• Light Weight Steel Scaffolding Material with Removable Wheels and Ladders System 1
  • Light Weight Steel Scaffolding Material with Removable Wheels and Ladders System 2
Light Weight Steel Scaffolding Material with Removable Wheels and Ladders

Light Weight Steel Scaffolding Material with Removable Wheels and Ladders

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Light Weight Steel Scaffolding Material with Removable Wheels and Ladders

Packaging & Delivery

Packaging Detail:in bulk or as customer's requirment
Delivery Detail:15-30 days after receive the deposit


Specifications

1.steel tube: OD42&47mm

2.matrerial: Q235

3.surface:  painted or galvanize


Picture:


Light Weight Steel Scaffolding Material with Removable Wheels and Ladders


Light Weight Steel Scaffolding Material with Removable Wheels and Ladders

Light Weight Steel Scaffolding Material with Removable Wheels and Ladders

Light Weight Steel Scaffolding Material with Removable Wheels and Ladders


F&Q

1)How about your company?

We, CNBM International Corporation (China National Building Materials Corporation), is one of the largest companies in China building material & equipment industry, Our formwork and scaffolding are largely used in both domestic and all over world; We has over 10 year experience in scaffolding industry.

2)Can we provide different size of Frame system Scaffolding as customer need?

The answer is Yes, customer can provide the Tec spec to us and Drawing for production.

3)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Foot plate:(1) scaffold with welded steel sheet with 18# wire fence, bundled in the bar.(2) steel bar appear off, the serious corrosion of the prohibition of the use of.(3) the wire binding must use 18# wire binding, and each steel bar binding plate must be above 4
Q:Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
Q:how long should i leave it before i change it, should i do it myself or go to the piercer to they can do it?and is it still normal for the pericing to hurt after quite a while of having it done?
Hi :) You can change it after 4 months usually But sometimes it can take up to a year It depends on the person , everybody's body heals differently You should go back to your piercer and ask if it's healed enough to change the jewellery Yep , it's normal A scaffold piercing goes through the cartilage and cartilage piercings can take up to a year to fully heal :)
Q:i have my nose pierced and am thinking about getting a scaffold cartilage piercing, but am affraid because your cartilage is so tough! and i know it depends on the person when it comes to pain, but just compairing it to a nose piercing? (when i got my nose pierced i cried, but once they finished piercing it, i wasn't in anymore pain)
ive just had scaffolding done, and it was quite painful, far more painful than i was told. they just stab through your ear with a needle, but i didn't think it was that bad. not as bad as getting your nose done. but it was very sore and painful to touch for days after. hope this helps :) X
Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q:Scaffolding installation and precautions?
When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
some times ppl die because of neglect and lack of mentainance so some have take responsobility for this
Q:Introduction of external scaffolding
1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.
Q:Bowl buckle type steel pipe scaffolding should set up a few people
The utility model relates to a bowl buckle joint which is composed of an upper bowl buckle, a lower bowl buckle, a cross bar joint and a limit pin on the upper bowl buckle. A limiting pin is arranged on the vertical rod to weld the lower bowl buckle and the upper bowl buckle. Welding plug on the bar and the diagonal bar. When the utility model is assembled, the transverse rod and the inclined rod are inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated.
Q:According to the standard set up double scaffolding scaffolding to the number of meters per square meter
Once the calculation is qualified, you can according to the vertical distance

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords