Concrete Pump Delivery Cylinder DN200*1775(SCHWING)

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
2 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

The Concrete Pump Delivery Cylinder  DN200*1775(SCHWING)  usually  made by steel material No. C45. by Chinese standard according to customer’s requests as well, and it will be packed in bundles or nude packing directly put into container.Most of customers likes to buy it together with delivery pipes and elbows.

Scope of Application of the Cylinders

The Concrete Pump Delivery Cylinder  DN200*1775(SCHWING)   is a concrete pumping parts for combined use with other concrete pumps parts in concrete pumping operations. It can be widely used on Schwing stationary pump, Schwing truck pumps as well.

This Concrete Pump Delivery Cylinder  DN200*1775(SCHWING)  can only be used in Schwing concrete pump construction operations, but not in any other operations, like dragging, moving, or hoisting heavy articles or personnel. The pipe is also not allowed to be used in any location where any combustible or explosive material exists or a cave-in may occur.


Concrete Pump Delivery Cylinder DN200*1775

1. Capacity: 60,000~80,000cbm 
2. Size: DN180, DN200, DN230.. 
4. Brand: SCHWING

5. Material: C45

6. Quenching and tempering to improve the hardness to HB241-280

7. Inner wall chrome thickness is 0.25-0.30mm, hardness HV820-900. 


Product Advantages:

OKorder's Cylinders DN200*1775 Channels are durable, strong, and safety.


Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing (10-20 days)

Reliable performance

Easy to weld

High safety.

·    Professional Service

·    Competitive pricing

   Measuring of wall thickness from the outside

   Low purchase cost




Q1: How long about delivery time about DN200*1775?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our Cylinders DN200*1775?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically10 to 30 workdays.

Q4: If we can produce some Cylinders DN200*1775 according to customers request?

A4: Yes, we can produce Cylinders DN200*1775 according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, If needed,


Concrete Pump Delivery Cylinder  DN200*1775(SCHWING)

Concrete Pump Delivery Cylinder  DN200*1775(SCHWING)

Concrete Pump Delivery Cylinder  DN200*1775(SCHWING)

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the skills of concrete pump?
In the process of pumping concrete, with the increase of pump pressure, pump impact force will force the tube to move back and forth, this is not only the loss of pumping pressure, and connecting parts between the pump in shock and intermittent tension state, can lead to premature damage, and rubber pipe cement slurry overflow, therefore must be fixed the pump
Q:If the concrete pump valve jam how to judge and deal with?
The valve plug is formed gradually, the main reason is that after the completion of concrete pump, no time to use high-pressure water washing, resulting in concrete residue in the tube after a considerable period of time, gradually thickening, accumulation of consolidation, resulting in congestion.
Q:How to diagnose the blockage in the inlet of concrete pump?
If it doesn't work, you'll have to clean it up manually and rule it out.
Q:In general, how much concrete will be transported per hour for the concrete pump and the pump?
Day pump, usually with concrete tank car, a jar of 9 cubic meters, unloading 7-10 minutes to completeDay pump, usually with concrete tank car, a jar of 9 cubic meters, unloading 7-10 minutes to complete
Q:What do these types of concrete pumps mean?
After the 16 is the motor power kW (landlord 16 seems to have a mistake, usually 110) or the manufacturer's serial number.
Q:What is the washing process of the concrete pump pipe?
Open the first section of the reducing pipe and the discharge gate, and thoroughly remove the remaining concrete in the hopper, the distributing valve box and the reducing pipe.
Q:When concrete is poured, how high can the concrete pump be put?
The car pump arm is long, traffic roads, the required pump stop position is bigger, so there are a lot of the site can not be use pump more than 60 meters (60 meters of general automobile pump, stop the pump and the leg position width of about 14 meters)
Q:How can the concrete pump be installed and used?
When cleaning the pipe, the operator shall leave the pipe outlet and the elbow joint. If the pipe is cleaned with compressed air, there shall be no personnel and equipment at the outlet of the pipe at 10m
Q:What is the name of the pump for concrete transportation?
The concrete pump truck is divided into piston type, extruding type and water pressure diaphragm type according to the structure form. The pump body is mounted on the automobile chassis, and then equipped with telescopic or bent cloth rods to form a pump truck
Q:How to judge the concrete pipeline blockage?
When the conveying pressure increases gradually, while the material level of the hopper does not fall, the pipe outlet is not out of stock, the pump vibrates, and the pipe is accompanied by strong vibration and displacement, the pipe blockage can be determined.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range