Concrete Mixing Plant 50M³/h
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technical Parameter:
Serial No. | Item | Parameter or Guide Line | |||||||||
1 | Type | Cement Concrete Mixing Plant | |||||||||
2 | Design Reference | National Standard: Concrete Mixing Plant: GB10171-2005 Concrete Mixer: GB/T9142-2000 | |||||||||
3 | Work Environment | 1) Working temperature 10C~400C; 2)Relative humidity is no more than 90%; 3)The most degree of carrying snow is 800Pa; 4) The most degree of standing wind is 700Pa; 5) Height above sea level on working is no more than 2000m | |||||||||
4 | Applicable Raw Material | Stone,Sand,Water,Additive,Cementing Material(Cement,Flyash,Mineral Powder) | |||||||||
5 | Requirement of Raw Material | I. Cementing Material:a:Portland cement、Blast furnace slag cement、Pozzolanic cement、Flyash Cement b:Mixed Material:Flyash、Ground Slag、Pozzolanic Addition、Inactive Addition II. Aggregate:a:Coarse Aggregate:Stone-Crushed Stone、 Pebble、The Maximum Grain Size of Aggregate (pebble/crushed stone):80/60 mm b:Fine Aggregate:Sand-Natural Sand、Manufactured Sand III. Water:Drinking Water IV. Additive: 1)、Water Reducer2)、Air Entraining Agent3)、Pumping Aid4)、Retarder5)、Accelerating Agent6)、Early Strength Agent7)、Water-proofing Agent8)、Anti-corrosion Admixture9)、Expanding Agent10)、Antifreeze | |||||||||
6 | Theoretical Productivity | 50m3/h | |||||||||
7 | Discharging Height | 3.8m | |||||||||
8 | Installed Capacity | About 74kw(Exclude Screw Conveyer) | |||||||||
9 | Total Weight | About 26.5t(Exclude Powder Silo and Screw Conveyer) | |||||||||
10 | Floor Area | 26m×12m | |||||||||
11 | Mixing System | Matched Mixer | Power | Charging Capacity | Discharging Capacity | ||||||
JS1000A | 37kw | 1600L | 1000L | ||||||||
12 | Aggregate Weighing System | Capacity of Aggregate Bin | Capacity of Weighing Hopper | Power of Electric Drum | Weighing Precision | ||||||
7m3×3 | 3600L | 5.5kw | ±2% | ||||||||
13 | Elevating System | Capacity of Elevating Hopper | Power of Windlass | ||||||||
1600 L | 18.5 kw | ||||||||||
14 | Cement Weighing System | Volume of Weighing Hopper | Weighing Scope | Weighing Precision | |||||||
750L | 0-750 kg | ≤±1% | |||||||||
15 | Water Weighing System | Volume of Water Hopper | Power of Water Pump Motor | Weighing Precision | |||||||
300L | 3 kw | ≤±1% | |||||||||
16 | Liquid Additive Weighing System | Volume of Additive Scale | Volume of Additive Tank | Power of Water Pump Motor | Weighing Precision | ||||||
25L | 2m3 | 0.75kw | ≤±1% | ||||||||
17 | Pneumatic System | Power of Air Compressor: 7.5kw | |||||||||
18 | Screw Conveyer | Specification | Ф273 | Ф219 | Ф168 | ||||||
Conveying Capacity | 65t/h | 45t/h | 25t/h | ||||||||
Power | 15 kw | 11 kw | 7.5 kw | ||||||||
19 | Powder Silo | 50t、100t、150t | |||||||||
20 | Control Room | 6m2 |
More information about out plant,please contact me any time
- Q:What is the special work of the concrete mixing station
- Mixer operator, welder, tester, loader driver's license, assessor
- Q:How much concrete is produced by the js1000 type of the concrete mixing station
- The JS1000 is only the mainframe model and depends on the power of the whole machine and the size of the batching machine. The JS1000 has HZS50, 60, 75, which is in theory, 50, 60 and 75 per hour. The actual operation is certainly less, about 80%
- Q:What constitutes the js750 concrete mixing station
- pecific configuration can be cut can be numerous js750 hosts are commonly used to climb a pipe loading, the concrete quality requirement is not high do not need automatic batching only buy a belt bucket host to climb to go, with a tractor modified small forklift about yao to climb add material in the bucket.
- Q:What raw materials and equipment do you need for your own admixture?
- Admixtures seem simple, but they are actually a practical science. You want to get the ideal admixtures from the books or the web, "that's quite", and you're in the concrete mixing station. The concrete cost control of the mixing station is relatively strict, and the performance of the admixture is different
- Q:Which staff does the concrete mixing station need?
- Mainly depends on how much station, whether can fully staffed, mainly included: general manager, deputy general manager, technology, webmaster, laboratory (deputy) director of the general, the production manager, sales managers, salespeople, scheduling, lab team leader, the operator (inspection), quality inspection, proportioning design, the material inspector technicians, machine operators, resposible, site, monitor of overhaul, maintenance engineer, loadometer, finance, cashier, mixers, pump truck drivers, company drivers, forklift driver, the handyman, chef, etc.
- Q:How long does it take to build a concrete mixer station?
- The main idea is that the goods are completely incomplete, and the crane, the manpower, the mechanical tools. If everything is in place, then the pure installation will be two weeks to a month. Of course, also see you buy what type of product, container type is compared commonly faster, smaller and faster, under 3000 type slightly faster, 4000 and 5000 slowly
- Q:What are the facilities of the concrete mixing station
- It can be divided into five large parts of the mixing host, material weighing system, material conveying system, material storage system and control system
- Q:What does HZS mean in the HZS120 concrete mixing station
- HZS refers to the production capacity per hour. The specifications of the mixing plant size is named according to the theory of production per hour, the specifications of the commonly used at present in our country are: HZS25, HZS35, HZS50, HZS60, HZS75, HZS90, HZS120, HZS150, HZS180, HZS240 etc. Such as: HZS25 refers to the production capacity of 25 cubic meters per hour mixing station, the host for the double shaft mixer. If the host to use single model for HZD25 horizontal spindle
- Q:What are the ingredients for the concrete mixing stations?
- It is the raw materials for the concrete mixers, the sand, stone, cement, fly ash, mineral powder, various admixtures, water, basically these seven raw materials.
- Q:What is the difference between a concrete mixer and a concrete mixer
- The simple point is: the bones of the mixing tower are on top, and the bone is measured directly into the blender. The bone material of the stirring station is below, and the bone material is measured and then transported into the blender after the slanting belt. In a popular way, it is called the building, which is called the second ascent. Higher initial investment mixing floor production line 400000 station, because of mixing building bin above, therefore the steel structure will be bigger, inclined belt will be relatively longer. But in productivity, the churn is about 20 per cent more productive. In the operation, the energy consumption and the failure rate will increase due to the frequent start of the inclined belt of the mixing station, while the mixing building will be relatively low. Of course, in appearance, the mixing building is a bit more imposing than a mixer-stand, which can sometimes have an unexpected effect on the business. In addition, there are some technology mixing buildings that can be used, and the mixing stations can't be used, because the equipment is different. It's worth noting that the difference between the initial and the mixing stations is not absolute.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Mixing Plant 50M³/h
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords