Ringlock Scaffolding for Construction with SGS AS/NZS1576.3 Qualified CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified 

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Installation Scaffold

  • Lapping Form:Special-Shaped Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Projecting Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Materials Standard:Q235, Q345

  • Materials Specification:48.3*3.25mm, 48.3*3.0mm, 48*2.5mm

  • Qualified Certificate:SGS Test Report, ISO9000, Coc

  • Surface Treatment:Hot DIP Galvanized, Power Coated, Electroplated

  • Standard Size:0.5m, 1m, 1.5m, 2m, 2.5m, 3m

  • Ledger Size:0.6m, 0.9m, 1m, 1.2m, 1.5m, 1.8m, 2.0m, 2.5m, 3m

  • Production Ability:10 Tons Per Day

  • Procedure:Cutting, Drilling, Welding, Galvanized, Assembling

  • Export Markets:North America, South America, Southeast Asia, Western Europe

  • Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified CNBM

  • Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified CNBM



  • Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified CNBM


  • Descriptions of Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified 

  • Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.

  •  

  • Ringlock scaffold has the following features:

  • Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.

  • Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.

  • Low maintenance: The dip galvanized finish will greatly last the life of the products, no paint required, no more rust or corrosion, even they can be stored externally.

  • Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights. Reasonable customer requirement is acceptable



  • The System of Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified 

  • Ringlock
    Scaffold
    System
    Standard
    Q345 tube
    48.3*3.25
    ProcedureSizeWeight(kg)SurfaceCertificate

    1.Cutting

    2.Drilling

    3.Plating    cutting

    4.Forming

    5.Welding

    6.Remove welding slag

    7.Galvnize

    8.Surface finish

    9.Assembling

    10.Packing

    11.Logistics
    0.5m2.96HDGSGS ISO EN
    1.0m5.33HDGSGS ISO EN
    1.5m7.73HDGSGS ISO EN
    2.0m10.06HDGSGS ISO EN
    2.5m12.42HDGSGS ISO EN
    3.0m14.78HDGSGS ISO EN
    Ledger
    Q235 tube
    48.3*3.25
    0.73m3.81HDGSGS ISO EN
    1.09m4.93HDGSGS ISO EN
    1.40m6.44HDGSGS ISO EN
    2.07m8.71HDGSGS ISO EN
    2.57m10.64HDGSGS ISO EN
    3.07m12.41HDGSGS ISO EN
    Brace
    Q235 tube
    48.3*2.5
    1.5*2m9.04HDGSGS ISO EN
    2.0*2m10.05HDGSGS ISO EN
    2.5*2m11.42HDGSGS ISO EN
    3.0*2m12.13HDGSGS ISO EN
    Bracket
    Q345 tube
    48.3*3.2
    0.35m4.5HDGSGS ISO EN
    0.75m6.7HDGSGS ISO EN
    1.1m9.9HDGSGS ISO EN
    Plank
    Q235 
    1.5mm
    1.8mm
    0.73m5.1HDGSGS ISO EN
    1.09m6.9HDGSGS ISO EN
    1.4m8.85HDGSGS ISO EN
    2.07m12.11HDGSGS ISO EN
    2.57m15.02HDGSGS ISO EN
    3.07m17.69HDGSGS ISO EN
    base
    collar
    0.16m1.7HDGSGS ISO EN
    0.2m2.1HDGSGS ISO EN
    Toe
    board
    wood
    15*1.5cm
    0.73m2.16anti-fire ISO EN
    1.09m2.98anti-fire ISO EN
    1.57m4.12anti-fire ISO EN
    2.07m5.75anti-fire ISO EN
    2.57m6.88anti-fire ISO EN
    3.07m7.98anti-fire ISO EN
     
  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.
Q:Industrial / scaffold piercings - pierced with rings?
Having one bar can definitely put a lot of pressure on the piercing but it's the best way to go about getting an industrial piercing. It can be a difficult piercing to heal is all. If you get two rings it is very likely that one will slightly migrate in angle and that is going to make it impossible to properly fit a bar through the two holes. Plus, 6-8 weeks would be WAY way way too early to change a cartilage piercing. Try 6-12 months. And an industrial will never reject simply because of the bar, it will reject if it was pierced incorrectly or on someone's ear that is not anatomically correct for the piercing. And I promise, from someone who has had helix piercings done with rings and with straight barbells as well as having one single barbell through my industrial your hair can get caught on them all. If the bar fits properly the balls should fit pretty snugly against your ear.
Q:Cantilever scaffold technical disclosure
The surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scarring, delamination, dislocation, hard bending, burrs, indentation and deep drawing.
Q:What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Q:A window washer is standing on a scaffold supported by a vertical rope at each end.. . .?
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Q:21M high full scaffold erection scheme
dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
Q:scarlet letter need help with identifying symbols(scaffold,forest,bush,and letter) PLEASE!!!!?
hey...i'm trying to figure out the same thing....weird.
Q:Having problems with my scaffold/industrial piercing?
have a piercer look at it.
Q:What is a bar in the scaffold
Scaffolding is 1.5 meters of the cross bar is called the cross bar; long to such as the steel pipe is generally called the 6 horizontal pull rod
Q:The relevant provisions of the demolition of the external wall scaffold:
The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range