STK500 48.6*2.2 Scaffolding Tube Steel Standard EN39/BS1139 for Sale CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of STK500 48.6*2.2 Scaffolding Tube EN39/BS1139
Material :Q235B/Q345B/STK500
Size : 48.6*2.2 mm
Surface treatment :Black/Painted/Galvanized
Standard:EN39/BS1139
Futures of STK500 48.6*2.2 Scaffolding Tube EN39/BS1139
Patented STK500 galvanized alloy steel scaffolding tube is with unique 5-layers structure. (Middle parts: one common steel layer between two alloy steel layers.; Each zinc aluminum alloy layer on the internal & external tube surfaces.)
Zinc aluminum alloy layers on the internal & external scaffolding tube surfaces were added with the Mn/Si/ Niobium/Titanium and other metallic elements to reinforce the anti-corrosion prosperity & extend the lifespan.
Light weight & Easy disassembly & reduce labor intensity
Durable & 15+ years lifespan
International general standards & recyclable
Superior load bearing capacity & compression resistance & tensile property & bending resistance
Even galvanized coating & good appearance
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
- It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
- Q:How to maintain the scaffold after use
- The use of the end of the scaffolding (including the construction of accessories) should be returned to the library, classified storage. Open dumps, the site should be smooth, good drainage, under the support pad, and covered with a sheet, accessories, parts should be stored indoors. Wuxi Dongfang scaffolding scaffolding factory products strictly according to JOD-1999 and OD15001-1205 standards, a type of mobile scaffolding scaffolding, scaffolding, roulette scaffolding, scaffolding and scaffolding accessories.
- Q:21M high full scaffold erection scheme
- 2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
- Q:They can see a good place to anchor it but they won't start to build the scaffolding. I've used different builders and tried different bits of the paths, but its just not working. What do I do?
- Hey, This is a good link for downloading Virtual Villagers 3 The Secret City for free: j.mp/1pnRgNo it's completely free and it's very fast to install It is an entertaining game series that consist in exploring new corners of Isola Island, building structures and unraveling mysteries that you will find during the adventure.
- Q:How to calculate the rental price of portal scaffolding
- Under normal circumstances, the small local rental price: 2.5-3.0 yuan / set / day
- Q:Which loads are considered in the design of the scaffold
- The load of the scaffold can be divided into permanent load (constant load) and variable load (live load).The permanent load of the scaffold shall contain the following contents:
- Q:scaffolding piercing.. do they hurt? and how much are they in england? thanks x?
- Yes, they hurt, quite a lot. But how rad they look outweighs the pain. :D
- Q:How many time was Hester Prynne on the scaffold? why was she on it each time? What about the time when pearl and dimmesdale was on it with her? HELP!!!
- She was only on it once officially but there are several appearances in the book.
- Q:along with this question, -what does she think about during this time period?-how does she apprear on the scaffold? -who does she see and how does she feel?THANKS!!=]
- Read the book and find out! I think she's up on the scaffold sometime in spring, but as I said, READ it and make sure.
- Q:If I know the length , width and height of the area for the scaffold, how do I calculate the tonnage?
- tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
STK500 48.6*2.2 Scaffolding Tube Steel Standard EN39/BS1139 for Sale CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords