Pipe Cutters SQ-PC-703 cuts PVC.aluminium of plastic pipes

Ref Price:
$0.80 - 4.00 / pc
Loading Port:
Ningbo
Payment Terms:
TT or LC
Min Order Qty:
2000 pc
Supply Capability:
20000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

 Product characteristucs:cuts PVC.aluminium of plastic pipes . when cutting PVC flesible pipe you should revolve the pipe whilst compressing.
Scope of cut : rigid plastic pipes to a maximum diameter of 36mm 
INSTRUCTION OF USE :
1.  Part the handles to suit for cut angle.
2. Compress handles tightly until pipes is cut.
3. After cutting close the handles
ATTENTION:
When useing  this prouct in the winter it is advisable to put the pipe in lukewarm waterto head, thiswill avoid bust pipes due to cold making pipes fragile for cutting.
If sdge of the cutters,are showing signs of wear and tear.loosen the fixing screw,remove the blade and replace with same type of  pipe cutting blade.
After use we recommend rusproof oil is aplied to the cutter.

 

 

v

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the main materials in the building?
Portland cement in Europe is called Portland cement, because it is the color of the cement stone with water, and the color of limestone produced in Portland. China called it Portland cement, from the name can be learned, its main component is calcium silicate. Portland cement is the main raw material of limestone, clay and iron ore powder.
Q:What are the costs of the tools used to build the project?
The gadget can be counted in the "production tool utensil" fee for the cost of the enterprise management fee.
Q:Construction site, what software for three-dimensional modeling?
At present, the application of BIM is the initial stage in China. However, after the technology of the United States is mature, the BIM model is established. After the establishment of the model, the paper will have an intuitive expression. Help
Q:What construction machinery is needed at the construction site of the building?
Vibrator Mixer Reinforcement: Reinforcement Straightening Machine Bending Machine, Cutting Machine ... Many equipment should be prepared according to the specific project of the site. In fact, this is the equipment to improve the productivity, but also can not use this equipment, can be done manually, but increase The cost of labor is not cost-effective
Q:Hand-held power tools can wear gloves?
There are many types of hand-held electric tools, to be treated differently. Operation of rotating equipment is not allowed with gloves, to prevent gloves thread wound in the transfer to the site caused by injury accident. If it is not rotating hand-held power tools can wear gloves, such as insulated gloves can also play a protective role.
Q:What is the use of the pool area tool in 2013?
Select the existing room object, can be selected multiple times; please select the room area object : select the other room object to enter the exit option
Q:What software is needed in the construction industry?
Budget software, project budget software is the construction, decoration industry used to calculate the project cost (to do the project budget) tool software.
Q:What are the tools involved in building surveying?
3. Total station, that is, all-station electronic rangefinder (Electronic Total Station), is a set of light, machine, electricity as one of the high-tech measuring instruments, is set horizontal angle, vertical angle, distance (slope, Horizontal distance), high difference measurement function in one of the mapping instrument system.
Q:What are the commonly used equipment for construction of civil construction sites?
Civil buildings are made up of a number of interior spaces of varying sizes, and the formation of their space requires a variety of entities to be combined, and these entities are called building components. General civil construction by the foundation, wall or column, floor, floor, stairs, roof, doors and windows and other components.
Q:What are the testing tools for building construction quality control testing?
6, reel: plastic box structure, with nylon thread, pull out a total length of 15 meters, can detect the building body straight, such as brick wall plaster, skirting, etc. (with other detection tools are not easy to detect The flat part of the object). Detection, tighten the two ends of the thread, on the measured, visual observation contrast, after testing, with a winding handle clockwise rotation, the thread into the box, and then lock the buckle. 7, telescopic rod: two telescopic structure, extending out of the full length of 410 mm, the front end of the M16 bolts, can be installed wedge-shaped ruler, test mirror, hammer, etc., is a secondary detection tool.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range