• Concrete Pump  24m with Boom Truck System 1
  • Concrete Pump  24m with Boom Truck System 2
Concrete Pump  24m with Boom Truck

Concrete Pump 24m with Boom Truck

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete Pump  24m with Boom Truck

Product Details

Basic Info.

Model NO.:24m

 

Type:Concrete Pump

Machining Process:Hydraulic

 

Certification:ISO9001: 2000, CE

Condition:New

 

Boom Reach Height:24m

Chassis:Shannxi Auto or HOWO

 

Emission Standard:Euro III,Euro IV

Export Markets:Global

Additional Info.

Trademark:Hongda Tielishi

 

Packing:Nake

Standard:CE, CCC

 

Origin:China

HS Code:870590909

 

Production Capacity:50

Product Description


24m concrete pump with boom –HD5180THB-24/3UnitParameter
Main Technical Parameters in
Service
Theoretical Pumping Capacitym3/h100
Theoretical Pumping PressureMpa8
Hopper CapacityL700
Feeding Heightmm1400
Distributing Valve Form
S-pipe valve
Max. Distributing Radiusm19.1
Max. Distributing Heightm23.1
Max. Distributing Depthm10
Height of Distributing Boom When Stretchedmm8450
Distance between Front Landing Legsmm4550
Distance between Rear Landing Legsmm2280
Distance between Front and Rear Landing Legsmm6030
Diameter of Conveying Pipemm125
Length of Tail Hosem3
RotaryRangeof Distributing Boom
365°
Number of Boom Sections
3
Rotary Angle of Each Boom Section°90/180/268
Remote-control Distancem200
Main Technical Parameters in
Traveling Condition
Max. Traveling Speedkm/h92
Min. Turning Radiusmm10000
Brake Distancem9.3
Approach Angle°18
Departure Angle°11
Chassis Model
SX1165TN561 ZZ5207M5617D1
Wheel Base between the First and the Second Axlemm5600
Wheel Base between the Second and the Third Axlemm
Front Treadmm
Rear Treadmm1939
Max. Engine Powerkw2132200r/min)
Max Engine Torquen.m1160(1200-1600r/min)
Max. Grade Ability%34.6
Fuel Consumption LimitL/100km34
Overall Dimension (L ×W× H)mm10950×2500×4000
Full-load Total Weightkg18460

Concrete Pump  24m with Boom Truck

Concrete Pump  24m with Boom Truck


Q: What is the difference between a concrete pump and a valve?
the current domestic production is all S valve series. Now there are special high-grade concrete S-valve pump
Q: How to achieve the concrete pump pendulum for the change?
Such as the German Shi Weiyin pump is the case, of course, it is given to the hydraulic pilot oil is not an electrical signal.
Q: How wide concrete pump truck four support steel feet stretch ?
Different types of pump, such as arm length 30 meters, 48 meters, 52 meters of the pump
Q: Is it easy to use fine stone concrete pump?
The fine stone concrete pump is a fine stone concrete transportation equipment specially developed for the warm construction and its construction characteristics
Q: What is the concrete pump pumping technology?
Machine assembly is simple, low production costs, but the electrical control is complex, the failure rate and maintenance costs are extremely high, easy to delay the progress of the project is the biggest drawbacks.
Q: What is the depreciation period for concrete and concrete carriers and how much net residual value is
The net residual value of fixed assets is between 3% and 5% of the original value of fixed assets.
Q: What is the cause of concrete pump blockage?
Take over, should first remove the air inside the delivery pipe, and then tighten the pipe end connector.
Q: What is the calculation of the unit price of concrete pump?
The construction unit price consists of seven items, including depreciation, overhaul, regular repair, arrears and overtime freight, fuel power, labor, and other expenses.
Q: How is the mortar in concrete pumping concrete coexisting and distinguishing in a pump?
The body should maintain a slow rotation, before discharge, the simplified speed should be accelerated to 20 ~ 30s before discharge.
Q: How does the concrete pump operate?
The suction and discharge process of the concrete is: When the main hydraulic pump drives the concrete piston retracts, the concrete poured into the hopper is sucked into the conveying cylinder through the suction port of the hopper, driven by the stirring blade. When the main hydraulic cylinder moves forward,

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords