• AC Flexible Duct - Aluminium Duct & Flexible Ductings System 1
  • AC Flexible Duct - Aluminium Duct & Flexible Ductings System 2
  • AC Flexible Duct - Aluminium Duct & Flexible Ductings System 3
AC Flexible Duct - Aluminium Duct & Flexible Ductings

AC Flexible Duct - Aluminium Duct & Flexible Ductings

Ref Price:
$1.50 / pc get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
50 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Application and benefits of Flexible Duct

-Applied in air conditioning/ventilation systems

-Tear and puncture resistant

-Corrosion resistant

-High flexibility

-Convenient installation

-No toxic gas emission

 

Non-insulated Flexible Duct

Structure: double-layer aluminum foils +1 layer of PET film.

Structure: 1 layer aluminium foil+ 1 layer of PET film

 

Insulated Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu.foil

Glass Wool Density: 16kg/m3; Thickness: 25mm
 

Insulated Acoustic Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu. Foil + 1 layer of PET film

Glass Wool Density: 32kg/m3; Thickness: 25mm
 

Combined Flexible Duct

Structure: flexible duct PVC jacket. 

REMARK: Special structure is available according to customer's requirements

 

Pictures of Flexible Duct  

 

FAQ of Aluminium Flexible Duct:

1.             What temperature maximum? Our products: 150 and 250

2.             What MOQ? Our MOQ: 500 pcs

3.             What payment terms? We accept T/T and L/C

4.             Lead time: 10 days

5.             Packing: Nest packing for non-insulated flexible duct, then into plastic bag for   non-insulated flexible duct or packed in individual carton box. 

 

 

Q: Will metal hose be used on the wastewater treatment equipment?
Code Subhead Name Engineering Value Value (RMB) Where (unit) Unit Quantity Unit Price Proportion Labor Cost Material Cost 11-26 Earthwork Artificial Trenching Pit excavation pit three types of soil depth within 2m 100m31
Q: Cast iron flexible tube A type B What is the difference
See JGJ130-2011 "construction of fasteners steel scaffolding safety technical specifications" 'structure of the valve enamel crisp raccoon Yi Yi paralysis nitrogen Kai made requirements'. ... set the steel pipe as a foot, the first step from the first 1.95m, steel pipe spacing of 2m, two steel pipe between the small
Q: I am sorry to see your answer on Google, can I also pass a copy of my construction and decoration project?
The difference between a flexible pipe and a rigid pipe is that the flexible pipe causes a change in the temperature of the working fluid due to the fluid or medium in the pipe or the temperature of the working environment, resulting in expansion and expansion of the pipe, causing some changes in the pipe itself, Within the scope of the pipeline itself will not cause damage. Such as plastic pipes, metal pipes. Rigid, such as concrete pipes, such as flues, exhaust shafts. Gas and heat is definitely a metal tube.
Q: Can the kitchen sewage pipe pass through the walls of the stove wall?
scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m
Q: How to strengthen the construction management and construction quality control
You can Google Oriental Rainbow's official website, there are rainbow days cat flagship store and other links will have the price and product display, you can also contact Rainbow customer service, it is recommended that you choose the East Rainbow waterproof products and standardized construction team, the East Rain rainbow is the best quality waterproof listed companies RPUF-371 sprayed rigid polyurethane waterproof insulation integrated system "rain rainbow" spray foam polyurethane waterproof insulation integrated system is made of foam polyurethane foam waterproof insulation integrated material and protective surface layer constitute
Q: Safety evaluation: gas pipeline and discharge pipe should not be set between the valve, what is the specification of which provisions?
Usually in accordance with cubic meters or kilograms to calculate the price
Q: How to effectively deepen the construction process management to improve the quality of construction projects
Abstract: The thermal degradation and catalytic degradation of waste polystyrene plastic were carried out
Q: What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
national, provincial and municipal projects related to the construction of policies, laws, regulations and the relevant industry regulations
Q: Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
First, according to its structure can be divided into: scaffolding according to its structure can be divided into: multi-pole, bowl button, door type, square tower, attached lift frame and hanging scaffolding. Second, the knowledge expansion: scaffolding by setting the form can be divided into: single row scaffolding only a row of pole scaffolding, the other side of the horizontal bar on the wall structure. double scaffold scaffolding with two rows of poles. multi-row scaffolding with more than 3 rows of pole scaffolding. full of scaffolding according to the scope of construction work full, both directions have more than 3 rows of pole scaffolding. Full scaffolding The maximum height of the wall or construction work, the scaffolding set by the height of the ground. Scroll (Peripheral) Scaffolding Scaffolding that is set up and intertwined along a building or range of work. Scaffolding Scaffolding with special flat and space shapes, such as for chimneys, water towers, cooling towers and other flat, circular, "outer", polygonal and upper, Form of construction scaffolding.
Q: How is the flexible tube of FRP composite pipe defined
I am not an expert and have occasionally slept on the foam board. Personal feeling sleep in the above airtight, but also hot, easy to get angry.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords