• Building Hoist SC120/120 European Standard Electric Parts with 2.4ton Capacity System 1
  • Building Hoist SC120/120 European Standard Electric Parts with 2.4ton Capacity System 2
  • Building Hoist SC120/120 European Standard Electric Parts with 2.4ton Capacity System 3
  • Building Hoist SC120/120 European Standard Electric Parts with 2.4ton Capacity System 4
Building Hoist SC120/120 European Standard Electric Parts with 2.4ton Capacity

Building Hoist SC120/120 European Standard Electric Parts with 2.4ton Capacity

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Building Hoist Description

1.The gearing adopts imported bearing,enameled cable and oil seal.

2.The electric parts adopt products from world renowned manufacturers such as Schneider,Siemens and LG.

3.The racks and pinion adopts special material and heat-treatment technique,which prolong the life of these parts.

4.The steel structure uses quality steel from famous domestic manufacturers.

5.The surface of the structure can apply paint-spray,parkerizing baking finish or hot galvanizing processing according to users requirement.

6.The cage can be produced and decorated by aluminum molded board,punched-plate or figured aluminum board.


Packaging & Delivery of Building Hoist

Packaging: nude and wooded box           Delivery: 25-30days


Mains Parts of Building Hoist

1.Metal structure including the mast, tie in and cabin ,could be spay-painted and hot galvanized. Mast section is produced with high quality Q345B seamless steel pipe.

2.Electric parts are all equipped with Schneider , Siemens and other top brands.

3.The electrical system can be adopted with the normal control method and VVVF+PLC control method. Inverter we adopted is from Schneider. Yaskawa and other world famous brand.

4.Cabin exit door adopts ramping type. The ramping door likes a bridge between the building hoist and construction building.

5.The cabin floor is produced from 3MM thickness steel riffled boardHot dip galvanized, and 15MM thickness wooden board which can reduce the vibration and deformation a lot.

6.Driving unit is adopted the products from ZHANGJIANG and other reputed maker, or from SEW, NORD.

7.Safety system is mainly composed of electrical motor braking, anti-drop safety device, top & bottom limit switches, top & bottom 3-phase switches, door limit switches, buffer device and over-load protection. The system aims to ensure the hoist are running safely.

8.Qualification: CE, ISO9001:2008 and etc.

9.The long-term operation of CMAX building hoists testifies CMAX hoist is working performance is stable.


Building Hoist Images

Building Hoist SC120/120 European Standard Electric Parts with 2.4ton Capacity

Building Hoist SC120/120 European Standard Electric Parts with 2.4ton Capacity

Building Hoist SC120/120 European Standard Electric Parts with 2.4ton Capacity



Building Hoist Specification

Building Hoist SC120/120 European Standard Electric Parts with 2.4ton Capacity




FAQ of Building Hosit

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.  


Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance& exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.  

Q:6 layer of brick and concrete construction project, have tower crane still need construction elevator?
6 floors of brick and concrete construction projects, tower cranes do not need construction elevator. Brick structure refers to the building of the wall of vertical bearing structure, column, etc. By using brick or block masonry, lateral load-bearing beam, reinforced concrete structure is adopted for floor, roof boarding, etc. In other words, the masonry structure is a small amount of reinforced concrete and most brick wall bearing structures. The masonry structure is a kind of hybrid structure, which is composed of brick wall and reinforced concrete beams. Suitable for small width and depth, room area is small, multilayer or low-rise buildings, for load bearing walls can't change, while the frame structure of wall body can be altered.
Q:Can a construction elevator use a single cage
Seriously, a construction elevator in wuhan just happened, and 19 people died. Go and see!
Q:The safety officer shall be responsible for the work of the construction elevator
In a nutshell, the security officer is responsible for overseeing, checking, training, maintaining, and dismantling
Q:For example, what records do you want to have a third party monitoring?
After the construction elevator overhaul, the contents of the inspection and acceptance inspection shall be inspected; In the use of elevators, the contents of the regular inspection shall be conducted once a year in accordance with the provisions of the regulations.
Q:How is the construction elevator installed
Construction elevator installation 1) the location of the elevator depends on the condition of the site and the equipment, so as far as possible, stay away from the overhead line and keep the safe distance specified. When the elevator is running, there is a lot of danger and should be avoided. 2) the order of installation is: 3) place the chassis on the base and the base pre-buried bolt, and the platform is placed on the chassis, and the basket is placed in the middle of the chassis. 4) to install the standard section, each installation of two standard sections (usually less than 8m) to be temporarily fixed. The wire rope shall be used for the use of the temporary cable, and the joints and supporting points shall be bolted and not tied with the lead wire. 5) the installation should alternate between the two columns. Node bolt specification must according to the aperture matching, not packing, found that the aperture position at the time, can not arbitrarily expanding, more can't to lead wire bundle, instead to avoid loose node deformation. 6) when installing the standard section, pay attention to the vertical degree of the guide, and the line of the guide line should not appear in the line of folding and too big clearance to prevent the collision from running. 7) when construction site conditions permit, it can be assembled on the ground and then hoisted on the whole to reduce the height of the work. Due to the design of the frame, the stress condition of the construction is only considered, so before the whole moving up, the counter can be temporarily strengthened to enhance the bending capacity of the nodes.
Q:The tower crane is on a surface with the construction elevator, and only 2 or 3 meters away. Is that allowed
Cranes and elevators from very close, may be the reason for the sites or the position is not reasonable, so close to the distance as long as you ensure the tower crane and tower crane arm when rotating to the above the elevator after satisfying the end, must keep more than 2 meters with elevator recent distance. Or you can refer directly to the tower crane safety code, GB5144-2006.
Q:The construction elevator is commonly used in the process of the project
The construction elevator is commonly used in the process of the project. It is best to give a time period You're just saying one of its USES, I want to know what is the stage of what is going on in the project
Q:When building tall buildings, the machine that USES to lift concrete to wait for tall building
It should be the construction elevator. Construction elevators are often called construction elevators, but construction lifts include a broader definition, and construction platforms are part of the construction elevator series. Simple construction elevator is by car, driving mechanism, standard section, attached to the wall, chassis, fence, electrical system and so on several parts, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction elevator is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. The construction elevator of our country is more and more mature, and gradually goes to the international.
Q:How to save the elevator accident
Expert clew Do not take an elevator with no safety check mark. The elevator person is safe to protect the condition, the passenger has no life danger, after the alarm, the patient wait for the person to help. When emergency situations such as earthquake, fire and elevator water are taken, the use of an elevator should not be used and the emergency passage or staircase should be used instead.
Q:Is the construction elevator the same as the construction elevator
Construction elevators are often called construction elevators, but construction lifts include a broader definition, and construction platforms are part of the construction elevator series. Simple construction elevator is by car, driving mechanism, standard section, attached to the wall, chassis, fence, electrical system and so on several parts, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction elevator is usually used with tower crane on the construction site, the average load in 1-5 tons, running speed is 1 to 60 m/min.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords