Tower Crane of TC7527 with 18 Ton Max Load and Span 75M
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TC7527 Description
Feature: Tower Crane Condition: New
Application: urban construction Rated Loading Capacity: 18T
Rated Lifting Moment: 315MT Max. Lifting Load: 18T
Max. Lifting Height: 206M Span: 75M
Model Number: TC7527
Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate
Colour: Orange/ Yellow
After-sales Service Provided: Overseas third-party support available
TC7527 Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
TC7527 Specification
TC7527Pictures
TC7527 FAQ.
Q: Does tower crane is similar to Potain or Liebherr type?
A: It could develop any type of tower crane as per clients’ requirements if the clear information is provided. Originally, our tower crane design is based on Liebherr; but now, we not only introduced Potain design; but also developed special tower crane according to the market needs such as TC5013A with panel mast section. In addition, we also produce some models same as Potain original model, such as F0/23B, H3/36B and etc.
Q: Could ur tower crane spare parts be compatible to Potain or Liebherr?
A: Different machinery possesses different design, and our tower crane also possess her unique feature. But we could manufacture and provide most of Potain and Liebherr steel structure & spare parts, such as mast section, jib length, pins, mechanism, hook…… as per clients requirement.
- Q:What is the difference between the application and maintenance of construction machinery and the operation and maintenance of automobiles? What a promising future!
- Construction machinery operation is not affected by the policy, the introduction of more stringent traffic laws will not have adverse effects. There is no need to pay any fees. Operational risk is significantly lower than the car. This is the outstanding advantage of construction machinery
- Q:with out like running walking or jogging outside for that purpose?
- pilates! okorder /
- Q:I want to know if while you're toasting something and you tank the plug out of the outlet before turning it off, does it ruin the machinery?
- Since you or someone you know onviously did that (unless your like really random) the best way to find out is a: plug in the toaster. B:turn it on. If it turns on then no it does not ruin it
- Q:What kinds of construction machinery are used in the Three Gorges Project?
- Hydraulic excavators and wheel loaders, bulldozers, graders, hydraulic drilling machine, truss boom crawler crane, truck crane, gantry crane, luffing cable cranes
- Q:I am looking for the Leather Picker , Leather Buffer and Picking Stick use in Power Looms, Kindly make contact with me from Pakistan Only with cheap best quality . Any person who can help out me please make contact with me on this email address
- LEATHER PICKERS NO. 22 (L) FOR TURKISH MARKET. LEATHER PICKERS FOR CARPET LOOMS. LEATHER BUFFERS FOR SAKAMOTO LOOMS. HIGH COMPRESSED WOOD SHUTTLES FOR COTTON IN DIFIRENT SIZES. HIGH COMPRESSED WOOD SHUTTLES FOR AUTO LOOMS IN DIFIRENT SIZE. HIGH COMPRESSED WOOD PICKING STICK OF ALL TYPS. HIGH COMPRESSED WOOD SIDE LIVER.
- Q:Requirements for construction engineering personnel
- 4., according to the construction needs and mechanical equipment, reasonable allocation of construction machinery, and constantly improve the utilization rate of construction machinery and construction machinery efficiency
- Q:I am from Turkey and want to import textile machinery parts such as leather picker and wooden shuttle
- Mr. okorder /
- Q:What is an embedded device, and what sorts of office machinery have them?
- What is an embedded device, and what sorts of office machinery have them?
- Q:English is not my first language, and i looked into dictionaries, but it was not clear .. it has something to do with moving or transporting .. but i can't understand what is meant by it exactly ... help me native speakers of English!
- It could be the heading of a certain ledger which includes machines and their parts that are moved from one place to another (itinerary). This may include pneumatic drills, backhoes with drills and buckets as attachments,etc. The phrase machinery itinerary should have a comma between the two words if it is a heading. I suppose even labor in such companies would be regular labor and labor, itinerary.
- Q:Survey: What piece of heavy machinery should I operate after the meds kick in?
- One of those giant bulldozer ball thingys that knock down buildings
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane of TC7527 with 18 Ton Max Load and Span 75M
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords