Safe SGS frame scaffolding, frame scaffolding system, scaffolding frame

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Brand Name:
safe frame
Model Number:
Adjustable
Materials:
Q195 Q215 tube
Color:
yellow silver green
Surface:
galvanized electroplated
Certificate:
ISO9001:2008 CE EN
produce:
cutting,drilling,welding,galvanized,assembling
min order:
any quantity you need, offer sample
delivery time:
5-20 days after got your deposit
payments:
TT LC DP DA

Packaging & Delivery

Packaging Detail:Palletized in steel pallet and baled with steel tape
Delivery Detail:5-20 after receive your deosit or L/C at sight

Specifications

Materials:Q215 42*2,27*1.5,22*1.8
Surface:Electroplated,HDG,paint
ladder walkthrough apartment mason
Certificate:ISO SGS

Frame scaffolding is very popular both in home and abroad market. Walhthrough, ladder, Mason, Apartment. Its have American type, layher type, China type, Plettac type and so on. They are easy to set up and disassemble. As to surface treatment have hot dip galvanized, electroplated, power and painting. These type scaffolding used to construction, repairment, decroration and so on.

1.Cutting tube 2.Stamping 3.Punch holes 4.Welding 5.Painted 6,combine and finished 7.Package
  Frame
scaffolding
walkthrough
    frame
1219*1930mmQ215
42.7*2.3
42.7*2.0
27*1.5
Galvanized
Painting
Electroplate
SGS1576.3
ISO90012008
1219*1700mm
1219*1524mm
1219*914mm
Ladder frame1219*1930mm
1219*1700mm
1219*1524mm
1219*914mm
Mason frame1524*939.8mmQ215
Q235
42.7*2.3
42.7*2.0
48*3.0
48*2.5
27*1.5
Galvanized
Painting
Electroplate
1524*1244.6mm
1524*1397mm
1524*1549.4mm
1524*2006.6mm
Mini frame1219*914mm
914*914mm
Apartment914*3251mm
914*2032mm


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who has external scaffolding construction program
Construction preparation1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.2 the size and surface quality of steel pipe shall meet the following requirements:1 new steel pipe should have quality certificate, quality inspection report; steel surface should be straight and smooth, should not have cracks, scarring, stratification, dislocation, hard bend, burr, indentation and deep way;
Q:When scaffolding is erected on the base of the permanent structural concrete
Selection of the project using 48 mm, 3.5mm wall thickness of steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, such as net feet
Q:Scaffolding installation and precautions?
Began to set up the column, should be set up every 6 span of a throw support, even after the installation of the wall is stable, can be removed according to the circumstances.
Q:What is the importance of the second scaffold scene in the Scarlet Letter?
concentration your activity on who's on the scaffold, how they react to the customary public shaming, and what the reader learns with connection with the character from analyzing the define of them on the scaffold.
Q:Can anyone give me a detailed design of a simple scaffolding?
can't draw here, but it's just an x with a flat board on top in 3 dimensions.
Q:scarlet letter need help with identifying symbols(scaffold,forest,bush,and letter) PLEASE!!!!?
I for irritable Good thing we're not traveling around together. We'd get in a heap of trouble, lol
Q:scaffold, where to buy?
Unless you need it constantly it might be cheaper to rent as most contractors do. Home Depot, Safeway Rentals or most any tool and equipment rental outfit rents it at pretty reasonable rates.
Q:How to calculate the rental price of portal scaffolding
According to the daily calculationSeparate accessories, such as pulleys, pedals, base, three foot and so on
Q:In Virtual Villagers 3, my builders won't build the scaffolding for the statue! Help!?
Hey, This is a good link for downloading Virtual Villagers 3 The Secret City for free: j.mp/1pnRgNo it's completely free and it's very fast to install It is an entertaining game series that consist in exploring new corners of Isola Island, building structures and unraveling mysteries that you will find during the adventure.
Q:Scaffolding scaffolding erection norms which requirements, who can say?
The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range