Early Prop Head Formwork for Whole Aluminum Formwork
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Whole Aluminum Formwork-Early Prop Head Formwork
It works with steel prop to support whole aluminum formwork construction.
2. Main Features of Whole Aluminum Formwork
-Quick construction 4 day for 1 story
-High rate of turn over
-Convenient with steel prop use
3. Whole Aluminum Formwork Images
4. FAQ of Whole Aluminum Formwork-Early Prop Head Formwork
1) What can we do for you?
.We can ensure the quality of the early prop head formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What promises can be done by us?
. If interested in this kind of early prop head formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issues.
3) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: wood package and adhesive tape
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.
- Q: What is the development prospect of aluminum template design?
- I estimate that the next three years, to do the aluminum alloy template design is still very popular, but I still recommend not to circle their own in the aluminum template design circle, because the industry is really small .... technology is mutual Plagiarism (I do not have heart burst shady), if he really want to be a designer, I recommend to the road to the building to go ....
- Q: In the Sheng-aluminum template installation workers, how to develop prospects
- Can go to feel, the elimination rate is very high, most of them are left, remember: have the strength to be able to endure hardship, to listen to Sheng Sheng, if you do not need special money, and physical fitness is not good, labor intensity More than your imagination
- Q: What is the change in the aluminum template?
- Aluminum template design research and development and construction applications, is a major development of the construction industry, the standard aluminum template is also in accordance with the needs of national society, to create a professional green construction, green building, environmental protection and energy conservation, efficient construction industry leading building aluminum template The
- Q: Now the domestic use of aluminum template project more?
- Traditional template construction cycle is long, dirty, chaotic, noise, resulting in a large number of construction waste, building materials, resource consumption, high labor costs, and the construction quality is difficult to guarantee. Compared to the traditional construction methods, the use of aluminum alloy template floor can be a whole casting molding, flatness and verticality better, smooth surface plastering, and can be reused more than 200 times. This can not only save a lot of manpower, material, but also can be recycled, energy saving and environmental protection, significant economic benefits.
- Q: Whether a shear wall aluminum template and wood template can be mixed
- The high strength and stability of the aluminum template are good, and the surface roughness of the concrete is high and the precision is high, which can be removed from the surface. The fixed method is simple and quick,
- Q: Aluminum template of the aluminum template advantage characteristics
- Standard, versatility. Aluminum template specifications, according to the project using different specifications of sheet metal assembly; use of the template to transform a new building, just replace the 20 or so non-standard board, can reduce costs.
Send your message to us
Early Prop Head Formwork for Whole Aluminum Formwork
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords