Hot Selling Labour Bed Heavy Duty Bunk Bed CMAX-A04 From Fortune Global 500 Company

Ref Price:
Loading Port:
Xiamen
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
30000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Specifications:

1. Material: steel tubes, main tubes with 50*0.8mm,25*50*0.75mm

2. Size: 2000*900*1720mm

3. Finish: powder coating

4. Packing: by plastic bags

5. Loadability: 245sets/40HQ

 

Feature:

1) Competitive price

2) attractive design

3) comfortable, elegant and durable

4) easy to assemble and maintain

5) OEM service is offered

6) Models can be customized

7) Punctual delivery

 

 

 

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What kind of material is not easy to mold the wardrobe?
Paint has the function of damp proof and mildew proof. So, when buying, be sure to pay attention to paint. In addition, the wardrobe must be far away from the outdoor window. Outdoor moisture relative to indoor weight. I hope this one will be useful to you.
Q:What is the size of the top cabinet in the wardrobe? How big is the size of the hanging clothes
Shirt class about 900-950mm, long clothes about 1400mm, as far as the top cabinet ~! Mainly to see the total height of the wardrobe ~!
Q:What is the projected area?
With the developed area to calculate the total price calculation method of wardrobe, more complex, each face involved have to be calculated, a small plate in the closet must calculate the area, but if the same side used two pieces of plates, two plates must be calculated separately according to the area; if the projection area calculation and the calculation method is much more simple.
Q:What is the design size of an open closet?
The whole wardrobe depth, the depth of the whole wardrobe is generally between 550-600mm, remove the backboard and the wardrobe closet door, the whole wardrobe depth is between 530-580mm, the depth is more suitable for hanging clothes, not because of the shallow depth caused by her clothing. Hanging clothes space will not feel too narrow.
Q:How about the square meters of the wardrobe?My wardrobe is 1.6 meters high, *0.6 meters deep, how many square meters does it count?
If you want to know the actual area, only by adding a block of board area, you will purchase at the time of the purchase will be quoted to you, the quotation also written on each board of the detailed area and the total price
Q:What's the best way to mold the wardrobe?
Remove mildew from clothesThe smell of the clothes closet a musty, you can add two teaspoons of vinegar and half a bag of milk in a tub of water, put the clothes in the washing water soaked this specially formulated for 10 minutes, let the vinegar and milk adsorption on the clothes of musty, then dash, washed, rubbing the left and right rub, finally the use of water for washing clean, no smell.If you are in a hurry to go out, there is no time to use this method to remove mildew, you can also try the hair dryer to mildew:Hang up your clothes, leave the hair dryer in the cold air, blow the clothes for 10~15 minutes, let the wind take away the musty smell of the clothes, and then you can put it on the door safely.
Q:How to Shierju wardrobe quality?
Look at the surface treatment of plates, and now the market more melamine board, this plate is not only wear-resistant, resistant to scratch, and the finish is very beautiful, many manufacturers use the most! In addition, there are the United States, Australia, wardrobe and other manufacturers in the use of wire drawing relief plate, this plate also has the advantages of the above!
Q:What is the process flow of the wardrobe?
The main components of the panel process include raw materials, process documentation, machinery, equipment, operators, and quality and production management systems. Time and place where raw materials are the premise and basis for the entire process, while the process files is the whole process and management activities according to a comprehensive and detailed process documents, process documents about the whole wardrobe renderings, three views, parts decomposition diagram, parts processing drawings, hardware accessories, packaging solutions, list installation diagram, raw material list (BOM), manual parts processing process, products. Among them, parts processing drawings should be used in conjunction with the parts processing flow chart and run simultaneously with the parts and components of the production line. The effect is the best. The main contents of the parts processing flow sheet should cover the name, specifications, quantity, materials, batch, processing notes, special inspection standards, hours, procedures and serial numbers and other basic content. Machining equipment and operators are processing guarantees.
Q:What is the difference between a custom-made wardrobe and a carpenter's wardrobe?
Carpentry wardrobe: the use of space is very large, especially for the special shape (Xie Po) processing advantages are obvious.The whole wardrobe: a lot of people think the whole wardrobe space rate is very small, in fact this somewhat biased, in addition to the slope, the whole wardrobe on the beam column is quite perfect, usually designed according to the actual situation, is not affected.
Q:How to wet the wardrobe?
Home common sense moistureproof three plate ax intermittent ventilation: afternoon is the best time, rainy days to the South or southeast of the doors and windows closed to reduce water vapor into the room. At noon, the outside air humidity in the highest value, should not open the window, should be in the afternoon or evening, when the climate is relatively dry, open the window to adjust the indoor air. Lime damp: rainy days can be wrapped in cloth or gunny bags, placed in the room after the lime, so that the indoor air dry. Air conditioning dehumidification: than the previous two methods are simple, but now in power shortage season, recommend using other methods to save energy environmental moisture.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range