Table Formwork with Easy Installation and Collection

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Structure of Table Formwork Description 

 

Table formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality. The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner. Timber beam formwork is a highly efficient and convenient system for medium area slab project. They can be transported to next position as whole table units whether by trolley or by crane lift.  

 

2. Main Features of Table Formwork

 

     -For any storey heights and slab thickness.

     -Fast in transportation and concrete casting due to pre-assmebled table unit.
     -Thus save more than a half time & labor cost compared with Slab Flex 20 formwork.
     -Can choose shoring props or towers according to different loadings and height.

 

3. Table Formwork Images

 

Table Formwork with Easy Installation and Collection

 

Table Formwork with Easy Installation and Collection

 

4. Table Formwork  Specifications

 

Vertical shifting of table formwork is considered simplified on site with the help of Transport fork by crane.

An optimum position of the table gravity point can be achieved by selecting the correct suspension points for the crane ropes and testing it on site by trail lifts.

The shifting trolley enables you to lower the table from the floor slightly and transport the table horizontally to the next location easily.

The maximum allowable loading capacity of the trolley is 15KN, the built-in pump of the trolley allows the adjustment with 1.5 meters

 

5. FAQ of  Table Formwork

   

1) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issue. 

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How can teachers use scaffolding?
You need to relate new class knowledge to old knowledge, and also make learning materials for new activities highly structured, and gradually less structured as you move through the topic.
Q:Industrial/ Scaffold Piercing?
Congrats on the new holes. I found with my industrial healed very fast (4-5 weeks). The sea salt and water works but I would recommend JJ antiseptic wash. Its pain free and has a little better germ killing ability. Also try not to sleep on that side for a while because sometimes the pressure will impede the healing. Good Luck.
Q:Industrial/Scaffold Piercings.?
Love them, but they hurt so bad to get pierced and to heal.
Q:can I claim compensation for falling of scaffolding and breaking my arm?
If you can prove that the company was responsible i.e. the scaffolding was not safe, then yes. If it is proved that you ignored instructions, signage preventing your access or training, then no. The company cannot be held responsible for your stupidity, if for example, you decided to climb over a guardrail rather than leave the scaffold at the proper access points. In this case, you would get nowhere with a claim. If the scaffold was missing guardrails where it should have them, then quite rightly the company in charge of the site on which the scaffold is erected is responsible.
Q:If the guillotine operator walked away from the scaffold where would he be headed?
Rolling down the aisles.
Q:¿which tragic dead is better in the scaffold to end my tragic story of the forbbiden lovers?
Definitely the stake. Consumed by love and all that. Good luck with your story!
Q:What is the difference between the bowl buckle scaffold and the fastener type steel pipe scaffold
The second is the external wall, the use of steel pipe scaffolding, such as structural decoration, which is divided into single and double scaffolding, double row with landing and cantilever. Single row are generally used for landing
Q:Bowl buckle scaffold steps can only be used in the number of meters 3
6 vertical protective scaffolding = natural floor to the top of the cross bar between the tower set up the actual length of the towerThe total amount of construction work of the comprehensive scaffold is calculated according to the total floor area of the building
Q:Do scaffold piercings hurt?
Yes. It like someone pinching you for a short period of time
Q:why did the minister visit the scaffold at night?
Because of the guilt he was suffering from, he decided to hold a vigil (a long period of staying awake) at the scaffold where Hester was chastised from their sin. He does this hopeful for a remedy of the pain he has endured.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range