Hydraulic Manual Pump or Foot Pump CP-700

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
1000 Piece/ pieces per month pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description  

Product  name

Hydraulic Manual Pump or Foot Pump CP-700

Min order

10 Piece/  Pieces

Capacity

10000  piece/ pieces per month

Technical Parameters  

Technical parameters
Pressure Ratingkgf/ c/psi700/10000

Low350
Pressure Rating
kgf/ c㎡)High10000

Low13
Oil amount of every minuteHigh2.3
Reservoir Capacitycc900
Sizemm510×140×150
Weightkg10
TypeHand



Packaging & Shipping

Delivery  time

15~20 days  after deposit

Export  market

Asia,  America, Europe, Africa, markets.


Our Services

1.    Reliable Supplier

2.   High  Quality

3.   Standard  Producing Technology

4.   Competitive  Factory Price

5.   Fast  Delivery

Product Picture:


Function description:

1, The pumphas two section types: High and Low,   Output of oil is quick and the operation isconvenient even without power, the function issame as electric type under any work pressure,

2, Manual operation, the length of tube is as request, with quick joint, and can also add a pressure gauge (optional)

3, Pressure cankeep and stop at the middle, because of a internal highpressure safety protection hydraulic valve.

4, Pipe joints withPT3/8 "teeth


match with:




Other more Crimper:









Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What tools do students need in architecture?
Plate: must buy one of the big board, third after the purchase of 0, and early to buy no, the other words art school to buy Zhang No. 2
Q:What are the building hardware tools?
Air jaws, air pumps, pull nail guns, nail guns, welding guns, fushers, perforators, hydraulic pliers, hydraulic cutters, cutting machines, hand wheel, bench drill, portable drill
Q:What are the costs of the tools used to build the project?
In order to continuously and systematically and comprehensively account for and monitor the changes of accounting elements caused by economic activities, it is necessary to scientifically classify the specific contents of the accounting objects according to their different characteristics and economic management requirements and determine in advance Classification of the project name, the provisions of its accounting content. This kind of accounting elements of the specific content of the classification of the project, known as the accounting subjects.
Q:Construction site, what software for three-dimensional modeling?
Previous 3D models were built using 3Dmax, but BIM applications were gradually applied by construction companies
Q:What are the commonly used force analysis software in the construction industry?
Architectural Design Tool Four: Hungarian Graphisoft's ArchiCAD, Europe's wider application of three-dimensional architectural design software, set 3D modeling display, solutions and construction drawings in one, but due to the support of the Chinese standard specification, structure, professional computing and Construction plans are also difficult to apply; Case: the world's tallest residential buildings - Eureka Tower contains pictures:
Q:Construction safety supplies are what
2, procurement, leasing, transformation, retirement plan and implementation. 3, construction enterprises should be based on enterprise safety technology management system, the construction facilities, equipment, labor protection supplies and related safety testing equipment to implement technical management, regular analysis of the safety status, to determine the guidance, inspection focus, to take the necessary improvement measures. 4, safety protection facilities should be standardized, stereotypes, tools.
Q:What are the three major tools in construction?
General terms of the construction industry, refers to the construction site used in the external walls, interior decoration or high height can not be directly the construction site. Mainly for the construction staff to work up and down or external safety net enclosure and high-altitude installation components, said white is the shelf
Q:What tools are required for building hand-painted?
The main hand-painted performance tools are: micro pen (very fast) color lead (fast) pen or signature pen (fast) charcoal (medium speed) watercolor (slow) water powder (slow), watercolor and water powder need the corresponding watercolor pen, water Chalk, brush, color box, rinse pen and other auxiliary equipment
Q:What is the use of the pool area tool in 2013?
Select the existing room object, can be selected multiple times; please select the room area object : select the other room object to enter the exit option
Q:What are the tools for the inspection of process engineering in construction projects?
8 reel 65 × 65 × 20 line length 15m 9 telescopic rod 250 × 16 × 10 extension length 410 10 welding detection ruler 250 × 50 × 2.5 11 hydropower test hammer 50g 3g 12 ring drum hammer 25g 2g 13 steel needle hammer 10g 1g 14 active hammer 25g 2g

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range