Building Hoist Deal Branded Construction Machinery

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


Structure of Building Hoist Description


1.Feature: Building Hoist                   

2.Payload(kg):2*2700                                      

3.Lifting Speed(m/min):0~60                      

4.Motor Power(kw): 2*2*18.5

5.Safety Device: 2*SAJ50-1.4                        

6.Cage: Twin                                                  

7.Counterweight: Yes

8.Certification: CE,ISO                                      

9.Place of Origin: China(Mainland)            

10.Model Number: Type:SCD270/270

 


Packaging & Delivery of Building Hoist 


Packaging Detail: Nude package          Delivery Detail: 25-30days

 


Main Parts of Building Hoist 


● Adopts the most advanced VF speed control device and microcomputer programmable logic controller.


● Stepless speed control helps eliminate the concussion during start up and braking, steady the operation process and ensures automated leveling.


● Adopts open loop V/Fcontrol; the speed control precision can reach ±2~3%. Realizes accurate low speed positioning of the hoist and avoid slipping during downward stopping of hoist.


● The VF system has current-restriction function, ensuring a small current when motor start up and reducing the concussion to power supply. It reduces the engery consumption and mitigates effects to on site electric equipments.


● The steadiness during running mitigates concussion to mechanical parts, reduces wears of rack, pinion and the brake and prolongs the spare parts'life.   


● The VF system also has the over voltage protection,low voltage protection, overcurrent, overload and anti-stalling protection functions,


● The system applies the special software for hoists developed by our company, making the operation more safe and reliable.


Building Hoist Images


CMAX Building Hoist

Building Hoist Deal Branded Construction Machinery

Anchorage System

Building Hoist Deal Branded Construction Machinery

Mast Section

Building Hoist Deal Branded Construction Machinery

Driving Unit

Building Hoist Deal Branded Construction Machinery


Building Hoist Specifiction


Building Hoist Deal Branded Construction Machinery


FAQ of Building Hoist


Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.  


Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance& exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can construction elevators be taken by people or by goods
According to GB 26557-2011, "a vertical guide for people with vertical navigation". 5.6 lift cage 5.6.1 general When the maximum number of passengers can be carried, the maximum amount of the ceiling shall be calculated according to the area of 0.2 square meters per person, and the weight should be calculated at 75 kg per person.
Q:How many floors do you need to install a construction elevator?
In this case, you do not need to install the construction elevator at the main stage. After the main body is finished, install the tower crane, reinstall, mainly for decorate the vertical transport of the stage.
Q:What is the need for the sc200/200 construction elevator cable?
General is 3 times 16 + 2 * 6, want to know can seek professional construction lift machine cable market manufacturer ask
Q:What is the main function of elevator motherboard?
The elevator motherboard is different from each brand, and it functions like a computer motherboard
Q:Why is the construction elevator not so close to the structure?
The distance between the moving parts and the building and the fixed construction equipment shall not be less than 0.25 m. The main thing is to prevent the person from the point of view. For example, workers are on the third floor to look down, hanging cage, where is the result now hanging basket is go down from the fourth floor, if not the 25 cm, likely to brush "cut".
Q:Why is the construction elevator not up to the roof
Construction elevators are often called construction elevators, but construction lifts include a broader definition, and construction platforms are part of the construction elevator series. Simple construction elevator is by car, driving mechanism, standard section, attached to the wall, chassis, fence, electrical system and so on several parts, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction elevator is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. The construction elevator of our country is more and more mature, and gradually goes to the international.
Q:6 layer of brick and concrete construction project, have tower crane still need construction elevator?
Tower crane is used for heavy lifting, long pieces, small machinery and materials must be used in the construction elevator.
Q:Construction site construction elevator and tower crane, which unit security check and acceptance?
The inspection, inspection, inspection and acceptance of the inspection station shall not be put into operation
Q:Elevator installation approach, need to give the total package (inspect) what data, come a master to answer the detail point
In ten days: installation company qualification (including business license, qualification certificate, safety production license, organization code certificate and company performance, etc.), installation personnel qualifications (including the principal, special operations personnel, etc.), installation construction scheme (including the construction organization design, safety and civilized construction scheme, construction progress) The installation process: in materials to submit for approval (material inspection report, certificate, etc.), play equipment to submit for approval (mechanical factory qualified certificate, safe use license, etc.) After the construction is completed, the certificate of safety inspection (which needs to be provided by the special security agency)
Q:The staff on the construction platform shall not exceed the number of people
Depending on the actual situation, different quality of platform specifications will affect the number of people manned. Hope can help you.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range