High Strength Construction Scaffolding System Cuplock Scaffold

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Model Number:
HT-S / HT-SH
Material:
Q235
Pipe Size:
48x3mm(thickness)
Colour:
orange,Silver
Surface finish:
Painting,galvanized
Certificate:
ISO9001:2008
Package:
Bulk / Bundle / Pallet

Packaging & Delivery

Packaging Detail:In carton or in bag
Delivery Detail:25 days

Specifications

Cuplock Scaffolding
Material:Q235
Certificate:ISO9001:2008
H frame scaffolding
Suface:Painting,galvanized

MAIN FEATRE AND PURPOSE


*Shoring for construction and civil engineering


*Safety secured in vertical and horizontal load


*Trouble free height adjustment


*Easy assembly with light weight


*Versatility in civil engineering building construction purpose elsewhere


MODEL

FRAME PIPE

LENGTH

WEIGHT

HT-S1

48X3(TH)

1,000mm

7.40kg

HT-S2

1,500mm

9.12kg

HT-S3

2,000mm

13.02kg

HT-SH1

600mm

3.41kg

HT-SH2

900mm

4.44kg

HT-SH3

1,200mm

5.37kg

HT-SH4

1,800mm

7.23kg

HT-SH5

2,400mm

9.10kg

Why us!

Our product's quality is good and has the good after service.

Our products have good packing which can ensure the product is good .

If you wanna know more information pls visit our website

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do Scaffold peircings hurt...? D:?
I think i have a pretty high pain tolerance and i thought it hurt. It wasn't terrible but it still hurt. It also is really sore after but maybe take some advil or something before and hope that may help. Good luck
Q:Single double scaffolding distinctionPlease list the sketch map
Single row scaffolding -- only a row of pole, one end of a short bar on the wall. Use the scaffolding scaffolding double row scaffolding consisting of two rows from the outside pole and longitudinal and transverse horizontal bar (low grade can not add pictures). Double row scaffolding generally used for masonry masonry bearing to throwing cement brick. The single row scaffolding for internal wall plastering, paint brush, do not need the single row bearing engineering scaffold to pole support against the wall
Q:What are the advantages of rental scaffolding
2) assembly derrick; 3) the erection of ramps, sheds, and temporary structures stand 4) as the scaffold auxiliary reinforcing bar; erection requirements of steel fastener scaffolding should pay attention to the formation of a solid base plate and the base set by drainage measures to prevent water immersion on wall connecting rod set and load with the open type double scaffolding pole horizontal distance 1.05~1.55m masonry scaffolding step is like 1.20~1.35m or decorative masonry, decorative dual-purpose scaffolding like 1.80m pole vertical distance 1.2~2.0m which allows erection height of 34~50m single row set the pole horizontal distance 1.2~1.4 m pole vertical distance 1.5~2.0m allows erection height 24m longitudinal horizontal bar should be set inside the pole the degree for 3 span longitudinal rod with fastener fastener is connected with the lap fasteners should be staggered
Q:Can I remove scaffolding off my property?
mom says more rights than the neighbor since they are taking too long to finish its in your favor - it is your property not the contractors mom would make a comment like this to that rude contractor since you have left this scaffolding abandoned in my drive way for a month (whatever time) i am sure that when you return in the morning someone else will have removed it for me since your permission time has long expired and you have been repeatedly asked to remove it - so if you value your equipment investment it will be gone before supper tonight - AM I UNDERSTOOD !!! (that last part would be really loud and right in his face, probably with a finger poke in the chest) then when they don't remove it be prepared with wrenches and a pick up truck to remove it before their return in the morning - stashing it out of sight but on the property when they question you about the missing scaffolding you can offer to rent one to them that was abandoned in your driveway for $500.00 dollars a day (she would smile her prettiest smile when she said this) be prepared for a fuss - but they had their chance - stand your ground that's how mom rolls - she plays for keeps - not many cross her - when they do they quickly regret it - she would have it in small pieces in front of their eyes, but she suggests the first description for you - mom is tough but incredibly fair - the rules are the rules for a reason whether you like it or not, or anybody else for that matter
Q:¿which tragic dead is better in the scaffold to end my tragic story of the forbbiden lovers?
I think that Burning At the stake is good it might be better then the beheading bicause they are dying together unless you have 2 geatines in the story they wont die together
Q:Anyone have plans for building a DIY scaffold ?
2 eight foot ladders +1 extenision plank = 1 scaffold
Q:What is a bowl buckle scaffold? What is the full house scaffolding?
1, according to the relationship between the location of the building:1 external scaffolding: external scaffolding erected along the periphery of the building from the ground, both for masonry walls, but also for the construction of external decoration. The main form of focotex rod, frame type bridge, etc.. Focotex rod is the most widely used, the time frame. Minimum bridge application.
Q:Is it possible to have a scaffold piercing with a helix piercing on one ear?
of course. and yes.
Q:Bowl buckle scaffold from the machine to pull out the upper and lower bowl
Do not know if there is no other norms on the bowl, it is this.The values of the carrying capacity are like those provided by the manufacturer.
Q:Steel pipe scaffold scaffolding components which are composed of
Bowl buckle steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using the steel cross bar, for the "steel pipe based scaffold".2.2 according to the vertical and horizontal transmission force between the vertical and horizontal1) the frictional force acting on the contact surface. That is, the friction force at the contact surface of the joint is pressed to support the load of the cross bar and is transmitted to the vertical rod;2) welding force. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission. This method is more common in the horizontal bar placed in the top of the scaffolding;4) shear force of pin. That is to say, the connecting rod and the hole of the vertical rod are connected by the pin rod through the vertical connecting plate of the transverse rod to realize the double side shear action of the connecting rod and the pin rod. This method is rarely seen in the connection between the rod and the vertical rod.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range