Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
1000 m³
Supply Capability:
50000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:



The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.


If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.


2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.


4. Packing choice:


(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.


(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:


 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to classify real estate?
The main categories are as follows: 1 by use (function) division. According to this classification criteria, can be divided into residential real estate market and non - residential real estate market two categories.
Q:What are the categories of real estate?
As the real estate is composed of land and ground buildings, structures, for land and housing can be classified according to the following methods:
Q:How is the real estate sales invoice open?
The paper format of the invoice is the same, but the distinction between pre-payment and settlement of the two cases
Q:The future of real estate?
5 million 36 million sets of affordable housing construction (More than 12 trillion yuan of investment
Q:According to the use of housing classification?
1, residential 2, industrial plants and warehouses 3, shopping malls and shops 4, office buildings
Q:How is the real estate industry like?
real estate business, including the transfer of land use rights, rental, mortgage and housing transactions leasing, mortgage and other activities
Q:Real estate in the "five card" which five?
Construction project planning permit" is the construction project in line with the requirements of urban planning legal evidence;
Q:What is the real estate from the law?
Real estate refers to the land, buildings and fixed in the land, the building can not be separated from the part and its accompanying benefits.
Q:Real estate business, when to carry forward the cost?
statements and a series of information, and engineering, budget, sales, finance and other departments, the vast amount of work
Q:What kind of factors in our housing market?
they will release a huge purchasing power and demand, thereby stimulating the development of China's real estate

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range