QY16B.5,TUCK CRANE, More reliable quality

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

More excellent performance
• The optimizing layout of the machine makes the stress of the main bearing carriers more reasonable, and the lifting performance is higher than the products with the same tonnage.
• Apply the mature jib technique which integrates plug-in boom head, embedded boom block, and special telescoping mechanism, which makes the jib more stable and reliable.
• Optimize the stress design. Adopt the box-type outriggers which have larger span, stronger rigidity, and better stability.
More reliable quality
• Adopt the classic K series jib telescoping technique, working safer and more reliable.
• Make the most complete safety device system in the industry, ensuring the lifting safer and more reliable.
• The comprehensively upgraded brake system adopts double circuit air pressure design. Multiple systems ensure the brake safety of the truck during travel.
• The new power steering mechanism adopts hydraulic power design, which makes the steering light, flexible, and precise, and ensures the safety of the truck.
• The intensity and rigidity of the rotary table and frame structure with high rigidity are completely coordinated.
• The perfect integration of the design and structure realizes the automation of welding, which is more reliable.
Easier to operate
• The high efficient and energy efficient load sensing hydraulic system is sensitive to operate and precise to control, having good slight mobility.
• Optimize the control levers, which is easier to operate.
• The cab adopts orthodrome front windscreen, having wider operating views.
Easier to maintain
• The optimizing design of the pipeline traces makes the layout more scientific and reasonable, greatly reducing the dismantling and installing time of the pipelines and the maintenance expense.
• Completely upgrade the electrical system. Adopt anti-creep connector clips, greatly prolonging the service life of the parts.
• Adopt K series rope anti-disorder technique, improving the lifting efficiency, reducing the labor intensity, and prolonging the service life of the steel rope.
• The telescoping steel wire rope oriented and protective device avoids the steel wire rope out of the track and broken.
• Fully covered walking plate supplies a platform for the maintenance, and effectively protects the parts of the machine.
More energy-efficient and environmental friendly
• Adopt double industrial automation control engine, featuring strong power and energy efficiency.
• Under the economical mode, it can meet the engine power requirement of the normal lifting work. Under the high power mode, it can meet the requirement of the high challenge and high efficient lifting work.
• Adopt the high power radiator, avoiding the system from bad cooling, solving the problem of oil overheating, and prolonging the service life of the hydraulic oil.
• Adopt the advanced matching technique, which makes the design more scientific. It can reduce the consumption of the mechanism, prolong the service life of the machine, and has high residual value.

Dimension

Unit

QY16B.5 

Overall length

mm

12110

Overall width

mm

2500

Overall height

mm

3250

Weight

 

 

Total weight in travel

kg

24000

Front axle load

kg

6400

Rear axle load

kg

17600

Power

 

 

Engine model

 

WD415.21
SC8DK230Q3

Engine rated power

kW/(r/min)

155/2200、170/2200

Engine rated torque

N.m/(r/min)

820/1400
830/1400

Travel

 

 

Max. travel speed

km/h

75

Min. turning diameter

mm

20000

Min. ground clearance

mm

270

Approach angle

°

21

Departure angle

°

10

Max. grade ability

%

24

Fuel consumption for 100km

L

≤35

Main performance

 

 

Max. rated total lifting capacity

t

16

Min. rated working radius

m

3

Turning radius at turntable tail

m

3.14

Max. lifting torque

KN.m

720

Base boom

m

9.9

Fully extended boom

m

31.1

Fully extended boom+jib

m

39.4

Longitudinal outrigger span

m

4.6

Lateral outrigger span

m

5.4

Working speed

 

 

Boom luffing time

s

60

Boom full extension time

s

95

Max. swing speed

r/min

2.5

Main winch full load/no load (single rope)

m/min

54/100

Aux. winch full load/no load (single rope)

m/min

54/100

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the core technologies involved in the core components of construction machinery?
1, the core components of construction machinery core technology in which areas are possible, as long as we do not know the technology, only a few people know, and this technology is also a lot of applications, this is called the core technology.
Q:How to workout my pecs without machinery?
does a medicen ball count as machinery? becuase you can do really good accross body workouts with them :)
Q:Anyone have any tips on reading schematics for HVAC machinery? Or for wiring?
When working with schematics just remember that all electrical circuits have to have 5 components 1) a source ( ac or dc) 2) a load (maybe a lightbulb) 3) protection ( fuse or circuit breaker) 4) conductors (wires) 5) a switch. Once you know what all of your components are you shouldn't have any trouble following the lines on the schematic. As far as pay is concerned, it all depends on salaries in your state. I don't know what they are in MA. Try calling some electrical contractor in your area and do a salary survey with the. Hope this helps.
Q:Careers in the military that don't involve repairing or using large machinery?
There's JAG. the biggest piece of equipment you will use is a copier.
Q:On 1st January, 2000 a firm purchased machinery worth Rs.100,000.?
1.1.2000 Purchased machinery $100,000 Depreciation for 2000 $15,000 Nbv 31.12.2000 $85,000 Depreciation for 2001 $15,000 Nbv 31.12.2001 $70,000 1.9.2002 Purchased new machinery $30,000 Depreciation for 2002 $16,500 Nbv 31.12.2002 $83,500 Depreciation for 2003 $19,500 Nbv 31.12.2003 $64,000 Depreciation for 2004 $19,500 Nbv 31.12.2004 $44,500 Depreciation for 2005 $19,500 Nbv 31.12.2005 $25,000* *this nbv comprises $10,000 of the old machine and $15,000 of the new machine.
Q:why didnt worker like new machinery? how did factory owners solve the problems?
Because automation reduced the need for workers.
Q:machinery used for making apple and various juices and its machinery cost?
Big heavy squishing machines. They cost a lot.
Q:When did Tony Stark get the powers to control machinery with his mind?
its the way he made his suits. its not mind control its just that he is a genies.
Q:Is there any way to gain pecks without weights or machinery?
merely drink 1st Baron Beaverbrook grease... yet dont consume the 1st Baron Beaverbrook which will make you earnings weight everywhere else... oh, if its too warm to drink, you could look ahead to it to coach right into a paste and unfold it on your bagel
Q:what are the machinery, equipments used to extract jasmine absolute from jasmine flowers?
Jasmine okorder.com

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range