• Cookware Parts System 1
Cookware Parts

Cookware Parts

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1000 Piece/Pieces pc
Supply Capability:
60 Ton/Tons Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

About Factory:

1. Experience:We have many years experience in casting and took the lead in passing ISO9001:2000 among the same industry.

2. Good After Sales Service:We have advanced facilities to guarantee our products' quality and any small problem happening of our products will be solved at the most prompt time. 

 

About Products 

High Quanlity Investment Casting/Precision Casting Stainless Steel  -Building Hardware-Glass Clamp -Adjustable Stem Connection

Material : 304 316 316L

Surface Treatment : Stain or Mirror Polish

Delivery Time: 45Days After Deposite

Package: Carton or Pallet

Payment : T/T

    

 

Our products get a good reputation from our customers in America, Canada, Germany, France, England, Japan, etc. We will provide higher quality products and better service to all our customers.

Q:How many calculations for a square meter of material?
Curtain wall material calculation points: 1. Panel: panel ratio of expansion area * utilization (general 1.03) 2. keel: linear density * per square meter length * utilization (generally 1.05 ~ 1.15, according to material specifications) 3. Attachment: use per square meter (weight or volume number) * Utilization rate (general 1.03) 4. Low-value consumables: 15 ~ 25 (yuan / m2, according to the type of curtain wall to consider) 5. Labor costs: market decisions
Q:Whether the civil tender contains the curtain wall and does not contain the curtain wall, behind the owner and the general contract of the contract agreement What is the difference
If not included, that the curtain wall to a separate tender, not included in the total package management, that curtain wall bid to issue a separate bid notice, the top of the tender to do the chapter, curtain wall units and owners signed a contract, the record is to take both sides of the contract and curtain wall Successful notice of the record.
Q:What is the construction process of the point glass curtain wall?
First measure whether the steel structure and drawings in line to see if there is no deviation. If there is no deviation in the steel structure on the line to set the location of the mother, the location should be as accurate as possible. And then welding to the mother base. The welding is completed and then the jaw pieces are mounted on the female base, and then the splice fitting is mounted on the hole of the glass, and then the hook is hung up and the screw is tightened. Out of place.
Q:Bidding documents are glass curtain wall, the party has to check the aluminum alloy window, how to do?
Generally fixed on the window lintel, is the top of the entire window.You need the proportion should be on the proportion of solid slip, the slide is the sash of the slide plus fixed, is a dual-use profiles, doors and windows designed to save Material, and it can be made to the sill a chute, you can also fix the above glass. Generally no fixed ratio
Q:What are the curtain wall materials to do? The beginning of the time
Curtain wall works include: 1, curtain wall works to complete the map, structural calculations, design instructions and documents; 2, the architectural design unit of the curtain wall engineering design confirmation documents; 3, the curtain wall works with a variety of materials, hardware accessories, components and components of product certification, performance testing reports, admission inspection records and re-inspection report; 4, the curtain wall works of the silicone structure of the identification of the certificate and the inspection certificate, the import of silicone structural adhesive business certification, silicone structural adhesive compatibility and peel adhesion report, stone sealant with the pollution test report ; 5, post-embedded pieces of the field tensile strength test report; 6, the wind wall of the wind pressure deformation performance, airtight performance, watertight performance and other design requirements of the performance test report; 7, glue, curing the environment temperature, humidity records, two-component silicone structure of the mixing test of plastic and pull test records; 8, lightning protection device detection burn; 9, hidden engineering acceptance documents; 10, the curtain wall components and components of the production of burning, curtain wall installation construction records; 11, tension rod cable prestressed tension record; 12, water test records;
Q:What is the classification of building materials?
Main points: foundation and foundation, the main structure, architectural decoration, construction roof, hydropower, fire, elevators, etc.
Q:Curtain wall design documents review how qualified newspaper supervision
Upstairs that is also OK, but I think the best to play an A4 table, followed by a certificate sent in the past better, so it seems more formal, but the certificate to his copy is on the line.
Q:Department of Construction and Construction (2017) 38 on the construction of glass curtain wall what are the requirements
New residential, party and government organs office building, hospital outpatient emergency building and ward building, primary and secondary schools, nursery, kindergarten, the elderly building, not in the second floor and above with glass curtain wall.
Q:What are the contents of the curtain wall energy conservation project quality acceptance?
Curtain wall energy-saving project quality acceptance includes the following: 1) hidden acceptance requirements. 2) curtain wall materials, accessories, accessories, components of the quality, including insulation materials, glass, shade components, unit curtain wall panels, seals, insulation profiles. 3) materials, accessories, accessories, components witnessed sampling, re-inspection requirements. 4) curtain wall air tightness requirements, laboratory inspection requirements. 5) curtain wall thermal construction requirements, including insulation material installation, steam layer, curtain wall and wall joints, structural joints, structural joints, hot bridge parts, heat sink joints, unit curtain wall between the joints, Water drainage structure and so on. 6) construction and installation requirements, including insulation material fixed, partition thermal bridge, steam layer, ventilation equipment, glass installation, shade installation, condensate drainage system installation.
Q:Residential stone curtain wall design height of not more than 50m to demonstrate it
Not more than 50 meters, do not need expert argument.
We make every step strictly, especially for testing. We have spectroscopy analysis, metallographic microscope, tensile, hardness, impact and X-Ray test, liquid penetrant, magnetic particle test and NTD inspection. The interpretation of the data from these test facilities could promise the best quality of our raw casting, any required test report of process should be attached before delivery of all the casting parts of each.

1. Manufacturer Overview

Location Guangdong,China (Mainland)
Year Established 2008
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords