Concrete Pump Truck Best Price of 24-58meters
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Truck Best Price of 24-58meters
Product Details
Basic Info.
Model NO.:HTD5180THB-24/3
Type:Concrete Pump
Shotcrete Type:Wet
Machining Process:Hydraulic
Structure:Rotor Type
Productivity:90㎡/h
Feeding Height:1400mm
Vibrating Amplitude:1.2mm
Certification:ISO9001: 2000, CE
Condition:New
Color:White
Export Markets:Global
Additional Info.
Trademark:SINOTRUK
Packing:Nude
Standard:SGS, GOST
Origin:China
Production Capacity:500, 000 Unit/Year
Product Description
Model | HTD5180THB-24/3 | Model of chassis | SINOTRUK | |||||
Weight | 18460kg | Drive mode of chassis | 4×2/6x4 | |||||
Max. travel speed | 92km/h | Cab with sleeper | ||||||
Wheelbase | 5600 mm | |||||||
Outline | Overall length | 13740mm | ||||||
Overall width | 2490mm | Tread | front wheel | |||||
Overall height | 4000mm | rear whee | ||||||
Engine | Model of engine | WP10.290 | Tire size | 12.00R20 | ||||
Min. turning radius | ||||||||
Braking distance | ||||||||
Output power | 290PS(213KW) | B oom | Form | three section, folded, full hydraulic | ||||
Max. torque | 1055NM | Max. ground clearance | 23.1m | |||||
Emission standard | EuroIII | Diameter of conveying pipe | DN125 | |||||
Gearbox model | 9JS119 | Length of end hose | 3m | |||||
displacement | 97269726ML | Section 1 boom | Length | 8220 | ||||
Drive mode | Hydraulic type | rotation | 910 | |||||
×Cylinder diameter ×stroke | φ140mm×2000mm | Section 2 boom | Length | 5680mm | ||||
×Delivery cylinder diameter × stroke | φ230mm×2000mm | rotation | 1800 | |||||
Distributing valve type | Svalve | Section3 boom | Length | 5215mm | ||||
Displacement in theory | 160/70m3/h | rotation | 2680 | |||||
Pumping pressure in theory | 8/11.8Mpa | |||||||
Rotating range of placing boom | any | |||||||
Pumping times in theory | 19/19 times/min | Max. placing radius | 19.1 m | |||||
Max. placing height | 23.1 m | |||||||
Hydraulic system pressure | 32MPa | |||||||
Method of lubrication | Automatic grease lubrication | |||||||
Hopper capacity | 0.7M3 | Oil tank capacity | 1000L | |||||
Feeding height | 1.40m | Control | /Manual/ remote control | |||||
System oil pressure | 32Mpa | Max. water pressure of water pump | 6MPa | |||||
Slump constant | 14cm~23cm | Water tank volume | 650L | |||||
Max. aggregate size | 40mm | Cooling method of hydraulic oil | Air cooling | |||||
Outrigger span | 4550×2280×6030 | Cleaning way of concrete pipe | /Washing/ dry-cleaning |
- Q: Why does the concrete pump main cylinder check valve damage cause the cylinder stroke to be short and the pumping is weak?
- The main cylinder discharge, long run will lead to shorter travel, when the main cylinder of the smaller volume, through the pressure (closed off the valve) can also be achieved by the preset pressure, it can not be pressed to determine whether the master cylinder seal damage;
- Q: What is the history of the concrete pump
- In the late 1960s, Putzmeister launched a 16-meter boom pump truck. In 1998, Sany Heavy Industry successfully developed China's first 37-meter boom pump with independent intellectual property rights, breaking the foreign brands to the Chinese market
- Q: What is the working principle and structure of a concrete pump truck?
- Pumping device for the piston concrete pump, the use of hydraulic cylinder to drive the concrete cylinder piston for reciprocating motion, with the hopper, distribution valve with the completion of inhalation and removal of concrete, in order to achieve the purpose of transport.
- Q: How to prevent concrete pump blockage
- -30min, after each operation is completed, the pipeline should be cleaned to prevent the next use caused by blocking the phenomenon.
- Q: Building concrete pump is how to bulk cement (concrete) to the high
- At the same time, another main cylinder under the action of the pressure, to promote the main cylinder of the piston rod out and at the same time to push the concrete piston out of the concrete tank, through the slide valve Y port into the concrete pipe.
- Q: Is it easy for small concrete pumps?
- the actual application or according to your project to select the equipment, the function is not surplus , Can not meet the requirements of the project can be.
- Q: How to wash the concrete pump with a ball
- Combining ready-mix concrete production with pump construction, the use of concrete mixing truck for intermediate operation, can achieve continuous pumping and pouring concrete.
- Q: What is the meaning of cast - in - place concrete secondary grouting?
- Cast concrete is cast at the construction site. Unlike prefabricated concrete, most buildings are constructed using cast-in-place concrete.
- Q: How is the mortar in concrete pumping concrete coexisting and distinguishing in a pump?
- When the pump starts to press the concrete, the speed should be slow, when the concrete is sent to the end of the pipe, the speed can be gradually accelerated, and transferred to the normal degree of pumping.
- Q: How to operate concrete pump
- Should always monitor a variety of instruments and lights, found abnormal, timely adjustment or processing.
Send your message to us
Concrete Pump Truck Best Price of 24-58meters
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords