• Rainforced Steel Concrete Purline Making Machine System 1
  • Rainforced Steel Concrete Purline Making Machine System 2
  • Rainforced Steel Concrete Purline Making Machine System 3
  • Rainforced Steel Concrete Purline Making Machine System 4
  • Rainforced Steel Concrete Purline Making Machine System 5
Rainforced Steel Concrete Purline Making Machine

Rainforced Steel Concrete Purline Making Machine

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
5 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Rainforced Steel Concrete Purline Making Machine


1.   Structure of Rainforced Steel Concrete Purline Making Machine:


Rainforced Steel Concrete Purline Making Machine is our special developed products as results of our engineers research, with which 60%steel material will be saved compared with traditional revolving die method .Efficiency can be improved 3 to 5 times compared with conical die method, these machine are easy for operation and convenient for maintenance, products from these machines are in good quality, smooth appearance and accurate in size.

 

 2.   Main Features of Rainforced Steel Concrete Purline Making Machine: 


• One machine can make one slab lower cost, high Wear-resistant, long service life.

• In case of quality problem the company provide free replacement.

• Provide technical support for free.

• Provide consumers with regular visits

• Simple structure, easy operate, less wear parts

 

3.  Rainforced Steel Concrete Purline Making Machine Images:

Rainforced Steel Concrete Purline Making Machine

Rainforced Steel Concrete Purline Making Machine

 

4.  Rainforced Steel Concrete Purline Making Machine Specification:

 

Product name

Type

Productivity

Hole number

Concrete purline  machine

60*120*140*

1.3-1.5m/min

4

Concrete purline  machine

60*130*150*4

1.3-1.5m/min

4

Concrete purline  machine

60*140*160*4

1.3-1.5m/min

4

Concrete purline  machine

70*150*170*2

1.3-1.5m/min

2

Concrete purline  machine

80*160*180*2

1.3-1.5m/min

2

Concrete purline  machine

60*110*130*4

1.3-1.5m/min

4

 

Model no.

No. of holes

Dia.

No. and dia. of wires

Electric motor power(kw)

Vibrator Motor Power(kw)

Total Power

(kw)

Max. span

Molding Speed(m/min)

Overall dimension

(mm)

Weight

(kg)

60X120X140X4

1

30

5/5

4

1.5

5.5

3.5

1.3-1.5

2250×900×850

1000

60X130X150X4

1

30

6/5

4

1.5

5.5

4

1.3-1.5

2250×900×850

1000

70X140X160X4

1

30

8/5

4

1.5

5.5

4.5

1.3-1.5

2250×900×850

1050

70X150X170X2

1

30

8/5

3

1.5

4.5

4.7

1.3-1.5

2250×900×850

750

60X110X130X4

1

30

6/5

4

1.5

5.5

3.5

1.3-1.5

2250×900×850

950


Production Line Layout


Rainforced Steel Concrete Purline Making Machine

 

Production Process 


Rebar tensioning

Rainforced Steel Concrete Purline Making Machine

Raw materials preparing

Rainforced Steel Concrete Purline Making Machine

Molding

Rainforced Steel Concrete Purline Making Machine

Certificates


Rainforced Steel Concrete Purline Making Machine


5. Customers from All Over The World

Rainforced Steel Concrete Purline Making Machine


6. FAQ: 


We have organized several common questions for our clients, may help you sincerely:

•  What information we need to confirm with you before send a formal offer?

What kind of slab you want to make, wall panel, roof panel, lintel or something else?

Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.

•  Have you use this kind of machine before? 

Our machine is totally different from European machine. Please don’t follow their instructions.

•  How long can we receive the product after purchase?

In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.

•  What kind of machine do you have?

Our main products: large span GLY concrete hollow core slab machine, light - weight wall panel machine, lintel machine, column machine, hollow core slab cutting machine, concrete feeding dumper, high-strength steel wire tensioning machine, which amount to more than the types and more than four hundred standards. We can provide the whole plan and technology supporting for concrete precast component. 

 

7. Why choose us:


•  30 years manufacturing experience.

•  Constitutor of the.

•  More than 10 patents.

•  Passed ISO9001:2000 quality system certificate.

• More than 10 types of machine and over 100 models for choose.

Supply complete set of technology and equipment solution.

• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.


8. Our Service:


•  We supply the technical supporting all the time.

•  We supply one year warranty for whole machine.

•  We supply free quick wear parts. 

•  We supply low charge continue maintenance when warranty is expired.

•  We supply free training to end-users

 

 


Q:2004Jan. 1 Paid $106,600 cash plus $6,400 in sales tax for a new machine. The machine is estimatedto have a six-year life and a $9,800 salvage value.Dec. 31 Recorded annual straight-line depreciation on the machinery.2005Dec. 31 Due to new information obtained earlier in the year, the machine’s estimated useful life waschanged from six to four years, and the estimated salvage value was increased to $13,050.Recorded annual straight-line depreciation on the machinery.2006Dec. 31 Recorded annual straight-line depreciation on the machinery.Dec. 31 Sold the machine for $25,240 cash.RequiredPrepare journal entries to record these transactions and events.
Jan. 1 Paid $106,600 cash plus $6,400 in sales tax for a new machine. The machine is estimated to have a six-year life and a $9,800 salvage value Dr Machinery $113,000 Cr Cash $113,000 Dec. 31 Recorded annual straight-line depreciation on the machinery Dr Depreciation expense $17,200 (i.e. [$113,000-$9,800]/6) Cr Accumulated depreciation $17,200 2005 Dec. 31 Due to new information obtained earlier in the year, the machine’s estimated useful life was changed from six to four years, and the estimated salvage value was increased to $13,050. Recorded annual straight-line depreciation on the machinery Dr Depn $27,583.33 Cr Accum. depn. $27,583.33 (Nbv of $95,800 - 13,050 divided by 3 remaining yrs) 2006 Dec. 31 Recorded annual straight-line depreciation on the machinery Dr Depn $27,583.33 Cr Accum. depn. $27,583.33 (Nbv is now $113,000 - $17,200 - $27,583.33 - $27,583.33 = $40,633.34) Dec. 31 Sold the machine for $25,240 cash Dr Cash $25,240 Dr Loss on disposal of machinery $15,393.34 Dr Accum. depn. $72,366.66 Cr Machinery $113,000
Q:What is the processing of materials?
It is related to the chemical composition, mechanical properties, thermal conductivity and work hardening degree of metal materials.
Q:Efficency , Cost-effective
PHARMACO okorder /
Q:Framework for oil well drilling machinery?
Derrick
Q:Why might the machinery of war, set in motion by the assassination of Archduke Ferdinand, have been difficul?
one major reason was the complex net of political and military alliances . the actual antagonists. Austria and Hungry drew in all of Europe Wilson and America wisely wanted to stay out the British tricked USA with the 'zimmerman telegram' and the sinking of the civilian ship the Lusitania, which was carrying forbidden military suppies ( ammunition) to Britain. About the same time a relevolution was taking place in Russia, communists were involved and the West was terrified of anything like communism. America actually sent troops to fight in Russia AFTER WW I.
Q:Like what are the major duties for a machinery repairman in the navy? My boyfriend is going to graduate soon from boot camp and is going to be a machinery repairmen. He didn't really get into details. But i just wanna know what do they do? What is their basic day as one? Do they have more sea or shore duty? And would anyone happen to know where he may be stationed?thank you very much!!!Have a good one!!!
Considering that every ship in the NAVY has machinery on it and that if it breaks down while at sea it has to be repaired and in some cases right then I would say that sea duty is in your future for most of your time in the navy. Shore duty for the Black Boot Rates is there but to get it you are usually a short timer or a lifer soon to get out.
Q:I am tired of politics and politicians and tired of liars with silky tongues merely seeking power and not in the best interests of the people.
Well then you can start by NOT voting for career politicians. Vote out ALL incumbents. You know, once upon a time, Congress was run by working Americans who got together part time to discuss the issues our nation faced. They were farmers, lawyers, businessmen, inventors, scientists, and visionaries who were elected by their peers to represent the average American. When the cheapest congressional seat requires a $250,000 advertising campaign, you know there's a problem.
Q:i want to buy from china
through the service you just like engage a agent in China to help you to find what you need in China.
Q:I sold $30,000 in business assets(machinery,equipment)this year, how would I claim that on my taxes. would it be considered quot;other incomequot; or quot;capital gainquot;?
I am sure you have depreciated those assets over the years since you put in service, so what you do is: You need dispose them, which means enter sale date, sale price, sales expenses (if you have any) and adjusted basis (cost - accumulated depreciation- current year's depreciation= usually computer does this calculation for you) then you will know if you have gain or loss. You need do this by accessing your depreciation worksheet for each asset. If you haven't depreciated them for over the years, you probably should report those on the Form 4797(not capital assets form Schedule D)- sale of business assets. OK?
Q:Royal Co. acquired new machinery with a list price of $700,000. At the date of Purchase they received a $7,000 cash discount and paid $2,000 of delivery charges. Installation and worker training costs were $46,000 and $14,000 respectively. During installation, worker negligence caused $15,000 damage to other machinery in the factory building. What is the acquisition cost for the machinery?I am unsure what to include, deduct or add in the calculation. Any help would be great!
Acquisition Cost Accounting

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords