RAP asphalt mixing plant,Reliable, advanced, safe heating, accurate weighing

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

The RAP plant works in accordance with such principle: Retired asphalt such as road pavement is reclaimed, then screened, heated, stored, weighed and then fed into mixer of asphalt mixing plant in accordance with product formula. It’s mixed with fresh raw material in the mixer to produce high quality asphalt mixture.

1. Brief introduction
The RAP plant works in accordance with such principle: Retired asphalt such as road pavement is reclaimed, then screened, heated, stored, weighed and then fed into mixer of asphalt mixing plant in accordance with product formula. It's mixed with fresh raw material in the mixer to produce high quality asphalt mixture. NFLG independently develops RLB series plant of intellectual property right adopts, European latest technology and adapting to actual exploitation conditions.

2. Characteristics
1) Reliable, advanced, safe heating, accurate weighing and intelligent control;
2) Unique heating way, preventing RAP for aging that may happen during heating process;
3) Smoke channel and material output are fitted with temperature monitor to ensure output material compliance and production safety;
4) Meeting and even surpassing national standard in terms of reclaimed material damage, blue fume emission and add-on pollution;
5) Percentage of reclaimed asphalt could be up to 50% in finished mixture; rivaling that of international first- class plant;

ModelCapacityWeighing tolerancePowerMaximum rate of recycled asphalt
StaticDynamicLB5000LB4000LB3000LB2000
RLB100060~80t/h±0.5%±2.5%156kw20%25%33%50%
RLB1750110~140t/h±0.5%±2.5%209kw35%40%54%78%
RLB2000120~160t/h±0.5%±2.5%225kw40%50%67%---
RLB2500150~200t/h±0.5%±2.5%276kw50%62.50%75%---

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How long is MOS school for a mechanic in the Marines? Heavy machinery?
In the 80's, most mechanic MOS training was self paced with a 6-8 week standard. It may be different now. The reason being, the Marines want to make sure you grasp what you are training for. If it takes a little more time for some it will be worth it to have a well trained devil dog.
Q:Why didn't the human race started with electrical-powered machinery?
It started out being much simpler and cheaper to use natural gas to power machinery, only now, when it is getting very rare, has it turned into such a cost. If you notice, people are trying to convert things into solar powered, milk powered, electrical powered, and corn powered to save Earth. But it is a very slow process, especially to break a 100 year habit. And when you think of all those machines, and factories, and everything that needs power all over the world, it'll take a very long time to convert.
Q:Do you know how to operate any machinery?
I worked in a machine factory for two years before I went into the Army
Q:all are true of the photosynthetic machinery of cyanobacteria except ?
b) it was assembled from two anaerobic systems that had originated in different types of bacteria
Q:what is the difference between ancillary and auxiliary machinery.?
This Site Might Help You. RE: what is the difference between ancillary and auxiliary machinery.? on the boardship these are the type of machinery found, what are their differences and examples.
Q:What human can create a planet or life itself? But why do humans have creations of designed machinery ?
Mankind is constantly trying to play catch-up with God's creation but can't admit it.
Q:What are the total cost of the project?
Direct costs include direct project costs (labor costs, material costs, construction machinery costs) and measures fee (environmental protection fees, civilized construction costs, safe construction fees, temporary facility fee, night construction fee, two handling fee, large machinery and equipment import and field installation, concrete reinforced concrete template and support fee scaffolding fee, finished project and equipment protection fees, construction fees) precipitation drainage.
Q:Your firm purchased machinery with a 7-year MACRS life for $10 million. ?
What formulas have you tried? It appears as though you are just trying to get everyone on here solve the finance problems for you!
Q:how to depreciate machinery by using weighted average?
It really depends on how you want it weighted. If you have the original value of your capital asset, your variable depreciation ratio based on the data for the weighted average, and the time period, it's really just a matter of calculation. Can you be more specific with your question?
Q:I want to sign up for a construction machinery rental company! What should I do? Steps? How much do you charge for a year?
Registered company general search process: (the administrative department for Industry and Commerce), bank (bank), capital verification (accounting firm) to apply for a business license (the administrative department for Industry and Commerce) to apply for organization code certificate (Department of quality and technical supervision) to apply for tax registration certificate (tax authorities)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range