CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid

CNBM Tons of Potassium Sulfate (SOP) Project with Hydrochloric Acid

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

                Tons of Potassium Sulfate Project

General

CNBM is committed to building the best fertilizer factory for customers. With many years of experience in design and construction of potash fertilizer production line, our team continuously improve on technology and equipments of SOP production line, which can make more economic benefits and extend the lifetime of the equipments. CNBM built the SOP plant in many countries, such as Philippines, Indonesia, India, Egypt, etc. The high quality service has won the public praise for CNBM, the Clients are also willing to repurchase to expand the scale of production line. Although potash fertilizer production line is a mature technology, but CNBM has unique technology which is different from others. The proposal is is for potassium sulfate Plant with the capacity of 100,000MTPA in powder.

Reference list

No.CaseDate
1The project of SOP in Iran for 40,000 MTPAIn 2017 Year
2The project of SOP granulation in Philippines for 10,000 MTPAIn 2015 Year
3The project of SOP in Egypt for 100,000 MTPA
4The project of SOP in Egypt for 60,000 MTPA
5The project of SOP granulation in Egypt for 20,000 MTPA
6The project of SOP in Egypt for 20,000 MTPAIn 2013 Year
7Technical consultant of Sop in Saudi for 20,000 MTPA
8Overhaul the furnace in IndonesiaIn 2011 Year
9The project of Calcium Chloride in Egypt for 30,000 MTPA 
10The contractor of SOP in Philippines for 20,000MTPA In 2008 Year
11Overhaul the furnace in IndonesiaIn 2007 Year
12The contractor of SOP in Philippines for 10,000MTPAIn 2006 Year
13The equipment supplier of SOP in Indonesia for 10,000MTPAIn 2004 Year
14The contractor of SOP in Philippines for 10,000MTPA


Scope of Supply

The project basic and detailed engineering design, including the process details, layouts, arrangements, technical specifications, and all other required items technical aspects.

 Detailed engineering which will be required for the operation and maintenance of the plant.

 Specifications and procurement of equipment as required for the use and operation of process.

Complete technical documentation and instructions required for fulfillment of erection, preparation for start-up, performance testing, operation and any other special equipment.

Equipment packing and China inland transportation and transport from China port to Iran port.

Supervision of Installation, commissioning and start-up of the plant.

Supply of erection material as piping, pipe fittings, valves, flanges, gaskets, bolting material, instrumentation, tubing, paints for protection against corrosion and heat insulation material.

Training of personnel at our site during the unit construction and initial operation.


Exclusion Items in Scope of Supply 

Civil and Architecture detail design.

Civil construction, include plant and general buildings; lighting; lightening protection; communication system; road; pavement; etc.

Power substation; transformer system (becoming 380 V; 3 phase; 50 Hz), main-power cable and related system which out of the battery limit.

Emergency power supply system

Laboratory apparatus

Fire-fighting system.

Raw materials and part of utilities for this plant.

Any government permit related to the equipment; system; building  utilization.

Local customs clearance and inland transportation to project site for import portion.

Any tax and duty in country where plant located.

Bank charges incurred outside of China

Round ticket of engineer,accommodation,meals, communication for engineer and workers

Working permit and such related expenses for overseas technicians/engineers and project management staffs.

Utilities consumption which used for the installation work including water, electric .etc.

The large equipments and tools for installation, which include crane, welder, cutting machine , forklift hoist ,other tools and assistant workers for installation.

Note: the sand, red brick and wooden for building furnace is not included in supply scope. 

 Battery Limits

ItemBattery Limit
Raw Material 
 MOP At inlet of feed hopper
 Sulphuric acid Will be provided at the inlet of day tank in battery limits with isolation valve
Product
 Potassium Sulphate Inlet of SOP Product Silo 
 HCL To HCL Pipeline of HCL Tank Farm
Utilities
 Compressed air Will be provided at one point within battery limits with isolation valve
 Process water Will be provided at one point within battery limits with isolation valve
 Cooling Water Will be provided at one point within battery limits with isolation valve
 Natural gas Will be provided at one point within battery limits with isolation valve


Others

1.1 Chinese codes and standards shall be adopted during Engineering design. All equipment and material shall be made by the manufacturer with in China, including some manufacturer of Sino-foreign joint venture or some manufacturer adopted foreign technology.   

1.2 CNBM has capability to make the supervision of installation for the Plant; precondition as below:

 All the equipment should be on site;

The civil job should be finished, cleaning the site

The client should give good cooperation on labor and installation tools. 

1.3 This proposal is made based on the normal condition of security, exclude Force Majeure. Once we receive Safety Precaution from Ministry of Foreign Affairs and Chinese Embassy, we will not dispatch workers to site and also can not guarantee the schedule. 


Pictures

.jpg

CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid

CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid

CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid


3D drawings :

CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid


CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid

CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid

CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid



Q:Is the construction machinery good? How about employment?
Engineering machinery application technology is divided into eleven chapters, the domestic and foreign engineering machinery and the use of mechanical engineering technology is summarized, introduces the construction machinery used in the process of technical condition change, engineering machinery technology status detection and diagnosis, engineering machinery maintenance techniques, the use of diesel technology, engineering machinery, engineering machinery, rational use oil application technology, engineering mechanical transmission and hydraulic system using the technology, the use of technology, earthmoving machinery and compaction of asphalt pavement construction machinery by leading technology.
Q:thanks
Possible a CT of the head? or a MRI. X-Rays are not going to show anything up they are for bones. Scans show tissue, muscle etc.
Q:What are the large machinery in the construction project?
Hoisting machinery, such as tower cranes, self-propelled cranes, mast cranes, clamshell cranes, etc.. Compaction machinery such as tire roller, smooth wheel roller, single foot roller, vibratory roller, tamping machine, tamping machine, etc..
Q:...a computer or machinery?
Interesting. I would call it computer since it is all solid state devices on a circuit board with no moving parts. It is digital right? As a pc engineer digital implies that it uses 1 and 0 to make its decisions, true or false, on or off... Which is the heart of the true language of a computer. Just my humble opinion.
Q:Are there any specific machinery that anthropologist have to work with?
Anthropology covers such a wide spectrum of disciplines that it is impossible to list all the equipment all of them use. From forensic tools of criminologist to digital cameras of ethnologists, you have to be more specific.
Q:In Australia, the original fauna never evolved to a bright height, the marsupials occupying the peak.Is it due to the harsh arid Australian environment?
Marsupials actually originated in North America 193 to 186 million years ago.
Q:I am looking for the Leather Picker , Leather Buffer and Picking Stick use in Power Looms, Kindly make contact with me from Pakistan Only with cheap best quality . Any person who can help out me please make contact with me on this email address .
Contact okorder /. LEATHER PICKERS NO. S-6 FOR SAKAMOTO LOOMS. LEATHER PICKERS NO. S-5 FOR SAKAMOTO LOOMS LEATHER PICKERS NO. S-7 FOR SAKAMOTO AUTO LOOMS. LEATHER PICKERS NO. 22 FOR PLAIN LOOMS. LEATHER PICKERS NO. 22 (L) FOR TURKISH MARKET. LEATHER PICKERS FOR CARPET LOOMS. LEATHER BUFFERS FOR SAKAMOTO LOOMS. HIGH COMPRESSED WOOD SHUTTLES FOR COTTON IN DIFIRENT SIZES. HIGH COMPRESSED WOOD SHUTTLES FOR AUTO LOOMS IN DIFIRENT SIZE. HIGH COMPRESSED WOOD PICKING STICK OF ALL TYPS. HIGH COMPRESSED WOOD SIDE LIVER.
Q:I'm planning on getting a machine for $65000, I've never had any loans or buy a new car. My credit scores are not good in 2 bureus are 670 and Expirian is 570. I'm trying right now to improve my credit scores but it's not easy, takes time. I applyed in City Financial for a personal lon (not that I need one) but just to try to get the loan and pay it off. But I was denied. So I decided to use more of my credit card so it will show in my cradit report that I had a bigger loan ($7000). And then pay off the credit cards. If you have any ideas what shoul I do I'll appreciate you answer. Thank you in advance.
It will be very hard to get a loan for 65,000 with little credit history. What will make it even harder is if you can't show income. The manufacturer of the equipment may have finance available through them, since if you default, they can take back possession. Most banks will consider a piece of machinery a poor securitization option because there is such a limited market.
Q:Is factory machinery repairs and maintenance a period or product cost?
Repairs are when something breaks and are never period. Period maintenance is to keep repairs from happening.
Q:Is the use of exercise machinery the best way to get fit?
The use of fitness equipment such as elliptical, treadmills, weight training stations at the local gym are the best ways to improve your overall physical fitness. You can receive instructions on how to use the equipment by the Fitness Center monitors at your local gym. If you join a gym you will be amongst like-minded people. You may meet someone there who can become your gym partner and you both can give each other incentive to obtain physical fitness. You can also gain fitness with yoga and pilates to help with your flexibility. Zumba, Core and dancing classes can help with your cardio. These are suggestions but you must make the commitment to stay with your excercise program. Healthy eating habits, limiting alcoholic beverage consumption and not smoking tobacco products will help in your quest for physical fitness. It will not do you any good if you work out for three weeks and give up your fitness program. Oh, by the way, it will be beneficial to you if you have a complete check-up with your doctor before you start your lifetime practice of physical fitness. When you go to the gym you want to walk into the building under your own power. You do not want to be taken out of the building on a gurnee. It is very embarrasing and humiliating with people looking at you as you are wheeled out by paramedics, place in an ambulance and driven to a hospital. Good luck.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords