Cheap Hydraulic Concrete Placing Boom for sale
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 15 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.
2.Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors, assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.
3.Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.Description:
1.Includes 4 arms, hydraulic cylinder and four-bar linkage. The 1st arm is divided into two segments.
The root of the 1st arm is connected with the swivel table.
2.Specially designed working platform where hydraulic pump and electrical control cabinet are set on.
3.Including slewing ring support
3.
Delivery pipe dimension (outside diameter×thickness) (mm×mm) | φ133×4 | ||
Delivery hose dimension (inside diameter×length) (″×mm) | 5″×3000 | ||
Radius of placing boom(m) | 38 | ||
Stationary height(to the join between the end of the boom and swivel table) (m) | 22.6 | ||
1st section (m) | 2.6+5.65+6.66=14.91 | ||
2nd section (m) | 7.56 | ||
Four hydraulic foldable arms | 3rd section (m) | 7.65 | |
4th section (m) | 7.72 | ||
1st section | -4.2°~82.5° | ||
Boom articulation | 2nd section | 0°~180° | |
3rd section | 0°~180° | ||
4th section | 0°~180° | ||
(°) Slewing range | 0°~360° | ||
Power of motor(kW) | 22 | ||
(MPa) | 30 | ||
Pressure of hydraulic system |
- Q: What are the specifications of concrete spreader?
- According to radius said: there are 6 meters, 8 meters, 10 meters, 12 meters, 15 meters, 18 meters, 20 meters, etc., cloth height: 1-7 meters
- Q: How to install and use the distributor?
- In order to prevent the cable leakage wounding, should be used in three-phase five wire system, the "three distribution", "two levels of protection", to implement a machine a gate of an insurance, lighting line equipment switch installation, the nearest place, in case of emergency hand brake pull
- Q: What are the acceptance items of concrete spreader?
- Have product quality certificate, construction site cloth machine is reinforced
- Q: What is a fixed concrete distributor?
- Concrete distributing machine: special concrete pouring equipment for construction, design and production of railway beam yard and nuclear power plant
- Q: what's the difference between the fabric pump and boom pump?
- The pump is provided with an automobile chassis, and the distributor is not provided. The distributor is usually installed in a floor or an elevator shaft
- Q: What are the weekly inspection items for concrete spreader?
- Check connection bolts, shaft end plate, pin shaft, lock nut is loose
- Q: How to maintain the concrete spreader?
- The attached vibration motor adopts a special installation structure, which can make the whole surface of the hopper vibrate evenly, break the arch and cut off the material better
- Q: What are the monthly inspection items of the movable concrete spreader?
- Check the rotating reducer for abnormal heating and noise
- Q: What is the structure of a concrete distributor?
- Structure: bolt, and the vertical frame, which is fixed on the base part, through the slewing bearing and the top rotating part is connected on the main beam, and the balance arm, the balance arm rod, such that after the formation of the upper transverse rotating part
- Q: What's the design plan of the concrete spreader?
- Imported cloth machine (tire belt machine) is based on heavy duty truck chassis, or cross-country tire crane as chassis. The distribution machine patent uses the self-propelled crawler crane as the chassis, forming the structure of articulated upper material belt conveyor + crawler chassis + telescopic cloth belt conveyor, which is the first in China
Send your message to us
Cheap Hydraulic Concrete Placing Boom for sale
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 15 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords