Premium Quality Cuplock Scaffolding System

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Cup-lock Scaffoldin

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings

      Place of Origin: China (Mainland)

      Scaffolding: Cup-lock scaffolding

      Quick lock scaffolding: Cup Lock Scaffolding for Sale


2.   Main Features of Cup-lock Scaffolding


.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Avoid using bolt in assembly and low down labor intensity

.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal


3.   Cup-lock Scaffolding Images 



 


 

4.   Cup-lock Scaffolding Specification

.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

.5 times fast of adapter plug assembly and disassembly than normal

.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage

 

Components:

 

Name

Size

Material

Tube size

Surface

Theoretic weight

Vertical Standard

1000mm

Q345 Steel or Q235 Steel

Φ48.3*3.2mm

Galvanized

4.97kg

1500mm

7.46kg

2000mm

9.94kg

2500mm

12.43kg

3000mm

14.91kg

 

1.   FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

    . Response will be carried out in 24hours  after receiving any complain or request.

    . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the horizontal spacing, vertical spacing and step distance of the vertical posts of the scaffold?
The design of the construction organization. Vertical rod spacing: the vertical spacing of the scaffolding pole, single row of scaffolding for the distance from the axis to the wallDistance: the distance between the upper and lower horizontal axis of the scaffold.That is the equivalent of a cube of length and width and height.
Q:Where can I get my scaffold pierced in Glasgow?
Nirvana, in Chisholm St i would never go anywhere else i got all mine there and both my teen daughters got theirs there as well first class, perfect hygiene, VERY experienced and lovely staff john christine, especially
Q:The contents of the inspection and evaluation of steel tubular scaffold with bowl buckle are as follows.
Disclosure and protection acceptance. General projects include: frame protection, material, load, channel. Option A, B error.
Q:why the scaffold nned to be inspected within the preceding seven(7) days?
To make sure that it is constructed properly and things haven';t slipped out
Q:i worked a week in hand for a scaffold company and got laid off 2 months later only got 1 weeks pay?
Well if after 2 weeks you still hadn't been paid, then you should of left and found another job. I did door work for Scottish power years ago - trying to gain new energy customers etc. They didn't pay me or my colleagues at all. Eventually 3 months later I got £350 out of them - Only after I wrote directly to the Chief executive (Rather handy that they accidentally sent me to his own home to try and sell him gas electricity hehehe). I wrote directly to his home and needless to say he took it upon himself personally to look into plus I also got a personal response.
Q:I am considering getting an ear scaffolding, and was wondering, is it girly???
i know tons of girls that have them!! i had one but it was pierced too close to the side and it was uncomfortable so i ended up taking it out. but i left the top hole and found some cute jewelry to go there!! it you want it.. go for it :D i love piercings!!
Q:Whom does Hester recognize in the crowd as she stands on the scaffold?
her husband, he has been in England while she was in America for a year or 2 can't remember; I think she thought he was dead or not coming cannot remember. It frightens her because she has a kid that cannot be his.
Q:What kind of scaffolding used in engineering construction
Scaffolding has a single floor, double row fastener type steel pipe scaffolding, full fastener type steel pipe scaffolding, steel cantilever fastener type steel pipe scaffolding, full fastener type steel pipe support, etc..
Q:Scaffolding Piercing swelling time?
Scaffold piercing is comparable to an commercial piercing...the term varies in distinctive international locations. in any case, how long it rather is swollen for rather varies from guy or woman to guy or woman. i might say i observed the swelling being thoroughly down after approximately 2 weeks. Ice it, take ibuprofen, and ensure you're actually not dozing on it or putting stress on it by potential of like using your telephone on that area.
Q:Industrial/Scaffolding piercing after pain?
That's normal! It'll be sore like that for a month or so.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range