Cup-lock System Scaffolding for Construction

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
100000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Cup-lock Scaffolding

1.High-rise residential, commercial buildings, industrial buildings.

2.As well as special factory supporting design, which includes the general viaduct bridge engineering, tunnel engineering, workshop, elevated water tower, power plants, refineries, etc.

3.Applicable to the flyover, span the scaffolding, storage shelves, chimney, water tower, indoor and outdoor decoration, large-scale concert stage, background frame, the stands, balcony, stair system, the party stage set-up, sports stadium and other engineering.


3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

.5 times fast of adapter plug assembly and disassembly than normal

.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage

 

5.   FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What's the story in March to the Scaffold?
This Site Might Help You. RE: What's the story in March to the Scaffold? All I know about the guy is that in the end, he doesn't get the girl he wanted and his head gets chopped off. Please don't give me critiques or anything like that. I just want the story. Thanks.
Q:How to calculate the quantity of steel pipe in the support system of the bowl buckle scaffold
To determine the spacing between the poles, but these are theoretical things
Q:Industrial/Scaffold Piercings.?
love them, when theyre done correctly. getting mine done soon.
Q:A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 190 N ?
If the scaffold weight is uniformly distributed, each rope will support one half of the weight. Left reaction = 95N Right reaction = 95N The 710N worker is standing closer to one end (assume left). Sum moments about the left end = 0 1m * 710N - 3.3m * Right reaction = 0 Right reaction = 710/3.3 = 215.2N Sum forces in Vertical direction = 0 Left reaction = 710 - 215.2 = 494.8N Sum all forces Left reaction = 95N + 494.8N = 589.8N larger tension force Right reaction = 95N + 215.2N = 310.2N smaller tension force
Q:Does getting scaffolding hurt?
It hurts like hell having it done but it's worth it. Depends if you got a high pain threshold though. I almost cried.
Q:In The Scarlet Letter what is a comparison and difference about the scaffold scene in chapter 1 and 12?
Hey!~ I'm reading that book too! I hate it though. The scaffold scene in Chapter 1 is Hester (and indirectly Pearl)'s public aknowledgement of the sin she committed. That was her way of doing penance and embracing and somehow accepting it. In Ch. 12, Dimmesdale decides to hold an all night vigil there as his way of acknowledging his sin, though not to the community, but to himself. It took him seven years to try and come to terms with his part in the adultery. This scaffold scene is made more signigicant by the fact that the letter A appears via a meteor and the fact that Dimmesdale feels it's directed especially to him. Hope this helps, though I don't know if it fully answers the question. Elaboration is definitely necessary.
Q:Scaffolding level net height, spacing
1) longitudinal horizontal rod overlap length should not be less than 1m, and fixed should meet the specification requirements;2) in addition to the top of the top of the top step, not the use of lap.3 body protection
Q:Where can I find 2nd hand/brand new H frames for scaffolds in Cebu?
while commuting in Cebu, look for on going construction in the surrounding. take time to get off and ask where they get their scaffoldings, they either fabricated, bought or rented it. from there you know where to start.
Q:How long does it take to put up scaffolding?
all depends how many guys are putting up the scaffold but I would say more than two hours
Q:Steel tube scaffolding construction labor time
And can be roughly divided as follows: 2.1 according to the material of the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold. 3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range