• Allround Scaffolding, Galvanized φ48 (Tian Yuan Wei Yi) System 1
  • Allround Scaffolding, Galvanized φ48 (Tian Yuan Wei Yi) System 2
  • Allround Scaffolding, Galvanized φ48 (Tian Yuan Wei Yi) System 3
  • Allround Scaffolding, Galvanized φ48 (Tian Yuan Wei Yi) System 4
  • Allround Scaffolding, Galvanized φ48 (Tian Yuan Wei Yi) System 5
  • Allround Scaffolding, Galvanized φ48 (Tian Yuan Wei Yi) System 6
Allround Scaffolding, Galvanized φ48 (Tian Yuan Wei Yi)

Allround Scaffolding, Galvanized φ48 (Tian Yuan Wei Yi)

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50000 kg
Supply Capability:
800000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


Tianyuan Allround Scaffolding system


The main use of the Tianyuan Allround Scaffolding system is for demanding scaffolding applications – where conventional scaffolding technology cannot be used optimally and economically. With Tianyuan Allround Scaffolding, you are making an investment in a perfected and complete system with all the necessary approvals, and hence in rapid, safe, profitable and highly versatile scaffolding construction.

The unique combination of positive and rigid connection in a fast and non-bolted system permits a choice of automatically right-angled, linear or angled connections with built-in safety. The original Tianyuan Allround scaffolding offers – particularly in complex scaffolding construction – an unmatched range of uses, unbeatably fast assembly, and persuasive economic arguments, not least thanks to acomprehensive range of accesories – this means unrestricted all-round versatility from one set of parts.

POSITIVE CONNECTION
From the word go - thanks to the ideal-for-site wedge locking principle. This means safe one-man assembly to whatever height is required. A blow with a hammer transforms the positive connection into an unbeatably firm and secure force-transmitting joint.

FORCE-TRANSMITTING JOINT
Is the result of superior design: the end of the wedge head precisely matches the radius of the standard - so forces are introduced centrally into the standard over a wide area.

RAPID ASSEMBLY
Up to 8 connections at various angles can be made in one plane with the statically ideal Allround connector. The assembly of the system is self-explanatory. if required, you can insert tubular or U-ledgers to accommodate the system scaffolding decks: the stiffening effect of the latter means that longitudinal ledgers parallel to the deck (locked against lift-off) are superfluous - a material and weight saving that brings additional assembly and transportation benefits.


The wedge head is simply slid over the rosette.

The wedge is inserted into one of the holes.

A hammer blow on the wedge transforms the positive connection into a non-positive one.


Allround scaffolding system 



Length(mm)Diameter(48)Thickness(mm)Weight(kg)
Standard
2000483.29.5
Ledger1770483.27.47
Ledger1000483.24.64

Diagonal

Brace

3000483.210.1



Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-9, 5, GB/T3091-200
Q: The role of the external scaffolding and the relevant provisions?
Scaffolding outside the building in the construction of the building is an indispensable important tool for erection. Its role: first, can make the construction personnel in different parts of the operation of the high; two is to ensure the safety of construction personnel in the high altitude operation
Q: What are the requirements for the sampling inspection of scaffolding?
1 the sampling proportion of various structural parts shall not be less than 5% and not less than 20 pieces, and the quality shall comply with the relevant standards and regulations. Not meet the quality requirements of the structural parts shall not be used.2 wall thickness of steel pipe should be in line with the provisions of the special construction program, and shall not be less than 2.8mm, the wall thickness of less than 2.8mm of the steel pipe shall not be used;3 is strictly prohibited the use of cracks, deformation of the fastener, the bolt appears to be replaced silk;4 foot hand frame accessories must be used before the anti-corrosion treatment.
Q: Im in college football, I would be puting on and taking off my helmet, I usually keep it on though during practice...but would it be wise for me to get an industrial piercing a couple months before 2 a days and the football season...would the sweat maybe infect my ear, but I am a very clean guy? thanks, if you have an answer it will help my decision.....
dont do it or wait until ur done playing football if u hit it a little bit its going to hurt an the helmet is only going to make it worse so save ur money babe
Q: Find the demolishing scheme of scaffold
Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
Q: I'm a civil engineering student and we were asked to submit a paper about designing a simple scaffolding. I just want to see a sample paper so that I would know what details should I include.
can't draw here, but it's just an x with a flat board on top in 3 dimensions.
Q: I sincerely ask you to help me, door scaffolding, build 30 meters high, without any reinforcement points of the construction program. Thanks, high marks!
1 in order to design and construct the steel pipe scaffold in the door, to carry out the relevant regulations of the state on safe production, and to realize the advanced technology, reasonable economy and safe application.
Q: ..or anytime around whenThe Scarlet Letter was written.I am doing a paper on why the three scenes at the scaffold were so significant.So I decided to include the history of scaffolds, but I can't seem to find any information on them.help please? :]SOURCES..if possible! :]
Mostly the person would be taken onto the scaffold , a rope fixed around their neck, and then the trap door would open and they would drop through and choke to death , very rarely did the neck break in those days , so relatives and friends would pull on the legs , thus to speed up death. Earlier in history people were strung up from trees , and sometimes stood in the back of a cart which was driven away leaving them dangling. The platform on which the guillotine was stood was also called a scaffold at times. These executions were turned into social events and hundreds of people used to go to look.
Q: What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
Mobile scaffolding in general are on the basis of rent by the day
Q: improper design of formwork and scaffolding, not adequate braces and supports, improper handling, corrosion of material is several factor of formwork and scaffolding failure. it is estimated that more than 3000 accidents involving falls from scaffolds and 30 fatalities
Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords