Scaffolding System ID 15 with Hight Quality

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg/m²
Supply Capability:
10000 kg/m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of ID 15 Scaffolding Description:

ID 15 Scaffolding is designed for supporting the formwork system in construction, Can be used to be tower, it is popular in UAE.

 

2.ID 15 Scaffolding advantages:

ID 15 Scaffolding adapts flexible to any wall geometry

Fast due to pre-assembled panels with built-in plywood

Strong with 80 kN fresh concrete pressure per m2 allowed

Economical due to longer service life and fewer parts

Hire option given in selected regions

Hot selling ID 15 Scaffolding with low price

 our scaffolding ID15 which is consists of base head,frame 133,frame 100,end frame,diagonal).

and it's compatible with  ID 15 perfectly.

 It's easy to erect and fit in your work compared with conventional method, saving you 20% working time .

ID 15 Scaffolding Quick Details

Place of Origin:  China (Mainland)

Brand Name: ID 15 Scaffolding

SCAFFOLDING: tower

 

Packaging & Delivery

Packaging Details:

iron packed

Delivery Detail:

upon receipt of 30% of deposite after confirmed the order

 

3.ID 15 Scaffolding Products pictures:

Scaffolding System ID 15  with Hight Quality

 

 

 

4.ID 15 Scaffolding  Specification:

Scaffolding System ID 15  with Hight Quality

5.FAQ

  We have organized several common questions for our clients, may help you sincerely:

1How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the functions and requirements of the masonry wall
security1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.
Q:Do I twist my scaffold piercing?
Why are you using Claire's crap? You need to be doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. Don't twist them as that drags in crust and bacteria and tears up the inside of the piercing. Stop trying to pick stuff off from your ear and go have a reputable piercer check out the scabbing, it could be crust it could be something wrong. If your piercer didn't tell you to do sea salt soaks to keep it clean go to a better piercer.
Q:What are the problems with having scaffolding piercing in the ear? (pic inside)?
i've not had scaffolding but i've got a wide range of cartilage piercings and they take about 12weeks to heal... i would just say be careful not to catch it and keep it clean. good luck :)
Q:Can I get an industrial/scaffold piercing pierced with 2 separate bars?
nope! Cartilage piercings take about a year to fully heal up. Yes, you can get 2 separate bars, but let the piercer know thats what you want. Industrials are VERY hard to take care of. Make sure to listen to EVERYTHING the piercer says!
Q:How long after getting an industrial/scaffold ear piercing does it stop hurting?
go the the dr or you piercer
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-9, 5, GB/T3091-200
Q:Should the WWE put John Cena in a triple threat thumbtack scaffold cage of death with New Jack & Necro Butcher?
Don't forget with fire and flourescent tubes surrounding the ring
Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
Disc scaffolding systemIs a new type of scaffolding, the product was introduced in Europe in the last century in 80s, is the upgrading of products after the bowl buckle scaffold. Also called chrysanthemum disc scaffolding, scaffold system, disc scaffolding system, buckle disc scaffolding, layher frame (layer frame, Lei Ya frame, because the basic principle of the scaffold is by the German LAYHER (Lei Ya)'s invention, the industry has been called the "thunder sub frame"
Q:people who have an industrial/scaffolding piercing?!?
I okorder.com for barbells. They have some pretty epic lightnight bolt ones and zigzags and they are like 3 bucks!!!! You can never find them in the mall like that :P lol. Anyway, i deff. think you should get the piercing. It's worth the pain. It'll be over in 2 seconds lol. Good luck :D
Q:Scaffolding scaffolding erection norms which requirements, who can say?
This problem is more professional, we must be more professional people to answer, just do this industry, here on the simple about the content, you can refer to see.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range