Car Lift QJ-Y-2-35B
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Model: QJ-Y-2-35B Floorplate 2 post lift
With Electric release, symmetrical arms, 3.5 tons
Specifications:
Lifting capacity: 3500Kg (8000lbs)
Post Height: 2812mm
Car max lifting height: 1900mm
Minimum height: 115mm
Clearance between posts: 2800mm
Total width: 3419.6mm
Width of post material: 4.5mm
arm maximum length: 1100mm
arm minimum length: 750mm
Lifting Time: 50s
Lowering Time: 30s
Power Supply Voltage: 220V/380V ,1ph/3ph
Net Weight: 560Kg Gross Weight :580Kg
Packing Dimension:
840*290*340MM and 2820*520*820MM
Cubic Meter: 1.5cbm
Shipping: 22 pieces / 20’ container 46 pieces / 40’ container
- Q:Construction basket required data
- The manufacturer qualification certificate, production license, factory number (based on the number, when handling the registration, Supervision Bureau for inspection and Geology) installation, must have the most basic installation scheme, special high-altitude operation certificate. The management of each place is much the same. It's all empty. Some places are just for money
- Q:Kind of basket to pay attention to what, how to grow fast?
- Good Chlorophytum, the main problems are: first, light: Chlorophytum was sensitive to light, if direct sunlight in summer and autumn when the leaves will turn yellow, even the dead plant. In winter, the sun is not strong, can make appropriate to accept some sunlight chlorophytum.
- Q:Is it true that free baskets are offered to friends?
- The popular scam mode is as follows: first, telephone, Internet, WeChat said to send you something free, let you out of a freight (or certification fee, fee and so on), express the collection, and then send a general freight prepaid recharge cards, than large denomination.
- Q:How to use an electric basket properly?
- 2, more than the safety lock calibration period should be promptly sent back to manufacturers and re calibration overhaul, the calibration for a period of 1 years.
- Q:What should I do when the hanging frame of the basket is stopped?
- When the wind is strong, the basket is rocking and colliding with the wall or glass. If there is a condition, the hanging basket can be fixed on the main body by means of ropes
- Q:Counterweight requirement of basket
- Before the use of the basket, it must be checked by the safety inspector to make use of; (3) the overturning coefficient is equal to the weight moment ratio and the forward bending moment, and the ratio should be no less than 2.
- Q:Construction basket often said that the need for two people to operate, then, coupled with my general type of work, that basket will be able to four people?
- The answer is negative if it is to be determined according to the available text. According to 5.5.8 the JGJ202-2010 construction scaffolding safety technical tools in the basket of workers should not exceed 2; this is a certain reason, my personal judgment is mainly because the determination of major accident liability standards for more than 3 people; occurred in the basket no workers more than 2 people are not the cause of major accidents.
- Q:What are the basic components of the overhead hanging basket?
- Gondola structure: the structure is divided into three parts: suspension platform, wire rope, sling suspension platform containing platform, elevator, safety lock and limit switch, the control box containing suspension frame, weight lifter
- Q:Who has a good way to clean the basket and the basket?
- 2, the timely removal of electric basket safety lock surface and the safety rope on the debris, pay attention to safety protective measures to avoid debris into the lock, causing safety lock failure and failure. Avoid collision safety lock operation, operation good protection, prevent rain, snow and other debris into the safety lock in
- Q:Construction basket use, need to the quality supervision department for the record?
- Construction units strictly abide by the state's basic procedures for construction projects and the quality and safety of laws and regulations and mandatory standards. The construction unit shall carry out project contracting, prohibit subcontracting or dismemberment while specified, the construction unit shall direct the professional engineering, construction units, professional contractors to sign the agreement the unified management of the construction site and construction contractor, clearly the responsibility of the parties, rights and obligations, the construction units shall not be used to buy units, express or implied the use of leasing, does not meet the safety requirements of the basket and fittings, or shall bear the responsibility for security.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Car Lift QJ-Y-2-35B
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords