Passenger Building Hoist CE Certified with Load 2t and 4t

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Power Source: Electric Maximum Lifting Weight: 2000 Maximum Lifting Height(M): 200
Lift Speed: 40

Product Description:


Construction Passenger Building Hoist  CE Certified with Load 2t and 4t

We are special supplier of building hoist in China, our building hoist have been Widely exported to all over the world and won good reputation, whose payload capacity is as much as 10000kg, lifting speed can reach up to 96m/min, and the erection height reaches up to 550m., our products have been widely used for transportation for both men and cargo in field of general buildings, but also industry, electric power, mining well, oil, chemical industry etc.
SC270TD, SC270/270TD building hoist:
1). Each cage load capacity: 2700kg
2). Lifting speed: 36m/min, or 0∼ 63m/min, or 0∼ 96m/min
3). Mast section: Paint or hot dipping zinc
4). Cage: Single cage or twin cage
5). Recommended cage inner dimension(LxWxH)(m): 2.5x1.3 x2.5; 3.0x1.3x2.5; 3.2x1.5x2.5; 3.6x1.5x2.5; 3.8x1.5x2.5; 4.0x1.5x2.5; 4.2x1.5x2.5, cage dimension is according to requirement of customer and special project.
6). Motor and reducing device: Made in China, can be SEW Germany according to requirements.
7). Counterweight: With counterweight or without counterweight
8). The colors of cage: Yellow, or red, or blue
9). Other each cage load capacity for your to choose: 1000kg, 2000kg, 2700kg, or 3200kg




Type
 
Payload kg
 
Lifting speed m/min
 
Motor power kW
 
Inverter power kW
 
Counter Weight kg
 
Low speed
 
Single cage no counterweight
 
SC200GD
 
2000
 
0~46
 
3×15
 
45
 
0
 
SC270GD
 
2700
 
0~46
 
3×18.5
 
55
 
0
 
SC320GD
 
3200
 
0~46
 
3×22
 
75
 
0
 
Twin cage no counterweight
 
SC200/200GD
 
2×2000
 
0~46
 
2×3×15
 
2×45
 
0
 
SC270/270GD
 
2×2700
 
0~46
 
2×3×18.5
 
2×55
 
0
 
SC320/320GD
 
2×3200 
 
0~46
 
2×3×22
 
2×75
 
0
 
Middle speed
 
Single cage no counterweight
 
SC120GZ
 
1200
 
0~63
 
3×15
 
45
 
0
 
SC200GZ
 
2000
 
0~63
 
3×18.5
 
55
 
0
 
Single cage with counterweight
 
SCD200GZ
 
2000
 
0~63
 
2×15
 
30
 
2000
 
SCD270GZ
 
2700
 
0~63
 
2×18.5
 
37
 
2000
 
SCD320GZ
 
3200
 
0~63
 
3×15
 
45
 
2000
 
Twin cage no counterweight
 
SC120/120GZ
 
2×1200
 
0~63
 
2×3×15
 
2×45
 
0
 
SC200/200GZ
 
2×2000
 
0~63
 
2×3×18.5
 
2×55
 
0
 
Twin cage with counterweight
 
SCD200/200GZ
 
2×2000
 
0~63
 
2×15
 
2×30
 
2×2000
 
SCD270/270GZ
 
2×2700
 
0~63
 
2×18.5
 
2×37
 
2×2000
 
SCD320/320GZ
 
2×3200
 
0~63
 
2×3×15
 
2×45
 
2×2000
 
High speed
 
Single cage no counterweight
 
SC100GS
 
1000
 
0~96
 
3×22
 
75
 
0
 
SC120GS
 
1200
 
0~96
 
3×22
 
75
 
0
 
SC200G
 
2000
 
0~96
 
3×22
 
90
 
0
 
SC200GS
 
2000
 
0~96
 
3×22
 
90
 
0
 
Single cage with counterweight
 
SCD200G
 
2000
 
0~96
 
3×15
 
45
 
2000
 
SCD200GS
 
2000
 
0~96
 
2×22
 
45
 
2000
 
SCD270G
 
2700
 
0~96
 
3×18.5
 
55
 
2000
 
SCD320GS
 
3200
 
0~96
 
3×22
 
75
 
2000
 
Twin cage no counterweight
 
SC100/100GS
 
2×1000
 
0~96
 
2×3×22
 
2×75
 
0
 
SC120/120GS/
 
2×1200
 
0~96
 
2×3×22
 
2×75
 
0
 
SC200/200G
 
2×2000
 
0~96
 
2×3×22
 
2×90
 
0
 
SC200/200GS
 
2×2000
 
0~96
 
2×3×22
 
2×90
 
0
 
Twin cage with counterweight
 
SCD200/200G
 
2×2000
 
0~96
 
2×3×15
 
2×45
 
2×2000
 
SCD200/200GS
 
2×2000
 
0~96
 
2×2×22
 
2×45
 
2×2000
 
SCD270/270G
 
2×2700
 
0~96
 
2×3×18.5
 
2×55
 
2×2000
 
SCD320/320G
 
2×3200
 
0~96
 
2×3×22
 
2×75
 
2×2000
 
SCD320/320GS
 
2×3200
 
0~96
 
2×3×22
 
2×75
 
2×2000
 

Passenger Building Hoist  CE Certified with Load 2t and 4t

Passenger Building Hoist  CE Certified with Load 2t and 4t

Passenger Building Hoist  CE Certified with Load 2t and 4t

Passenger Building Hoist  CE Certified with Load 2t and 4t







Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What about the energy efficiency of the escalator
Variable frequency construction elevator energy saving effect general. Frequency conversion is not energy efficient. The difference between the frequency and the common machine is the smoothness and speed of the operation. Frequency conversion speeds up to 90m / 1 minutes and the average is only 35m / 1 min Frequency conversion when parking is slow down and stop Ordinary is directly stop delay parking and adjustment made door light who bow Angle decyl with brush spring connection will be better. The frequency conversion requires the site voltage to be strictly a little bit looser than the voltage requirement Energy consumption is: according to the elevator drive mechanism for general three transmission two kinds of the elevator are three 11 kw motor, that their energy consumption are 3 x 11 = 33 kw is hours each hanging basket consumes electricity 33 degrees, the actual power consumption will be bigger.
Q:Where is the location of the elevator in the project
Hard to answer, I think should combine the construction plan, adjacent to roadway facilitate material transport, and combining with the construction progress, do not put in sample area, in addition to combined with the construction interface classification and so on into consideration, to say.
Q:How many floors are built to use the construction elevator? With six floors?
The construction elevator, the average layer height above 12 floors need to be used, the hoist machine is not to go up to use the construction elevator to send a person to carry a few light things upstairs.
Q:When building tall buildings, the machine that USES to lift concrete to wait for tall building
It should be the ground pump, the center is the tower crane, the construction face is the concrete pump of the cloth machine to the construction method. The advanced cloth machine is the arm bracket of the pump car, can operate with the remote control, is as convenient as the pump car.
Q:Is the construction elevator the same as the construction elevator
Construction lifter is a kind of vertical lifting equipment standard name, generally refers to the SC model of the single or double hoisting cage hoisting cage, driven by gear and rack, (in recent years, there are many strands of wire rope drive), equipped with "" for safety device, can people goods with multiplication. The construction elevator is called a popular term, and the common site is called a rack elevator and a human cargo elevator, which means the same thing. Because this kind of product applies only to the construction site, it is very different from the common guest elevator. There are two other types of products that are common to this type of product, such as the SS single-column double cage (wire rope drive), which is called the material lift machine, which cannot be multiplied by people. There is also the WJ series double column single-cage (wire rope drive), which is called the dragon door frame, which is also not allowed to be passenger. Strictly speaking, the latter two kinds can't be called construction elevator, can be called so-and-so elevator. Above is a person's humble opinion, if be in and out, still hope the expert is correct!
Q:Can construction elevators be taken by people or by goods
According to GB 26557-2011, "a vertical guide for people with vertical navigation". 5.6 lift cage 5.6.1 general When the maximum number of passengers can be carried, the maximum amount of the ceiling shall be calculated according to the area of 0.2 square meters per person, and the weight should be calculated at 75 kg per person.
Q:What is the main function of elevator motherboard?
A control system includes light, machine, electric, calculate, calculate the mainboard is mainly responsible for, the equivalent of the human brain, it gathers the elevator running status, corresponding analog signal output, control of elevator running properly and safely.
Q:Whether the construction elevator is a dual-purpose elevator
The construction elevator is being operated on; And a person's elevator is automatically controlled; The construction elevator is directed by the rack, which is seen in the rack, and the noise is large. The escalator is not a rack, it is usually guided, and the rails are invisible. Construction elevators are rudimentary; And the elevator is complicated.
Q:The maximum allowable deviation of the vertical is the vertical degree when the construction elevator is installed
The maximum allowable deviation for the installation of the elevator rail frame is the following: The height of the elevator rail is less than 70 meters, and the vertical deviation should not be greater than one thousandth of the height of the guide frame. 2, the guide frame height is greater than 70 meters is less than or equal to 100 meters, the deviation is less than or equal to 70 mm. 3, the guide frame is larger than 100 meters is less than 150 meters, the deviation is less than or equal to 90 mm. 4, the guide frame is larger than 150 meters is less than or equal to 200 meters. The deviation is less than or equal to 110 mm. The guide frame is greater than 200 meters and the deviation is less than 130 mm.
Q:The construction elevator should have those procedures
Construction elevator installation unit must have issued by the construction administration department of lifting equipment installation project specialized contracting qualification and construction enterprise safety production license, and within the scope of the qualification licensing business engaged in the installation of construction lifter removed.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range