Stainless Steel Hinge Cabinet Hardware

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
500 Kilogram/Kilograms m.t.
Supply Capability:
60 Ton/Tons Per Month m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.stainless steel hinge cabinet hardware ,304/316 stainless

 

2.Surface :Satin 320#,Mirror polished

 

3.Material201,202,301,304,316,316L...304 and 316 material are popular in the market

     

4.The surface can be coated with paint of different colors

 

5.Package:carton package or can do as the requirement of our clients with your logo

 

6.The payment is T/T or L/C 30% down payment should be paid first and others should be   paid after your get the B/L

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the classification of building materials?
Construction technology information according to its nature is divided into seven categories: The first category: construction project legal construction procedures necessary documents; Category II: Integrated management information; The third category: engineering quality control information; Including: acceptance of information Construction management information Product quality certification documents Inspection Report Construction record and inspection report The fourth category: engineering safety and functional inspection data and the main function of the record; The fifth category: inspection batch quality acceptance records; Category 6: Construction log; The seventh category: the completion of the map;
Q:Department of Construction and Construction (2017) 38 on the construction of glass curtain wall what are the requirements
Personnel-intensive, large-scale commercial center, transportation hub, public cultural and sports facilities and other places, near the road, square and the lower for the entrance, personnel access to the building, is strictly prohibited with the whole frame glass curtain wall. Above the building in the second floor and above the installation of glass curtain wall, should be in the surrounding area below the curtain wall reasonable set of green belt or podium and other buffer areas, can also be used to pick the canopy, anti-impact awning and other protective facilities.
Q:Building energy efficiency acceptance of what documents
First of all, you are where the department is responsible for energy conservation acceptance, and then to the relevant departments of the department to understand what specific documents need, because different regions, different time periods of different content of the project acceptance is often different, and government agencies, first Find out the current requirements, do not work with experience, we are ate losses.
Q:How many calculations for a square meter of material?
Upstairs is also quite detailed, when we offer the general is for different types of curtain wall (different panels, keel in different forms to be separated), take a standard position of the surface, calculate the amount of various materials inside * Loss coefficient, and then divided by the area of this face, came out no square meters of the material.
Q:What is the construction process of the point glass curtain wall?
First measure whether the steel structure and drawings in line to see if there is no deviation. If there is no deviation in the steel structure on the line to set the location of the mother, the location should be as accurate as possible. And then welding to the mother base. The welding is completed and then the jaw pieces are mounted on the female base, and then the splice fitting is mounted on the hole of the glass, and then the hook is hung up and the screw is tightened. Out of place.
Q:Curtain wall energy-saving project acceptance of the general project which
Construction and installation requirements, including insulation material fixed, partition thermal bridge, steam layer, ventilation equipment, glass installation, shade installation, condensate set system installation.
Q:Fire aluminum glass is what glass where to sell
This involves more, you can special check, of course, you need to be specific communication
Q:What are the curtain wall materials to do? The beginning of the time
Curtain wall works include: 1, curtain wall works to complete the map, structural calculations, design instructions and documents; 2, the architectural design unit of the curtain wall engineering design confirmation documents; 3, the curtain wall works with a variety of materials, hardware accessories, components and components of product certification, performance testing reports, admission inspection records and re-inspection report; 4, the curtain wall works of the silicone structure of the identification of the certificate and the inspection certificate, the import of silicone structural adhesive business certification, silicone structural adhesive compatibility and peel adhesion report, stone sealant with the pollution test report ; 5, post-embedded pieces of the field tensile strength test report; 6, the wind wall of the wind pressure deformation performance, airtight performance, watertight performance and other design requirements of the performance test report; 7, glue, curing the environment temperature, humidity records, two-component silicone structure of the mixing test of plastic and pull test records; 8, lightning protection device detection burn; 9, hidden engineering acceptance documents; 10, the curtain wall components and components of the production of burning, curtain wall installation construction records; 11, tension rod cable prestressed tension record; 12, water test records;
Q:What are the contents of the curtain wall energy conservation project quality acceptance?
The curtain wall is the external wall of the building, not load, like the curtain hanging up, it is also known as the "curtain wall", is a modern large and high-rise buildings with decorative effect of light wall. By the panel and the supporting structure of the system can be relative to the main structure of a certain displacement or have their own ability to deformation, do not assume the role of the main structure of the building outside the envelope or decorative structure. Curtain wall energy-saving projects used in the installation of insulation materials should be taken to protect moisture, water and other protective measures.
Q:Whether the civil tender contains the curtain wall and does not contain the curtain wall
If the total tender documents contain curtain wall, indicating that the total subcontract management, behind the curtain wall unit calibration, signed the total package, the owner and the curtain wall units of the tripartite agreement, take the total package of the notice and the three parties can be directly filed for the record.
We make every step strictly, especially for testing. We have spectroscopy analysis, metallographic microscope, tensile, hardness, impact and X-Ray test, liquid penetrant, magnetic particle test and NTD inspection. The interpretation of the data from these test facilities could promise the best quality of our raw casting, any required test report of process should be attached before delivery of all the casting parts of each.

1. Manufacturer Overview

Location Guangdong,China (Mainland)
Year Established 2008
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range