screw jack base U head Galvanized/Painted

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
10 m.t.
Supply Capability:
500 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


1. Material:Q235 
2. Size: various sizes are available 
3. Weight: standard 
4. Surface treatment :HDG/Galvanized/Painted 




 Product Specifications


1. Material:Q235

2. Size: 136*138mm or customer demands


4. Surface treatment :HDG/Galvanized/Painted

5.Standard :EN74

6.The parts of the ring-lock system :vertical, adjustable jack base, ledger, diagonal brace, bracket

7.Main market: America, Europe, Australia Africa, Asia and mideast

8.Quality: durable, stable, skid-proof, antirust, easy to assemble & dismantle

9.Packaging :woven bags with pallets or as your requirements



We are manufacturer for many years from Cangzhou city, all our casting products are exported to middle east, east and south Asia, and Europe market, BV certification make our products win high reputation from our customers.


We can supply most of the casting or forged parts & accessories for scaffolding,ring-lock system, cup-lock system and formwork, please feel free to contact with us for whatever you are interested.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the characteristics of disc scaffolding
. Disc scaffolding and scaffolding, also called Leiya frame, disk type scaffolding, socket type, scaffolding, system frame. The main features are: disc type scaffold surface treatment: the main parts of the internal and external advanced hot galvanized anti-corrosion technology, which can improve the service life of the product, and provide further guarantee for safety, at the same time to reach a beautiful, beautiful disc scaffolding capacity
Q:The construction scheme of high rise and external cantilever scaffold!
Cantilever scaffold erection scheme1, the basis of preparation (omitted)2, engineering survey:This project is the building of electricity production, Handan power supply company, located in the main street and Chaoyang Road Interchange, a total construction area of 17747.8m2, the ground layer ten, partial eleven, annex four, underground two floors, the total height of the building is 44 m, frame structure, the project frame adopts double row cantilever beam pick the scaffold in a layer, five layer nine layer is arranged in the cantilever beam. The scaffold scaffold.
Q:I need to be guided to supplier of Aluminum Scaffolding?
Please Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
Q:How long do you have to wait in between getting two piercings? cartilage and industrial (scaffold)?
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Q:On what page of The Scarlet Letter does Hester enter the scaffold?
i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra satisfied to invite -Alice
Q:What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
(4) the bearing capacity is large: the vertical rod connection is a coaxial core socket, and the cross bar is connected with the vertical rod by a bowl buckle joint. And the axial line of each member is placed at one point, and the node is in the plane of the frame. (the entire frame bearing capacity, about the same clear fastener type steel tube scaffold condition is improved by more than 15%,)
Q:Scaffold Piercing Aftercare?
I've had my industrial for over two years, it's a great piercing but aftercare is important and it does take awhile for it to heal. Here was my schedule for my industrial and all of my piercings since then... When I got my industrial I was in school until about 4 pm as well (I'm no longer in school now so I do it a little differently now) so this schedule might be doable for you. I took showers in the morning but that's not a huge problem. I'd wake up in the morning and while showering I'd clean my piercing with antibacterial soap AFTER I washed my hair and did my other shower rituals. Then when I got out of the shower I would do a short sea salt soaks (sea salt soaks are going to be much better for your piercing than H2O). I'd mix non-iodized sea salt in a clean new dixie cup with warm water, then I'd bend over and let my ear soak in the water for about five minutes. Sea salt soaks are great because they help promote healing and prevent/clean up infections. Then I'd go to school and after school I'd do a simple little rinse with a saline solution (which you can buy at any grocery store, usually around the contact supplies). Saline is good for when you're in a rush and don't have time to do a sea salt soak. Then at night I'd do a long sea salt soak and I'd soak my ear for about 10-15 minutes. Now for you, since you shower at night I would clean my ear with antibacterial soap every night in the shower and do a long sea salt soak after my shower, before bed. Then in the morning I'd so a short little sea salt soak before school and after school you can use a saline solution or the H2O. Good luck! This worked for me with all 6 of my piercings.
Q:how much does a scaffold peircing hurt compaired to a nose piercing?
if you get it done with a gun it doesnt hurt at all but you shouldntget it with a gun cz it can shatter ur cartilage . i dont think it hurts at all i pierece mine all the time i ahve about.. 8 in each ear i did them all myself it doesn hurt me tht bad after woards its tender to the touch tths it tho .aah
Q:what is common cause of formwork and scaffolding failure during construction?
Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.
Q:What are the common rules for calculating the amount of scaffolding works
According to the wall masonry scaffolding (single) vertical projection area calculation with square metre.Scaffolding, without deduction of door and window opening, air ring, vehicle channel, deformation joint area. At the same time, the height of the same building is different, according to the vertical height of the building.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range