scaffolding Cast steel diagonal brace end

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Shandong China (Mainland)


Model Number:
SD-2006B
item:
diagonal brace end
material:
cast steel
surface:
self colour
weight:
0.51kg

Packaging & Delivery

Packaging Detail:bags+steel pallet or as your requested
Delivery Detail:20-45days according to your quantity

Specifications

Building Ringlock Diagonal Brace End
material:cast-steel
surface:self colour
weight:0.51kg
high quality best price

Building Steel Ringlock Scaffolding Diagonal Brace End

1.Specification

1)material:cast-steel

2)weight:0.51kg (no pin)

3)surface treatment: self colour

4)ISO9001:2000 approved

5)OEM service offered

6)MOQ:negotiation

7)high quality with excellent performance


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:can anyone tell me if it is true that the scaffolding on york minster has to stay there for political reasons?
York Minster Scaffolding
Q:Standard for inspection of portal scaffolding
1.4 willow nails shall be made of ML2 steel specified in GB 715. All accord with the 1.5 electrode should be used in GB 5117 series E43 electrode. Comply with the 2 basic requirements: qualified 2.1 door frame and accessories in different combination conditions, shall be accorded with the inspection results are summarized in table NO:2008JW1658 inspection project and standard units of measurement test results 1# 2# single determine connectivity and interchangeability. When the 2.2 cross support, the connecting rod and other accessories are connected with the door frame, the utility model is in conformity with the retreat mechanism which is used to prevent the exit. When the connecting rod is used with the lock arm, the connecting rod is not limited by the limit. The 2.3 level frame, and the door frame scaffolding should prevent off the hooks, are in line with the fastening mechanism of the fall.
Q:I need to set up scaffolding on a tiled floor to reach some lights 28 ft high?
unless you are majorly manhandling the scaffolding, such as slamming it around and jerking it into place, etc, you won't crack the tiles (this is being said with the hopes that the flooring was installed correctly.) i would throw a layer or two of bedsheets or a good heavy drop cloth over the tiled floor just to protect the tile from being chipped or scratched. be careful going up so high. good luck!
Q:How to calculate the fastener type steel pipe scaffold
The provisions of 1.1.4 in steel pipe scaffold structure thin-walled steel structure design, involved in the weld connection, the stability coefficient of the axial compression members, should use the "technical specification for Cold-Formed Steel Structures" (GBJ18-87).1.1.5 provides for the design and calculation of scaffolding:(1) the calculation of the overall stability of the frame (can be converted into the calculation of the stability of the opposite pole);(2) checking the strength, stability and stiffness of horizontal bar;(3) calculation of strength and stability of attached and continuous wall;(4) anti overturning checking;(5) checking of foundation and supporting structure.
Q:Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q:Why won't the WWE hire Necro Butcher and New Jack to work scaffold matches with John Cena?
World Wrestling Entertainment has never done Scaffold Matches in it's 5 Decade Histrory. If you want to see Scaffold Matches, go buy tickets to an Independent Wrestling Show. WWE has no interest in hiring Necro Butcher. He doesn't have the Look that they want. WWE doesn't have any interest in New Jack. They've known about New Jack for 2 decades and haven't made any attempts or expressed any interest in signing him.
Q:Is my scaffold peircing ok? x?
If it gets worse you should swear loudly at yourself for being so stupid.
Q:Who has external scaffolding construction program
1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.1.1.3 foot plateThe scaffold made of bamboo or bamboo bamboo string plate, each quality should not be greater than 30kg.1.1.4 wall partsThe material of the wall parts shall be in accordance with the provisions of the current national standard "Q235-A" (GB/T700).1.2 inspection of qualified parts should be classified according to the varieties, specifications, stacked neatly, smooth, stacking sites may not have water.1.3 should be cleared to set up the site debris, flat set up the site, and make water flow.1.4 when the foundation of the scaffold has equipment foundation, pipe trench, the scaffolding should not be used in the process of excavation, otherwise it is necessary to take reinforcement measures.
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
Q:The construction should strengthen the specific meaning of scaffolding and support
The scaffold is outside the frame, it is characterized by relatively large height, shape, wind load and gravity load is; while the template bracket shape because the concrete component varies, the total height, gravity load, improper placement to lose stability, no need to calculate the wind load, etc..

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range