Pre-stressed Hollow Core Slab Forming Machine

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
5 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Pre-stressed Hollow Core Slab Forming Machine

 

1.   Structure of Pre-stressed Hollow Core Slab Forming Machine:

 

Sheds Used Precast Concrete Slabs Making Machine works on the long-line table, using the high-strength low-relaxation steel strand as the guide, using the pushing work method to forming the concrete hollow-core slab. The slab have the advantages of smooth surface, high-density structure, capable of making construction slabs of 4.2m to 18m. The GLY series concrete hollow-core slab mainly used on the larger bay workshop, school, hospital, shopping mall, office building, bulk storage plant etc.

 

 2.   Main Features of Pre-stressed Hollow Core Slab Forming Machine: 

 

• One machine can make one slab lower cost, high Wear-resistant, long service life.

• In case of quality problem the company provide free replacement.

• Provide technical support for free.

• Provide consumers with regular visits

• Simple structure, easy operate, less wear parts

 

3.  Pre-stressed Hollow Core Slab Forming Machine Images:

Pre-stressed Hollow Core Slab Forming Machine

Pre-stressed Hollow Core Slab Forming Machine

Pre-stressed Hollow Core Slab Forming Machine

 

 

4.  Pre-stressed Hollow Core Slab Forming Machine Specification:

 

Type

Aperture & diameter

Number and diameter of wires

Max span

Total power

Productivity

(m/min)

Max. Load

(KN/m2)

Overall dimension

(mm)

Weight

(kg)

GLY180-1200

11/ peach

12/9.5or12.7

9

18.5

1.1-1.3

16.16

2900X1500x1200

3300

GLY200-1200

8 /peach

10/9.5or12.7

10

22

1.1-1.3

13.22

3700X1550X1550

5300

GLY250-1200

8/ peach

10/12.7

12.6

33

1.1-1.3

11.1

3700X1550X1500

6200

GLY300-1200

6 /peach

8/12.7

15

40

1.1-1.3

10.83

3700X1550X1500

6900

GLY380-1200

8 /rhomb

8/12.7

18

39.2

0.8-1.0

12.27

4600X1850X1600

7500

  

Production Process

 

Rebar tensioning

Pre-stressed Hollow Core Slab Forming Machine

 

Raw materials preparing

Pre-stressed Hollow Core Slab Forming Machine

Molding

Pre-stressed Hollow Core Slab Forming Machine 

 

5. Packing & Delivery

 

•  Wire cables are used for fastening the machine on the trailer or inside the container.

•  Machine covered with plastic film.

•  Machines can be packed in tarpaulin or wooden case according to customer’s needs.


Pre-stressed Hollow Core Slab Forming Machine

 

6. FAQ:

 

We have organized several common questions for our clients, may help you sincerely

•  What information we need to confirm with you before send a formal offer?

What kind of slab you want to make, wall panel, roof panel, lintel or something else?

Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.

•  How long can we receive the product after purchase?

In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.

•  What kind of machine do you have?

Our main products: large span GLY concrete hollow core slab machine, light - weight wall panel machine, lintel machine, column machine, hollow core slab cutting machine, concrete feeding dumper, high-strength steel wire tensioning machine, which amount to more than the types and more than four hundred standards. We can provide the whole plan and technology supporting for concrete precast component. 

 

7. Why choose us:

 

•  30 years manufacturing experience.

Constitutor of the

•  More than 10 patents.

•  Passed ISO9001:2000 quality system certificate.

• More than 10 types of machine and over 100 models for choose.

 Supply complete set of technology and equipment solution.

• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.

 

8. Our Service:

 

•  We supply the technical supporting all the time.

•  We supply one year warranty for whole machine.

•  We supply free quick wear parts. 

•  We supply low charge continue maintenance when warranty is expired.

•  We supply free training to end-users

 

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is machinery still being built?
yes it is
Q:What forces of production (technologies, machinery, modes of transportation are involved in mercantilism?
Nothing okorder.com/
Q:What is the consequences of this defective chromosome machinery?
B
Q:I sold $30,000 in business assets(machinery,equipment)this year, how would I claim that on my taxes.?
I am sure you have depreciated those assets over the years since you put in service, so what you do is: You need dispose them, which means enter sale date, sale price, sales expenses (if you have any) and adjusted basis (cost - accumulated depreciation- current year's depreciation= usually computer does this calculation for you) then you will know if you have gain or loss. You need do this by accessing your depreciation worksheet for each asset. If you haven't depreciated them for over the years, you probably should report those on the Form 4797(not capital assets form Schedule D)- sale of business assets. OK?
Q:What would happen if machinery is sold for less than book value?
Short answer, you have a book loss. Long answer, first we can make no tax assumptions here, not enough info. But for book value, I assume you mean the value on the books of whoever owned it before the sale. If you sell something for less than than the value on your books, you have a book loss. For instance, you bought a computer for $900, intending to keep it for 3 years. After the end of the first year, after a full year depreciation (straight line), the book value is $600. Let us say Dell comes out with something totally new and you want it. You buy it and want to get rid of your old one. But because of the new Dell almost everyone is buying, nobody really wants yours. You find someone to buy it for $200. Your book value was $600, you sold it for $200. You have a loss of $400. On your books is $900 debit to equipment and $300 credit to accumulated depreciation. So your entry to post the sale of your computer is this (Dr is debit, Cr is credit): Dr Cash $200 Dr Accumulated Depreciation $300 Dr Loss on Sale of Asset$400 Cr Computer $900 The entry balances.
Q:describe the ways in which bacterial machinery can be utilized to replicate mammalian genome?
NONE NON-EXISTENT WON'T
Q:Do Machinery Repairman (MR) in navy get assigned to subs?
Probably. Subs have a lot of machinedry in them.
Q:Payback: Quebec, Inc., is purchasing machinery at a cost of $3,768,966. The company expects, as a result, cash?
Plugging okorder.com/
Q:What is the functions of fluid mechanics in agricultural machinery?
Fluid okorder.com/
Q:Mechanical equipment (automation equipment) What is the composition of the material, is steel or iron or other?
Parts processed out and can not be finished, the most critical is the final heat treatment process. Including the entire part of the heat treatment and surface heat treatment.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range