Scaffolding Coupler Steel Galvanized Forged Half Coupler with Wedge Head

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

1. Scaffolding Coupler  Steel Galvanized Forged Half Coupler with Wedge Head  Description 

What is   Scaffolding Coupler ?

Scaffolding Coupler is accessories of the scaffolding productions , it is usually made of Q235 steel material , The production technology can be forging or prssed  , With the development of the construction , Scaffolding Coupler  Steel Galvanized Forged  Half  Coupler with Wedge Head    has beome more and more popular. 


Function of the Scaffold   Coupler 

Scaffolding Coupler  Steel Galvanized  Forged    Coupler  used to connect two scaffolding tubes at certain direction . The scaffolding coupler used to connect tubes and bulid hige woking towers .It can be used to 48.3mm tube or 48.3mm and 60mm tube  Every size avaliable . 


Advantage of  Scaffold   Coupler

Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.


2.Main features of Scaffolding Coupler  Steel Galvanized Forged  Half Coupler with Wedge Head  

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3.Scaffolding Coupler  Steel Galvanized Forged  Half  Coupler with Wedge Head    images 

Scaffolding Coupler  Steel Galvanized Forged Half  Coupler with Wedge Head

Scaffolding Coupler  Steel Galvanized Forged Half  Coupler with Wedge Head


4. Scaffolding Coupler  Steel Galvanized Forged  Half  Coupler with Wedge Head  Specification 

 Raw Material: Q235

 Size: 48.3mm

 Weight:1.93kg

 Certifies:, EN 74 and OSHA

 Technology : Forging 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered



5.FAQ of Scaffolding Coupler  Steel Galvanized Forged  Half  Coupler with Wedge Head 

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 


Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

 




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How were scaffolds used in the 1800s?
Mostly the person would be taken onto the scaffold , a rope fixed around their neck, and then the trap door would open and they would drop through and choke to death , very rarely did the neck break in those days , so relatives and friends would pull on the legs , thus to speed up death. Earlier in history people were strung up from trees , and sometimes stood in the back of a cart which was driven away leaving them dangling. The platform on which the guillotine was stood was also called a scaffold at times. These executions were turned into social events and hundreds of people used to go to look.
Q:in the scarlet letter, what events happen at the scaffold during the night??
On the Scaffold Dimmesdale is really starting to go crazy. the guilt in his heart about loving hester is eating him up. he goes onto the scaffold thinking no one will see him. he is punishing himself. he yells out and thinks that it will be the end of his secrect but no one hears him. they just think he is the cry in the night. then reverend wilson comes along. but he doesnt see dimmesdale. then hester and pearl walk by they notice them. they come up on the scaffold. Pearl asked dimmesdale if he would stand with hester and her at noon the next day but of he says no that he will only stand with them on Judgement Day. then they see the scarlet letter in the sky and the town people thought that it was just an a for angel because the gov passed away. they next day wilson finds dimmesdale's glove on the scarrold but he thought that the devil put it there. i cant remember what chapter it is in but it is toward the middle good luck with the book i loved it
Q:Which accessories are included in a movable scaffold
(1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.(2) scaffold with various specifications of steel pipe. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.(3) steel scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q:what is scaffolding in early childhood?
Maybe this will help: scaffolding is the support provided by adults working with a child to help promote and extend development of knowledge and skills. It can mean asking appropriate questions to help extend a child's thought process, or providing suitable activities to help a child learn through hands-on activities. Look it up in your textbook and read the definition and apply it to my explanation above for a deeper understanding, and don't be afraid to ask your instructor questions like this! That's what s/he is there for!
Q:Industrial/Scaffolding piercing swollen and sore?
Your body has to adjusting and trying to heal. It'll be sore and swollen for a bit. Try not to jerk it around anything. If you don't see the swelling starting to go down and/or the soreness increases I'd have a doctor check it out.
Q:Advice to anyone thinking about getting an industrial/scaffold piercing?
Most piercings need 6 months to fully heal. Industrial will take up to a year to do so. You have to keep the jewelry in and do not take it out ( not even once ) for the whole period of 1 year. This means that you can't hide it for school. You can't put a retainer on also, cause only titanium or stainless steel material are proper for an open wound aka a new piercing. This piercing is not easy to heal and can stay irritated for long. It goes through cartilage and you have to be really careful with the aftercare and the piercer's info if you want to keep the piercing and yourself healthy. You have to be careful and not touch it or play with it and twist it or take it out. You clean this piercing with sea salt soaks or non alcohol antibacterial soap 2-3 times a day. You dry it with paper towels. If you can do the above daily and be extra careful go get it done. Gluck
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
With regard to the design and construction of floor type (double pole type) single and double row steel pipe scaffold for industrial and civil construction, and the design and construction of formwork support in the construction of horizontal concrete structure. National compulsory technical norms, because of its complexity, and you proposed "one square meter standard steel scaffolding the number of meters" is a vague and unclear description of the problem, considering the matter of security,
Q:Could someone please tell me a very simple scaffold on writing commentary?
To know about College and university! log on to alumne.net/
Q:what is common cause of formwork and scaffolding failure during construction?
Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range