Formwork Scaffolding Accessories Wing Nut

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

Forged Formwork Accessories Wing Nut
1)Raw Material: C45
2) Dimensions: 70mm,110mm,130mm
3) Surface: Electroplate

Formwork Scaffolding Accessories Forged Wing Nut

1)Raw Material: C45
2) Dimensions: 70mm,90mm,100mm,120mm,130mm,150mm
3) Surface: Electro galvanized, Hot dip galvanized

Item

Forged Wing Nut

Material

C45

Dimensions

Dia 17mm,70mm,100mm,130mm,150mm

Surface

Hot-dip galvanization, electro galvanization

Standard

EN74

Note

OEM service is available

MOQ

1000pieces

Package

in steel pallet ,carton, plywood case, or as your request  

Payment Terms

TT,L/C, we can contact in detail

Delivery Time

20-30days



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.
Q:Want to rent the scaffolding in the county, you need to cast how much money
Look what you want to do. Store rent is not.
Q:What are the requirements for the construction of the scaffold eye in the building?
SelectionThe project uses 48 mm, 3.5mm wall thickness steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, etc.. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness of steel pipe and the corresponding fasteners, mainly with 1 x 1.0m, 1.2 x 1.2m, 1.5 x 1.5m and other specifications. Foot board mainly 2M and 3M two.
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Earthwork:The pile cap is shallow, the foundation beam and sand filling quantity is less, the depth is to the outdoor floor 1.5m, so the earthwork construction adopts the mechanical leveling site construction scheme. Backfill soil must be layered compaction, density of not less than 0.9. Construction lap should be compact, interval time should not be too long, in case of rain water, the construction of various types of pipe should be synchronized with the foundation construction.
Q:In the construction of steel pipe scaffolding steel pipe and steel stamping fastener usage ratio is how much?
Generally 200 tons of steel pipe with fasteners, and fasteners are generally divided into three kinds: right angle fasteners, connecting fasteners, rotating fasteners
Q:When scaffolding is erected on the base of the permanent structural concrete
5.2.5 scaffolding engineering A. structural parts (1) structural parts selection and calculation basis
Q:What Music Video did Garth Brooks Run Around Crazy on Stage, Suspend from The air and Climb the Scaffolding?
aint goin down till the sun comes up
Q:What is the mobile scaffolding materials
The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized
Q:Bracket cast in situ beam bracket must use bowl buckle scaffold
5.2.5, the calculation of the column, a clear calculation of the type of stud.6.2.4, clear the structure of fastener type column.Local documents, it is not possible to regulate, do not allow the use of fastener type scaffolding. But the top of the column, to use the provisions of backwater, specification.
Q:industrial/scaffold piercing question?
id leave it. theyre hard to heal nyway,and the added pressure of the helmet and the sweat and the possibility of getting hit in the head and knocking the piercing....well, i wouldnt risk it

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range