 Speed I4.2
 Speed II8.2
 Speed III17.4
 Reverse speed I4.17
 Reverse speed II8.2
Theoretical gradeability%20
Min. external turning radiusmm7230
Min. ground clearancemm250
Compaction widthmm2055
Roller overlap amountmm30
Tyre specification 9.00-20-12PR
Amount Front 4 Rear 5
Engine model YC4A125Z
Type Water cooling, pressurizing
Rated powerkw @2200 r/min92
Engine oil consumptiong.kw/h≤230
Hydraulic oil tank capacityL60
Diesel oil tank capacityL130
Overall lengthmm4715
Overall widthmm2055
Overall heightmm3258

 

 

 


Advantages:
 

state-owned company

fortune 500 company

AAcustom


P816 Road Roller BuyST212JRoad Roller at Okorder 

 

P816 Road Roller BuyST212JRoad Roller at Okorder

 


 


Why choose us?

1 sincre

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the equipment such as tower cranes, produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to solve all your tower crane installation and other questions.  Our goal is to provide the best professional services.

3 quality

 CNBM International’s tower crane  have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.


Inquies FAQ

My dearest friend, if you want to buy our tower cranes, please tell us the following parameters. And we will make the most suitable project for!

1. Building height or tower crane working height.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements




Q:The second-hand roller Road on Taobao won't lie
It's not deceptive, but it depends on the fineness of the rollerAskDo you go to the place he sells?Chasing the answerOf course
Q:How about a beginner? Drive a roller
In accordance with the operation of the wheels and the road along the road of slowly fine-tuning, go back to see just the pressure line as a reference, a large operation is more simple, first out of a straight line, then straight to the reference.
Q:Is there any difference between vibratory roller and vibratory roller?
In addition to the word used, the function of pointing is a professional roller
Q:Sheepsfoot road and a distinction between what work?
Sheepsfoot do stone dam project is still alive.A main work on earth, no difference, and the effect on.
Q:May I ask who knows the vibration Shantui 22 tons roller much money, thank you
Are you going to buy it?! If you want to buy I can help you ask, my home is in Jining City, my friend in mountain plant, and can be a lot of money.
Q:Brief introduction of vibratory roller with double steel wheels
Double steel wheel, high frequency;Extraordinary compaction efficiency;Automatic starting system;Vibration frequency meter patent design;Unique sprinkler system.Run heavy l volume: 11300 kgSteel wheel width: 2000 mmVibration frequency: 42HZ/63.3HZ
Q:How many rollers are there in the roller?
Full hydraulic pre vibration of double steel wheel.Tire type roller mill, single or full shaft.
Q:Brief introduction of tyre roller
The compacted asphalt mixture conforms to the requirements of compactness and smoothnessSelect reasonable roller combination method and rolling steps to achieve the best results. The asphalt mixture is compacted by a steel cylinder type static roller and a tire roller or a vibratory roller. The number of rollers is determined according to the production site.The compaction of asphalt mixture is carried out in three stages: initial pressure, compound pressure and final pressure (including molding). The roller is rolled at a slow and uniform speed.The initial pressure of asphalt mixture meets the following requirementsThe initial A. pressure roller soosai eng DD-110 in mixture paving after high temperature, and shall not have any time, hair crack, compaction temperature according to the consistency of asphalt, roller type, temperature paving layer thickness, mixture type is determined by the pressure test with test.B. roller is rolled from the outside to the center. The adjacent rolling zone should overlap with 1/3 - 1/2 wheel width. At last, the center part of the rolling road will be compressed at full amplitude. When the edge of the baffle, kerb, shoulder and other files, should be close to the file roller. When the edge without retaining, can mix the edge rake rake slightly high, then the outer wheel roller rolling out 10cm above the edge.
Q:Do we have to use rubber wheels? Is there a mandatory rule?The fine-grained AC-13 is ready to let the builders use the rubber wheel, but the builders say the rubber wheel is rarely used. Would I like to know if this is necessary?
4, only SMA prohibits the use of rubber wheel rolling, because the rubber wheel will destroy the structure of SMA5, the construction side said that rubber tire is rarely used as an excuse, under normal circumstances, in addition to the use of rubber wheel SMA6, for fine-grained AC-13, if not steel wheels, the problem is not large, if not rubber, certainly not
Q:How much is the rubber tyred roller?
Do you know if there are any special configurations for rubber tyred rollers? The installation of a rubber roller automatic injection device, the cost of oil workers saved the 4 month salary can arrive out of a fuel injection device, can also avoid the rubber roller to wipe the oil workers accident a year according to the 6 month period can save eighteen thousand yuan, installed since 2012. 5 years, has been the effective use of life, constantly refresh the record.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords