• Drop Forged Scaffolding Board Retaining Coupler/BRC System 1
  • Drop Forged Scaffolding Board Retaining Coupler/BRC System 2
  • Drop Forged Scaffolding Board Retaining Coupler/BRC System 3
Drop Forged Scaffolding Board Retaining Coupler/BRC

Drop Forged Scaffolding Board Retaining Coupler/BRC

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Standard:
BS1139
Grade:
8.8
Surface:
Electro-galvanized/HDG
Size:
48.3mm
Nut:
21mm/23mm
Bolt:
1/2
Weight:
0.65kg
Washer:
4mm

Drop Forged Scaffolding Board Retaining Coupler/BRC


1. Product Detail:

Size

48.3mm

Weight0.65kg/pc
T-Bolt1/2"-82mm
Nut21mm/23mm
SurfaceElectro-galvanized/HDG


2. Company Introduction

      We are a professional manufacturer of scaffolding couplers and scaffolding accessores, there are 4 forging lines in our workshop and we have our own mould machines and technicians , could meet different requests from clients. OEM also available.  All our products are made according to international standard EN74-1:2005/BS1139 and AS1576.2-2009 and we own the test machine in our factory to control the quality.

        Welcome to our factory anytime you want.


Factory View:

Drop Forged Scaffolding Board Retaining Coupler/BRC


Drop Forged Scaffolding Board Retaining Coupler/BRC


Product Details:

A. BS Type Double Coupler and Swivel Coupler 

B. German Type Double Coupler and Swivel Coupler 

C. US Type Double Coupler and Swivel Coupler

D. Italian Type Double Coupler and Swivel Coupler

E. Putlog Coupler/Single Coupler

F.  Board Retaining Coupler

G. Fixed Beam Clamp

H. Swivel Girder Coupler

I.   Sleeve Coupler

J.  Bone Joint

K. Jack Nut

L.  Forged Wing Nut and so on.......


Pictures of Scaffolding Board Retaining Coupler

Drop Forged Scaffolding Board Retaining Coupler/BRC

Drop Forged Scaffolding Board Retaining Coupler/BRC

Drop Forged Scaffolding Board Retaining Coupler/BRC



Remarks:

1. Packing: Woven bags+steel pallet or other shipping standard

2. Leading time: Reguarly 25-30 days after receving advanced payment or according to your qty.

3. Payment Term: 30% advanced payment by T/T, 70% balance against copy of BL .


Packing Picture:

Drop Forged Scaffolding Board Retaining Coupler/BRC

Drop Forged Scaffolding Board Retaining Coupler/BRC


For more informaiton, please keep in touch with Bella.

Hope to work with you together in the near future.

Thanks .






Q:What are the components of a mobile scaffolding
The utility model relates to a standard steel pipe scaffold which is connected with the main structure of the wall and is connected with the main structure of the building.
Q:I want to get a scaffolding piercing, but i just wanna know some information.. past experiences etc. So far i have two lobe piercings on both ears and the pain wasn't too bad, but i've never had a piercing on the upper ear. How much will it cost? (I live in the UK) Just some information i guess (: thanks
I have two lobe piercings on both ears, two cartilage piercings and an industrial that i got five months ago. I was expecting my industrial to be very painful but it wasn't that bad (i have a high pain tolerance though) its a bearable pain. Like all other piercings the healing process is the worst part and still when i bump it (like when im doing my hair) it hurts like a B****! lol. And don't play with it alot when you first get it, it causes scar tissue bumps. Use H20cean spray or you can do 1/4 tsp of sea salt and 1 cup of water to help heal it. The healing time is long, 4 months to a year. I paid $65 dollars in the us idk how much that is UK. It was definitely worth it though! Go for it :)
Q:What issues need to pay attention to the construction of high-level scaffolding
Where the bending, deformation of the rod should be straightened, damaged components should be repaired before they can be stored in storage, or should be changed.
Q:Okay so i have one cartilage piercing already.plan a) i just get a scaffold piercing using already the cartilage piercing i haveplan b) i get another cartilage piercing then just wait for a while get a straight titanium barbell and stick it in threw bothI also need help convincing my mom.Help Me Out Please Thnk You
Sorry to rain on your parade, but neither of those plans will work. Scaffold piercings need to be lined up a certain way in your ear, so you can't start with an existing piercing because you can't change your ear to fit what is already pierced. Scaffold piercings also need to heal with a bar in for them to be able to support a bar. You can't just get 2 cartilage piercings and stick a bar through. They won't line up and may not be able to support the extra weight of the bar, and migrate out. Seriously, do some research and wait until you are 16 at least.
Q:Scaffold removal should comply with those requirements......
Preparation of scaffold safety demolition before demolition1 check the scaffold fastener connection, the wall, the support system is in line with safety requirements.2 according to the inspection results, supplement and improve the design of the demolition process, and after the implementation of the approval.
Q:looking for a scaffolding job in dubai can anyone help?
Hi okorder , we are Dubai based scaffolding contractor.
Q:Construction scaffolding right angle fastener, rotary fastener, butt fastener weight? There are more than one meter steel pipe?Thank you!!!
Weight: 48kg above 3, single piece weight in 20Kg or so, easy to carry and construction operation. 4, the installation and removal of only bare handed, greatly improved the efficiency of the door scaffolding installed than the fastener steel tube fast 1/2 time, faster than bamboo scaffolding 2/3 time. 2 the maximum weight of a single piece is not more than 20 kg, so lifting, assembling and disassembling and transportation are convenient
Q:Scaffolding Vertical Standard, Length: 3000mm, Part Number AS1001
Please okorder Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
Q:What are the main safety problems when dismantling the scaffold
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
Q:In the Scarlet Letter, when Dimmesdale asks Hester who Chillingworth really is, why does she keep her oath to him of not revealing that he is her husband? Guilt? Morals? Thanks
The rosebush grew to become in front of the darkened, detrimental penal complicated, between many much less suitable flowers. i think of of it symbolized that there is popularity in even the worst of souls. it may serve, enable us to need, to advise some candy ethical blossom, that's found alongside the song, or relieve the darkening of a tale of human frailty and sorrow.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords