HLSS360 Hydropower dedicated concrete mixing plant
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
HLSS360 hydropower concrete mixing plant from NFLG is a pre-cooled concrete mixing plant which boasts biggest capacity in terms of common and compactedconcrete. It’s fitted with cooling fan and ice adding device and mainly applied in construction of big scale compacted concrete hydropower project. It could meet stringent requirements of such projects in terms of work intensity and huge volume work.
1. Brief introduction:
HLSS360 hydropower concrete mixing plant from NFLG is a pre-cooled concrete mixing plant which boasts biggest capacity in terms of common and compactedconcrete. It’s fitted with cooling fan and ice adding device and mainly applied in construction of big scale compacted concrete hydropower project. It could meet stringent requirements of such projects in terms of work intensity and huge volume work.
2. Characteristics
1) Huge output, meeting construction requirement;
2) Highly efficient;
3) reliable;
4) smart control system, simple operation;
5) In terms of structure the plant consists of main tower and accessory tower. The former one, from top to bottom, consists of: feeding section, material bins, cooling fan, distribution maintenance section, mixing section and output section. Two big hydropower mixers are independently located on the mixing platform of mixing tower’s framework. Cement and fly ash silos, control room, stairs and corridor are located on the accessory tower. The main tower and accessory tower are separated so that it improves work environment and precooling of aggregate. External cover of towers are made of sandwich steel plate, rendering an elegant and pleasant appearance.
No. | Concrete type | capacity(m3/h) |
---|---|---|
1 | 2-class compacted concrete | 330 |
2 | 12℃ pre-cooled 2-class compacted concrete | 170 |
3 | 3-class compacted concrete | 330 |
4 | 12℃ pre-cooled 3-class compacted concrete | 230 |
5 | 4-class common concrete | 360 |
6 | 12℃ pre-cooled 4-class compacted concrete | 230 |
- Q:What is precision machinery?
- would it means CNC computer numerical control machinery? u use computer to draw and cut the desirable object using numerical control machinery. since it is draw and cut by computer, the output object is very accurate.
- Q:I have made my own clock system and it would only work if the clock goes round once in 86400 seconds - in one day instead of twice. So what do I have to do with my clock to make that work? btw. I'm not talking about a digital clock-
- Check the back of it to see if there is a 12 hour setting and 24 hour setting. You might be able to just flip a switch.
- Q:How to make simple account for construction machinery rental?
- Bank loans: other business income, while carrying costs: other business costs: accumulated depreciation
- Q:What does the construction cost include?
- 1. direct cost refers to the construction cost of the formation of Engineering entities and contribute to the formation of the various costs, including labor costs, materials costs; construction machinery use fees. (1) labor cost refers to the expenses directly involved in the expenses of the production workers in the construction and installation works.
- Q:i want to manufacture 2 gb and 4 gb micro sd memory card for mobile devices . do someone help me by suggesting the manufacturing machinery supplier and raw material supplier .
- If you have to ask that question then you can't do it. The machinery in the semiconductor industry is very expensive to buy and maintain and there are allot of different machines needed made by many different suppliers. Raw materials would include Silicon, Chlorine, Hydrofluoric Acid to name very very few. You would also need a clean-room to manufacture these in. Have you got a clean-room? If not that will cost millions before you even buy any machines.
- Q:Cable cars in hilly San Francisco are pulled along by an endless cable between the rails, which is driven by machinery in a centrally powerhouse
- Cable cars in hilly San Francisco are pulled along by an endless cable between the rails, which are driven by machinery in a central powerhouse. 'Rails' is plural, so you use the plural verb 'are' for it. 'Central' is correct, rather than 'centrally'.
- Q:i am running a small art business and i am looking for some money even refundable to buy machinery costing approximately U$ 2 500 , need help, i don't know where to start.
- Go okorder and apply
- Q:Where can my client find brochures for medical supplies manufacturing machinery?
- He would need to know the manufacturer of the machine.
- Q:I have got 13 years of exp.I have scored minimum band 6 in IELTS.Now with the recent changes I am becoming eligible for Immigration.Pl tell me how far I can have a decent living with my kid and spouse and save money in Australia.I have done BBA by correspondence.I am planning to immigrate to Perth in Western Australia.Is it possible to save 1 Lac INR per month.Thanks in advance
- You will not have trouble finding a Job in the mining industry.
- Q:If Obama outlaws agricultural machinery, wouldn't that create lots of jobs for cotton-pickers?
- But then we?d have to hear ppl singing blues out on the cotton fields at all hours of the day. The neighbors would complain.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
HLSS360 Hydropower dedicated concrete mixing plant
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords