Semi-electric aerial reclaimer--DYT(three masts)

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

ModelDYT2-3.5DYT2-4.0DYT2-4.5
Rated capacitykg200
Max working heightmm550060006500
Max platform heightmm350040004500
Overall lengthmm1300
Overall widthmm840
Overall heightmm166018301990
Platform sizemm900X600
Ground clearancemm30
Wheelbasemm770
Lift motor12VDC/1.5kw
Raising/Falling speedsec15/1718/2021/23
Battery12V/120Ah
Charger12A/15A
Rear wheelmmФ150×40
Front wheelin5
Overall weightkg265315365

Standard Configuration
-Emergency stop button
-Charge lamp
-Double brakers
-Voltage display
-Strut bar for safe overhaul
-Emergency descending button
-Overload limit

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Call for personal insurance, construction machinery insurance
You can insure it in your own name, depending on how much you have With more than one, insurance companies generally prefer it. Specific insurance companies to see the conditions and requirements.
Q:How to prevent engineering machinery failure
Inspection and maintenance after running out: check fuel reserves, check the oil sump, oil surface and cleanliness. If the oil surface is found to be too high and gradually diluted, the reasons should be found out
Q:I want to sign up for a construction machinery rental company! What should I do? Steps? How much do you charge for a year?
Registered company each link required statutory time limit: check the normal circumstances within 2 working days to inform the result; account injection of bank procedures according to the provisions of the bank, usually in the 3 working days; verification under normal circumstances within 7 working days of the business license of the statutory time limit for 3 working days of audit group, tax registration certificate the statutory time limit for 30 working days to complete the registration fee: 1500 yuan single registration
Q:Which city is the capital of construction machinery in China?
China Construction machinery capital is the title of "China Construction machinery capital" awarded by Xuzhou Machinery Industry Federation of China in 2010 in Xuzhou.
Q:Does the construction forklift need to be on the card?
Different auxiliary working equipment can be changed, and the lifting, lifting and other materials such as wood handling can also be carried out. In the road, especially in the construction of high-grade highways, loaders are used for filling and excavating of subgrade engineering, aggregate and loading of asphalt mixture and cement concrete field
Q:What are the companies in the chain of construction machinery in China?
Only the pure engineering machinery imports have Chinese area general agent (an agent: direct and production factory, docking) as agent of original Hitachi Shanghai Yongli, China areas of the original Hitachi belong to two agents (the chain corporation is what you should say it)
Q:Can mechanical design be published in nature?
Naturally, this magazine does not have any columns related to mechanical design, so it is unlikely to pass if it is submitted
Q:What are the total cost of the project?
(3) other expenses for the construction of the project, including land fees and other expenses related to the project, that is, the relevant government fees and other expenses related to the future production and operation, that is, the cost of their own operation. (4) preparation fee (including basic reserve fee and price increase reserve fee, that is, risk reservation allowance), (5) loan interest during construction period, this is relatively clear.
Q:The state stipulates that the machinery processing industry accident how to compensate?
The basic requirements of mechanical equipment in the whole period of machinery safety regulations, may be due to mechanical failure of the equipment itself, jeopardize the security of all types of accidents have been understood and occupation health caused by injury and avoid unnecessary physical consumption, with operators, mental tension and fatigue. Whether it is design or machine safety predetermined function, should follow two basic methods: proper structure design choice, as far as possible to avoid or reduce the risk; by reducing the operator's involvement in dangerous areas, in low risk people
Q:Is it necessary to have the automation of engineering machinery and the automation of mechanical design?
Yes, mechanical design is extremely automated. It is the process of automating the automation of the "Engineering" machinery service,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range