Steel Coupler Rebar Steel Tube Made in Shanghai China with Good Price

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
6000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality 

1.Description of Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality :

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Steel Coupler Rebar Steel Tube Made in Shanghai China with Good Price

Steel Coupler Rebar Steel Tube Made in Shanghai China with Good Price

2.Advantages of Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality : 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Steel Coupler Rebar Steel Tube Made in Jiangsu China:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality 

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How were scaffolds used in the 1800s?
Mostly the person would be taken onto the scaffold , a rope fixed around their neck, and then the trap door would open and they would drop through and choke to death , very rarely did the neck break in those days , so relatives and friends would pull on the legs , thus to speed up death. Earlier in history people were strung up from trees , and sometimes stood in the back of a cart which was driven away leaving them dangling. The platform on which the guillotine was stood was also called a scaffold at times. These executions were turned into social events and hundreds of people used to go to look.
Q:What are the full house scaffolding specification
7 "technical code for safety of wooden scaffolding in construction" (JGJ164-2008)8 "safety management of construction enterprises" (GB50656-2011)9 "construction safety of the bowl buckle scaffold technical specification" (JGJ166-2008)
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:scarlet letter need help with identifying symbols(scaffold,forest,bush,and letter) PLEASE!!!!?
The letter A on Hester's chest AND the letter A traced in the sky the night the governor died. The A on Hester's chest was, of course, a sybol of Adultry. But in the end, Hester chooses to wear it after she doesn't need to anymore, and most people take that to mean that the meaning of the symbol has changed, it became more something she overcame, it comes to stand for able. The letter A traced in the sky when the governor dies has two different meanings, the general public took it to mean that the governor was now in heaven as an angel, but Dimmesdale saw it as a symbol of his own adultry. The scaffold, as you said, which I think is a symbol of judgement and sin. Pearl is also a symbol - she is a literal symbol of the love affair, but also a symbol of innocence. For websites, just google scarlet letter - thats what I did and found lots of good information.
Q:Who has external scaffolding construction program
Construction preparation1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.2 the size and surface quality of steel pipe shall meet the following requirements:1 new steel pipe should have quality certificate, quality inspection report; steel surface should be straight and smooth, should not have cracks, scarring, stratification, dislocation, hard bend, burr, indentation and deep way;
Q:Construction scheme of portal scaffold
The height of the erection of the steel pipe scaffold shall not exceed the provisions of this specification 1.0.3.The design and construction of the 1.0.4 door type steel pipe scaffold shall comply with the relevant provisions of the state and the relevant mandatory standards.
Q:I have a contract to paint a six story hotel. Problem the roof has an aluminum skirt. Can scaffolding be used?
A little late to be asking that question if you already have the contract, isn't it?
Q:What is rolling scaffolding?
well rolling scaffoled is just what it says,its rolling scaffold.Some scaffold is set up in a way it is not movable,its ushally attached to a structure ,for safty.a rolling scaffold although its not as stable as attached ,its movable,it can be rolled along the area needed to be worked,often with men staying on it while its rolled.
Q:How much more painful is the scaffold/industrial piercing opposed to a normal cartilage piercing?
Gosh Industrial do hurt I'm not going to lie. Cartilage piercings don't hurt. But industrials are really hard to take care of. If you can handle pain then get it. They're worth it but they do hurt.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range