Easy to Install and Low Labor Cost WPC Door Frame

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
8 m.t.
Supply Capability:
200 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1> What is WPC?

 

WPC, simply for wood plastic composite.

Wood Plastic Composite is made from a unique combination of plant fiber and recycled plastic

according to high-tech formula.

It offers the best advantages of plastic and wood. The plastic shields the wood from moisture and

insect damage, and the wood protects the plastic from UV damage and gives you a natural feel.

It has characteristics of high strength and rigidity, acid and alkali resistance, corrosion resistant

and without formaldehyde, it is a real green environment protection building material.

 

2> Why choose WPC decking?

 

 Natural colour
 Resistance to water, rot and crack
 Guaranteed to last
 Low maintenance
 Beautiful and broad range of finish

 

3> What are the main kinds of WPC currently?

Door frame

Wall panel

Skirting

Wardrobe door panel

 

 

 

Product Description

 

 

 

4> Specification of WPC?

 

Characteristics

WPC

Wood

Moisture Resistance

Waterproof

Water absorptive

Rot Resistance

Antisepsis

Rot except special treating

Split Resistance

No Cracked

Cracked by weathering effect

Distortion Resistance

Almost no Contraction/expansion

Distorting effected by chang of 

moisture and temperature

UV Resistance

High Grade UV Resistance

Easily effected by UV

Fading Resistance

Almost no

Easy to fade

Outdoor adaptability

Great

Only few of treatedowood adaptive

No need painting

No need

Need paint periodically

Durable/longevity

> 8-15 years

< 3 years< span="">

Various Configuration

Extruded via various mould

simplex

Environment Effect

Recyclable 100%

Consume woods

 

 

 

 made in china best selling wpc door frame

 

 

 

Company Information

 

 

 

5> About CNBM and It’s WPC products

 

China National Building Material Corporation (CNBM), long history since 1984 is one of the top 
fortune 500 corporation and central enterprise with total assets of more than $20 billion and 
120,000 staff. 
 Our unique advantages: 
 Preferential payment terms 
 good and reasonable price 
 quality guarantee -- CNBM won't let a single small deal ruin our reputation and brand, so quality is

 our lifetime. 
 professional team for CRM order processing & QA & logistics 
 global logistic database, originated from Dubai

 

 

 

 

 

Packaging & Shipping

 

 

 

6> How to buy and concerned terms


MOQ – 800m per item 
Lead time—2 weeks 
Departure port—Shanghai 
Package-- PE film, carton box or 2pcs.bundle, treated pallet

 

7> Certificates and Quality guarantee

Certificates – CE&ISO 9001 complied 
Warranty—10 years 
Quality guarantee—test report for each order under the strict management system

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do I install windows?
The box, the air slot, the bottom of the assembly is good, and then use six screws to twist it into a square box. The screen on the installation site, pay attention to the left and right wind and the door frame frame to the left and right symmetry, bottom position from the door frame frame to be about 5cm below, put the left and right with the clip to live, so that can not move. With drill with 3.2mm drill bit in the door window frame inside the puncture. According to the need in the left and right air groove and below the bottom of the corresponding place marked 6 to 14 eyes, and then screw the screw is installed.
Q:What are the steps behind the construction of the building after the closure?
1, parapet masonry, stucco 2, the roof to find slope 3, roof leveling layer 4, roof waterproof 5, waterproof protective layer
Q:The construction method of wall tiles
Q:Paving mosaic construction process
Double gull nostalgic mosaic can be used for indoor and outdoor floor and wall decoration. For construction paving, the most critical job is to prepare the surface of the site. Tiles must be in the horizontal and vertical angle are accurate and accurate paving, so as to avoid problems. Paving the surface must be clean and dry. Paving materials: the market has a professional mosaic tile adhesive and sealing agent, there are two-in-one tile glue. Color is also a variety of points, according to different needs with the use of cement and sealant. The most widely used is white and black. Paving tools: grouting floating, large bucket, V-shovel, hammer, small bucket, pliers. Paving steps: 1. In the vat inside the mixed powder-like mosaic tile glue, stirring at the same time by adding water until peanut butter to achieve similar viscosity. 2. In the construction of the wall, then use the v-type shovel. Each post a paste From the middle of the patch area to start paving out. In the wall with the horizontal line and the vertical line for the mark, you can make the gap between each paste evenly. Hand the appropriate force to the mosaic into the tiles inside, so that mosaic and ceramic tile full contact. 3. Paste finished or close the mosaic, you need to paste a paste on the match mosaic. With a piece of wood and a hammer, gently tapping to adjust the position of the mosaic. Need to pay special attention to the edge and connection of each mosaic. 4. If necessary, adjust the mosaic position in time before the mud is dry. 5. Allow the mud to have a 24 hour posture before filling. 6. Dry the sealant for 10-20 minutes, then gently wipe the mosaic surface with a piece of wet sponge. 7. Finally, wipe with a piece of lint-free cloth out of the mosaic surface of the remaining cement and caulking agent.
Q:What are the problems with the installation of windows?
Wall plaster and hole whether there is a gap?
Q:Aluminum doors and windows production, installation need to pay attention to what? What are the technical requirements?
In the process of making the technical staff to do every standard process, because the aluminum alloy doors and windows waterproof performance itself is not waterproof profiles, it must be used for each connection point waterproof film, glass must be sealed with glass glue inside and outside
Q:Doors and windows should be used to set aside the hole to install, not to use side of the installation side of the mouth or the first installation of the construction method What is the meaning, which can explain in detail
2 can only be the installation method is different from the actual measurement of the end of the gray processing of the installation of the expansion screw installation ~ no plaster is the size of the doors and windows is smaller than the hole 20MM has a fixed connection
Q:What color should window frame should be?
Door frame can choose white or shallow champagne broken bridge aluminum, with more fresh. Broken bridge aluminum color is also very rich, any color can choose.
Q:How to deal with the door frame and the wall connection
First, now the doors and windows and doors of the installation, most of the woodworking board is used to do the background, the use of wood screws and styrofoam fixed, and then the door, window sets of lines sealed; there are individual lining plate, Position and size, the use of styrofoam filled with fixed (gap must be more than 10mm) Second, the polyurethane foam is the installation of doors and windows in the current convenience of the popular process, if it is to consider the problem of seepage of the window, you can refer to the following process operation: The connection of the window to the wall shall first check the number of connectors and the right connector of the brackets and the windows. Check that there is no shaking and jogging between the frame and the wall before no capping. If you find the above phenomenon, the embedded parts to be reinforced, and around the window frame with foam polyurethane to fill, to stay 6 × 6 seam with silicone embedded real. 2. Grass-roots plastering to strictly check the location and size of the hole to prevent the installation of the window frame and then adjust the overall impact of grass-roots level, grass-roots construction must be strictly stratified construction. 3. In the surrounding block before the need to clean up the debris, and rinse, caulking with caulking tools will be embedded into the mortar, and layered embedded, embedded real, to enhance the anti-seepage effect. 4. The windowsill to make a certain out of the water, in order to quickly discharge the rain, the window frame around the outside are sealed with a sealant, the sill outside the lower mouth must be made of notch drip tank to prevent climbing.
Q:Do doors and windows and curtain wall construction is carried out at the same time or cross-operation? Trouble experts to mention something
Of course, is the first window behind the curtain wall, the program is this: 1, door window frame 2, plaster 3, do curtain wall main keel 4, do insulation 5, the installation of curtain wall 6, the installation of doors and windows hope to help you!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range